LEGALDIGMLEGALDIGM
    ← Canada
    Beta
    SOR-92-267:en

    SOR-92-267:en — Regulations Respecting the Release of Polychlorinated Dibenzo-Para-Dioxins and Polychlorinated Dibenzofurans in Effluents from Pulp and Paper Mills

    Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.

    Analyze this law with AI
    1 These Regulations may be cited as the Pulp and Paper Mill Effluent Chlorinated Dioxins and Furans Regulations. 2 In these Regulations, Act means the Canadian Environmental Protection Act, 1999; (Loi) chlorine bleaching plant means a plant in a mill where pulp is bleached by chlorine or chlorine dioxide; (usine de blanchiment au chlore) effluent flowrate means the quantity of an effluent produced by a mill in one day, measured in cubic metres; (débit) final effluent means any water that contains intermediate effluent that is released from a mill and discharged directly into the environment or into an off-site treatment system; (effluent terminal) intermediate effluent means any water that is released during any of the processes in a chlorine bleaching plant; (effluent intermédiaire) measurable concentration of 2,3,7,8-TCDD means a concentration of 2,3,7,8-TCDD that is greater than the level of quantification as defined in the Reference Method; (concentration mesurable de 2,3,7,8-TCDD) measurable concentration of 2,3,7,8-TCDF means a concentration of 2,3,7,8-TCDF that is greater than the level of quantification as defined in the Reference Method and that, when multiplied by 0.1, exceeds 5 ppq; (concentration mesurable de 2,3,7,8-TCDF) mill means a factory that contains a chlorine bleaching plant and that produces pulp or paper products, and any effluent treatment plant that is owned by the owner of that factory; (fabrique) off-site treatment system means an effluent treatment plant, other than a mill, that treats final effluent from a mill; (installation extérieure de traitement) operator means the person in charge of the operation of a mill; (exploitant) paper products includes paper, coated paper, paperboard, hardboard, boxboard, linerboard, insulating board, building board, corrugated medium, tissue or moulded cellulose product but does not include a regenerated cellulose product; (produits du papier) ppq means parts per quadrillion, being parts per 1015 parts; (ppq) Reference Method means the Reference Method for the Determination of Polychlorinated Dibenzo-para-dioxins (PCDDs) and Polychlorinated Dibenzofurans (PCDFs) in Pulp and Paper Mill Effluents, published by the Department of the Environment, Report EPS 1/RM/19, 1992, as amended from time to time; (méthode de référence) 2,3,7,8-substituted PCDDs means any polychlorinated dibenzo-para-dioxin that has the molecular formula C12H8-nC1n02, in which “n” is not less than 4 and not more than 8 and chlorine atoms are located at the 2,3,7,8 positions on the molecule; (PCDD chlorées aux positions 2,3,7 et 8) 2,3,7,8-substituted PCDFs means any polychlorinated dibenzofuran that has the molecular formula C12H8-nCln0, in which “n” is not less than 4 and not more than 8 and chlorine atoms are located at the 2,3,7,8 positions on the molecule; (PCDF chlorés aux positions 2,3,7 et 8) total PCDDs means the sum of the concentrations of all polychlorinated dibenzo-para-dioxin congeners that have the molecular formula C12H8-nCln02, in which “n” is not less than 4 and not more than 8; (PCDD totales) total PCDFs means the sum of the concentrations of all polychlorinated dibenzofuran congeners that have the molecular formula C12H8-nC1n0, in which “n” is not less than 4 and not more than 8; (PCDF totaux) 2,3,7,8-TCDD means 2,3,7,8-tetrachlorodibenzo-para-dioxin; (2,3,7,8-TCDD) 2,3,7,8-TCDF means 2,3,7,8-tetrachlorodibenzofuran. (2,3,7,8-TCDF) 3 The owner of a mill shall ensure that the operator operates the mill in accordance with these Regulations. 4 (1) Subject to subsection (2), effective July 1, 1992, no operator shall release or permit to be released into the environment final effluent that contains any measurable concentration of 2,3,7,8-TCDD or measurable concentration of 2,3,7,8-TCDF. (2) Subsection (1) does not apply before January 1, 1994 to an operator in charge of a chlorine bleaching plant that commenced operation before June 1, 1990 who submits to the Minister, within 60 days after the coming into force of these Regulations, plans, specifications and schedules for the implementation of measures that will enable the operator to achieve compliance with subsection (1). 5 For the purposes of these Regulations, samples shall be taken and concentrations shall be measured in accordance with the Reference Method. 