Beta
SOR-2024-263:en
SOR-2024-263:en — Clean Electricity Regulations
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.
Analyze this law with AI1 The purpose of these Regulations is to protect the environment and human health from the threat of climate change by establishing a regime that prohibits excessive carbon dioxide (CO2) emissions from the use of fossil fuel to generate electricity.
2 (1) The following definitions apply in these Regulations.
ASTM means ASTM International. (ASTM)
auditor means an individual who
(a) is independent of the responsible person that is to be audited; and
(b) has knowledge of and experience with respect to
(i) the certification, operation and relative accuracy test audit of continuous emission monitoring systems, and
(ii) quality assurance and quality control procedures in relation to those systems. (vérificateur)
authorized official means
(a) in respect of a responsible person who is an individual, that individual or an individual who is authorized to act on that individual’s behalf;
(b) in respect of a responsible person that is a corporation, an officer of the corporation that is authorized to act on its behalf; and
(c) in respect of a responsible person that is another entity, an individual who is authorized to act on its behalf. (agent autorisé)
biogas means a gaseous mixture — including landfill gas and sludge digestion gas — that consists primarily of methane and CO2 that is recovered from the anaerobic decomposition of biomass and that contains other constituents that prevent it from meeting the standard for injection into the nearest natural gas pipeline. (biogaz)
biomass means material that originates from plants or animals, including animal waste, or any product derived from any of these, and includes wood, wood products, agricultural residues, biologically derived organic matter in municipal or industrial wastes, biogas, renewable natural gas, bio-alcohols, pulping liquor and other fuels that consist only of non-fossilized, biodegradable organic material that originates from plants or animals but does not originate from a geological formation. (biomasse)
Canadian offset credit means
(a) an offset credit issued under subsection 29(1) of the Canadian Greenhouse Gas Offset Credit System Regulations; or
(b) a unit or credit that is recognized under subsection 78(1) of the Output-Based Pricing System Regulations and meets the conditions set out in paragraphs 78(4)(a) to (d) of those Regulations. (crédit compensatoire canadien)
CEMS Protocol means the document entitled Protocols and performance specifications for continuous monitoring of gaseous emissions from thermal power generation and other sources, published by the Department of the Environment in 2023. (Protocole SMECE)
coal includes petroleum coke and synthetic gas that is derived from coal or petroleum coke. (charbon)
combustion engine means an engine, other than an engine that is self-propelled or designed to be propelled while performing its function, that
(a) operates according to the Brayton thermodynamic cycle and combusts fossil fuel to produce a net amount of motive power; or
(b) combusts fossil fuel and uses reciprocating motion to convert thermal energy into mechanical work. (moteur à combustion)
commissioning date, in respect of a unit, means the day on which the oldest boiler or combustion engine in the unit starts operating. (date de mise en service)
continuous emission monitoring system or CEMS means equipment for the sampling, conditioning and analyzing of emissions from a given source and the recording of data related to those emissions. (système de mesure et d’enregistrement en continu des émissions ou SMECE)
deduction period means the period for which the beginning and end is determined in accordance with subsection 25(2). (période de déduction)
electricity generation capacity means the capacity of a unit, expressed in MW and determined in accordance with section 6. (capacité de production d’électricité)
electricity system means an electricity system that is subject to the standards of the North American Electric Reliability Corporation. (réseau électrique)
electricity system operator, in respect of a unit, means the person that operates the electricity system within a province and to which the unit is required to report in order to transmit electricity to the electricity system. (exploitant de réseau électrique)
facility means the units, buildings, other structures and stationary equipment — including equipment used for hydrogen or ammonia production and equipment used for fuel production from coal gasification — that have in common at least one owner or person who has the charge, management or control of each of them and that are located on a single site, or on contiguous or adjacent sites that function as a single integrated site, where an industrial activity is carried out. (installation)
fossil fuel means a fuel, other than biomass, that releases CO2 when combusted or that is produced using a process that results in CO2 emissions. (combustible fossile)
GHGRP means the document entitled Canada’s Greenhouse Gas Quantification Requirements, Greenhouse Gas Reporting Program, Version 5.0, published by the Department of the Environment in December 2021. (PDGES)
maximum continuous rating means the maximum net power that a unit can continuously sustain, expressed in MW, as reported to the electricity system operator for the unit. (puissance maximale continue)
net supply means the quantity of electricity supplied to an electricity system during a calendar year, expressed in GWh and determined in accordance with subsection 13(2). (solde de fourniture)
planned unit means a unit referred to in section 3. (groupe prévu)
renewable natural gas means natural gas that meets the standard for injection into the nearest natural gas pipeline and that is either gas derived from the processing of biogas or synthetic natural gas derived from biomass. (gaz naturel renouvelable)
responsible person means an owner or a person that has the charge, management or control of a unit. (personne responsable)
standard conditions means a temperature of 15˚C and a pressure of 101.325 kPa. (conditions normales)
unit means an assembly consisting of equipment that is physically connected and that operates together to generate electricity, including at least one boiler or combustion engine along with any other equipment, such as duct burners or other combustion devices, heat recovery systems, steam turbines, generators, emission control devices and carbon capture and storage systems. (groupe)
useful thermal energy means energy in the form of steam or hot water that is destined for a use, other than the generation of electricity, that would have required the consumption of energy in the form of fuel or electricity had that steam or hot water not been used. (énergie thermique utile)
(2) For the purposes of the definition unit in subsection (1), equipment that is connected only by a carbon capture and storage system is not considered to be physically connected. However, that carbon capture and storage system is considered to be part of each unit to which it is connected.