6 (1) Effective July 1, 1992, the operator shall take samples of the final effluent in accordance with the sampling schedule for final effluent set out in Schedule I. (2) Effective July 1, 1992, the operator shall report to the Minister the concentrations of the substances set out in Schedule II that are in the final effluent samples, and the effluent flowrate of the final effluent. 7 (1) The Minister may, in writing, request that the operator conduct, within the time set out in the request, (a) specified tests to determine the presence of PCDDs and PCDFs in the final effluent, intermediate effluent and in the pulp and sludge produced in the mill; (b) specified tests to determine the effect of operating conditions in the mill on the concentration of PCDDs and PCDFs; and (c) toxicological studies on the final effluent, intermediate effluent and in the pulp and sludge produced in the mill. (2) The Minister may, in writing, request that the operator submit, within the time set out in the request, (a) results of the tests and studies conducted pursuant to subsection (1); and (b) information relating to the presence of PCDDs and PCDFs in the final effluent, intermediate effluent and in the pulp and sludge produced in the mill and relating to the operating conditions of the mill. (3) The operator shall conduct any test and study and submit any information requested by the Minister pursuant to subsection (1) or (2) within the time set out in the request. (4) The information specified in subsection 6(2) shall be submitted to the Minister within 60 days after the day on which any sample is taken pursuant to Schedule I. (5) An operator who submits to the Minister information respecting the concentration of substances pursuant to subsection 6(2) shall also submit the information required by the Reference Method. (6) The information referred to in section 6 shall be submitted in writing or in an electronic format, where the electronic format is provided by the Department of the Environment. (7) Any report or information that is submitted to the Minister pursuant to this section shall be signed by the operator. SCHEDULE I(Subsection 6(1))Sampling Schedule for Final Effluents 1Beginning on July 1, 1992 and ending on December 31, 1993, one 24-hour composite sample of the final effluent shall be collected during any day in which the chlorine bleaching plant is operating during the first month of each quarter of a given year. 2Effective January 1, 1994, one 24-hour composite sample of the final effluent shall be collected during each month during any day in which the chlorine bleaching plant is operating, with a minimum of 21 days between any sample collection. 3Effective January 1, 1995, subject to item 6, where no measurable concentration of 2,3,7,8-TCDD and no measurable concentration of 2,3,7,8-TCDF have been detected in the final effluent for the last three consecutive months, one 24-hour composite sample of the final effluent shall be collected once every quarter during any day in which the chlorine bleaching plant is operating. 4Effective January 1, 1996, subject to item 6, where no measurable concentration of 2,3,7,8-TCDD and no measurable concentration of 2,3,7,8-TCDF have been detected in the final effluent for three consecutive quarters, one 24-hour composite sample of the final effluent shall be collected annually during any day in which the chlorine bleaching plant is operating, with a minimum of 350 days between any sample collection. 5 (1)An operator may commence the monthly sampling referred to in item 2, prior to January 1, 1994, and, after at least twelve consecutive monthly samples as described in item 2, may (a)proceed to the quarterly sampling referred to in item 3, if the conditions required for quarterly sampling exist; and (b)proceed to annual sampling referred to in item 4, if the conditions required for annual sampling exist. (2)If an accelerated schedule is followed as described in subitem (1), item 6 applies to that sampling schedule. 6Where for any quarterly or annual samples there are measurable concentration of 2,3,7,8-TCDD or measurable concentration of 2,3,7,8-TCDF, one 24-hour composite sample of the final effluent shall be collected monthly until no measurable concentration of 2,3,7,8-TCDD and no measurable concentration of 2,3,7,8-TCDF have been detected for the period set out in item 3 or 4 at which time that item applies. SCHEDULE II(Subsection 6(2))Information on the Concentrations of SubstancesItemCongener2,3,7,8-substituted PCDD12,3,7,8-TCDD21,2,3,7,8-P5CDD31,2,3,4,7,8-H6CDD41,2,3,6,7,8-H6CDD51,2,3,7,8,9-H6CDD61,2,3,4,6,7,8-H7CDD70CDDTotal PCDD8TCDD9P5CDD10H6CDD11H7CDD120CDD2,3,7,8-substituted PCDF132,3,7,8-TCDF141,2,3,7,8-P5CDF152,3,4,7,8-P5CDF161,2,3,4,7,8-H6CDF171,2,3,6,7,8-H6CDF181,2,3,7,8,9-H6CDF192,3,4,6,7,8-H6CDF201,2,3,4,6,7,8-H7CDF211,2,3,4,7,8,9-H7CDF220CDFTotal PCDF23TCDF24P5CDF25H6CDF26H7CDF270CDF

    Related guides, FAQ and contract templates