3 A unit is planned if its commissioning date is within the period that begins on January 1, 2025 and ends on December 31, 2034 and if the Minister is satisfied that the unit is substantially the same on its commissioning date as the unit in relation to which the following criteria were met:
(a) on or before December 31, 2025,
(i) all information required to initiate any impact assessment or environmental assessment required in relation to the unit under a federal or provincial law has been submitted to the relevant authority,
(ii) the proponent responsible for the development of the unit owns or has a lease for the land on which the unit is located,
(iii) all information required to initiate the process to obtain any permit required to begin construction at the site where the unit is located has been submitted to the relevant authority, and
(iv) contracts with a value of at least $10 million have been entered into for the purchase of any equipment referred to in the definition unit in subsection 2(1) for use in the unit; and
(b) on or before December 31, 2027, construction has begun at the site where the unit is located.
4 (1) A reference to any document incorporated by reference into these Regulations, other than the GHGRP and the CEMS Protocol, is a reference to the most recently published version of the document.
(2) For the purposes of interpreting any document that is incorporated by reference into these Regulations, “should” is to be read as “must” and any recommendation or suggestion is to be read as an obligation.
(3) For the purposes of these Regulations, any reference in the GHGRP to the document entitled Reference Method for Source Testing: Quantification of Carbon Dioxide Releases by Continuous Emission Monitoring Systems from Thermal Power Generation is to be read as a reference to the CEMS Protocol.
(4) For the purposes of these Regulations, the CEMS Protocol is to be read as follows:
(a) the references to “appropriate regulatory authority”, “applicable regulating authority”, “appropriate regulatory agency” and “corresponding regulating authority” are to be read as references to the Minister, except in section 5.3.1, where “the appropriate regulatory authority” is to be read as “subsection 46(1) of the Clean Electricity Regulations”; and
(b) the reference to “the most recent version of the ECCC Canada’s Greenhouse Gas Quantification Requirements” in section 7.1 is to be read as a reference to “section 16 of the Clean Electricity Regulations”.
5 (1) These Regulations begin to apply in respect of a unit on the day on which the unit meets the following criteria and, subject to subsection 43(2), continue to apply until the responsible person for the unit submits the notice of permanent cessation of electricity generation in accordance with subsection 43(1):
(a) the unit has an electricity generation capacity of at least 25 MW;
(b) the unit generates electricity using fossil fuel; and
(c) the unit is connected, directly or indirectly, to an electricity system.
(2) Subject to subsection (3), a unit that has an electricity generation capacity of less than 25 MW is deemed to meet the criterion set out in paragraph (1)(a) if
(a) the unit’s commissioning date is on or after January 1, 2025; and
(b) the sum of the electricity generation capacity of all units, other than planned units, that are located at the facility where the unit is located and that have commissioning dates on or after January 1, 2025 is at least 25 MW.
(3) These Regulations do not apply in respect of a planned unit that has an electricity generation capacity of less than 25 MW.
6 (1) Subject to subsection (6), a unit’s electricity generation capacity is
(a) the unit’s maximum gross power, measured at the electrical terminals of the unit’s generators and determined in accordance with subsections (2) to (4); or
(b) if the responsible person has not determined the unit’s maximum gross power, the unit’s most recent maximum continuous rating.
(2) To determine a unit’s maximum gross power, the responsible person must conduct, in the presence of the performance test verifier referred to in subsection (3), a performance test that
(a) is conducted on or after January 1, 2025;
(b) is a continuous test that lasts at least two hours;
(c) does not compromise the continued operation of the unit by exceeding the operating specifications for temperature, pressure or electrical conductivity recommended by the manufacturer of the equipment that is part of the unit;
(d) does not require that the planned maintenance schedule of the unit be altered; and
(e) has results that are adjusted to standard conditions.
(3) The performance test verifier is an individual who
(a) is independent of the responsible person; and
(b) has demonstrated knowledge of the performance testing of units that generate electricity using fossil fuel and at least five years’ experience with respect to such testing.
(4) A responsible person that conducts a performance test must submit to the Minister a performance test report prepared by the performance test verifier that contains the information set out in Schedule 1.
(5) A responsible person that submits a performance test report for a unit after the registration report for the unit is submitted under subsection 7(1), paragraph 7(2)(a) or subsection 8(2) must submit to the Minister, no later than 60 days after the day on which the test is conducted, the performance test report along with the updated registration report referred to in subsection 7(4).
(6) If, during a calendar year in which a unit is subject to an emission limit under subsection 9(1), the maximum gross power or maximum continuous rating of the unit changes, the unit’s electricity generation capacity for that calendar year is determined by the formula
is the ith period of the calendar year, where “i” goes from 1 to n and where n is the number of periods in the calendar year during which the unit’s electricity generation capacity differs from the preceding or subsequent period;
is the electricity generation capacity of the unit during the ith period of the calendar year;
is the length of the ith period of the calendar year, expressed in days; and
is the number of days during the calendar year that the unit’s electricity generation capacity is greater than zero.
(7) The electricity generation capacity determined under subsection (2) or (6) is to be rounded to the nearest whole number or, if equidistant between two consecutive whole numbers, to the higher number.
7 (1) Subject to section 8, the responsible person for a unit that meets the criteria set out in section 5 must submit to the Minister a registration report for the unit that contains the information set out in Schedule 2 by the later of
(a) December 31, 2025, and
(b) the 60th day after the day on which the unit meets the criteria set out in section 5.
(2) If a unit for which a registration report has been submitted under subsection (1) is modified, such as by adding or removing a piece of equipment or changing how equipment is physically connected, and that modification results in the creation of one or more units that meet the criteria set out in section 5, the responsible person must submit to the Minister
(a) a registration report for each unit that was created that contains the information set out in Schedule 2 within 60 days after the day on which the unit was created; and
(b) the notice of permanent cessation of electricity generation referred to in subsection 43(1) for the original unit or the updated registration report referred to in subsection (4) for that unit.
(3) On receipt of the registration report referred to in subsection (1), paragraph (2)(a) or subsection 8(2), the Minister must assign a registration number to the unit and inform the responsible person of that registration number.
(4) If there is a change to any information submitted under this section or subsection 8(2), the responsible person must submit to the Minister, no later than 60 days after the day on which the change occurs, an updated registration report for the unit that contains the information set out in Schedule 2.
8 (1) A responsible person may register a unit as multiple subunits if
(a) each subunit would be a unit as defined in subsection 2(1) if it were not physically connected to any of the other subunits;
(b) each subunit has a maximum continuous rating;
(c) each subunit produces useful thermal energy;
(d) each boiler and combustion engine, as well as any other equipment that is part of the unit, is accounted for in one of the subunits; and
(e) either each boiler and combustion engine in the unit started operating on or before December 31, 2024 or each boiler and combustion engine was part of a planned unit on the unit’s commissioning date.
(2) To register a unit as multiple subunits, the responsible person must
(a) in the case of a unit for which a registration report has not been submitted under section 7, submit to the Minister a registration report for each subunit that contains the information set out in Schedule 2 by the later of
(i) December 31, 2025, and
(ii) the 60th day after the day on which the unit meets the criteria set out in section 5; or
(b) in the case of a unit for which a registration report has been submitted under section 7, submit to the Minister the following reports no later than the day before the day on which any of the subunits would, if registered, be subject to an emission limit under subsection 9(1):
(i) an updated registration report for the unit that contains the information set out in Schedule 2 in respect of one of the subunits, and
(ii) a registration report for each of the other subunits that contains the information set out in Schedule 2.
(3) If a unit is registered as multiple subunits in accordance with subsection (2),
(a) each subunit is deemed to be a unit to which these Regulations apply; and
(b) these Regulations, other than this section, cease to apply in respect of the unit that is registered as multiple subunits.
(4) A registered subunit is no longer deemed to be a unit, other than for the purposes of subsection 43(2), beginning on the day on which the responsible person for the subunit submits the notice of permanent cessation of electricity generation referred to in subsection 43(1).
(5) The responsible person for a unit that has been registered as multiple subunits must notify the Minister, no later than 60 days after the day on which the change occurs, if the sum of the maximum continuous rating for each of the subunits increases by 15% or more from the sum of the maximum continuous ratings reported in the registration reports submitted for the subunits under subsection (2).
(6) If, on the day on which the increase referred to in subsection (5) occurs, one or more of the subunits has not reached the end of its prescribed life, as determined in accordance with subsection 10(3) or section 11, subsection 9(1) begins to apply in respect of each of those subunits on the later of
(a) January 1, 2035, and
(b) January 1 of the calendar year following the year in which the increased maximum continuous rating was reported to the electricity system operator.
9 (1) The responsible person for a unit must not emit from the unit in a calendar year a quantity of CO2, determined in accordance with section 12, that exceeds the limit, expressed in tonnes, determined by the formula
is the unit’s electricity generation capacity for the calendar year; and
is the emissions intensity applicable to the calendar year and is
65 tonnes of CO2 emissions per GWh for the 2035 to 2049 calendar years, and
0 tonnes of CO2 emissions per GWh for the 2050 and subsequent calendar years.
(2) The emission limit determined under subsection (1) is to be rounded to the nearest whole number or, if equidistant between two consecutive whole numbers, to the higher number.
10 (1) Subject to subsection (2), subsections 9(1), 12(1) and 13(1) do not apply in respect of a unit, other than one that combusts coal, until January 1 of the calendar year following the unit’s end of prescribed life if it
(a) has a commissioning date after December 31, 2009 but before January 1, 2025;
(b) is a planned unit; or
(c) is a boiler unit referred to in subsection 3(4) of the Regulations Limiting Carbon Dioxide Emissions from Natural Gas-fired Generation of Electricity that has an end of prescribed life after December 31, 2034.
(2) Subsections 9(1), 12(1) and 13(1) begin to apply in respect of a unit referred to in subsection (1) on the later of the following dates if the maximum continuous rating for the unit increases by 15% or more from the maximum continuous rating reported in the registration report submitted for the unit under subsection 7(1), paragraph 7(2)(a) or subsection 8(2):
(a) January 1, 2035, and
(b) January 1 of the calendar year following the year in which the increased maximum continuous rating was reported to the electricity system operator.
(3) For the purposes of subsection (1) but subject to section 11, a unit’s end of prescribed life is on
(a) December 31 of the calendar year that is 25 years after the unit’s commissioning date, in the case of a unit referred to in paragraph (1)(a);
(b) December 31, 2049, in the case of a planned unit; and
(c) December 31 of the calendar year before the prohibition set out in subsection 4(2) of the Regulations Limiting Carbon Dioxide Emissions from Natural Gas-fired Generation of Electricity would have applied to the unit, as determined under that subsection, in the case of a unit referred to in paragraph (1)(c).
11 (1) For the purposes of subsection 10(1), the responsible person for a unit may elect to end the unit’s prescribed life on a date that is before the date set out for the unit in subsection 10(3) and that is no earlier than December 31, 2034.
(2) The responsible person must, in order to make the election, submit the following information to the Minister on or before the date that is elected to be the unit’s end of prescribed life:
(a) the registration number assigned to the unit by the Minister under subsection 7(3); and
(b) the date that is elected as the unit’s end of prescribed life.
(3) An election made under this section may not be changed or revoked.
12 (1) The responsible person for a unit must determine the quantity of CO2, expressed in tonnes, emitted from the unit in each calendar year in accordance with the formula
is the quantity of CO2 emissions attributed to the unit for the calendar year, expressed in tonnes and determined by the formula
is the quantity of CO2 emissions from the combustion of fossil fuel in the unit during the calendar year, determined in accordance with subsection (3),
is the quantity of CO2 emissions attributed to the production of useful thermal energy by the unit during the calendar year, determined in accordance with section 21,
is the quantity of CO2 emissions attributed to electricity generated by the unit that is used internally, during the calendar year, at the facility where the unit is located and is
equal to zero, in the case of
any calendar year in which the unit does not produce useful thermal energy,
any unit, other than a planned unit, that has a commissioning date after December 31, 2024, and
every calendar year after 2049, and
determined in accordance with section 22, in any other case,
is the quantity of CO2 captured from the unit during the calendar year and stored in a storage project, determined in accordance with section 23,
is the quantity of CO2 emissions from the production of the hydrogen, ammonia and purchased or transferred steam used by the unit to generate electricity during the calendar year, determined in accordance with section 24, and
is the quantity of CO2 emissions attributed to the unit for any deduction period during the calendar year, determined in accordance with section 27;
is the quantity of CO2, expressed in tonnes, that corresponds to the number of Canadian offset credits remitted for the unit for the calendar year in accordance with section 28; and
is the quantity of CO2, expressed in tonnes, that corresponds to the number of compliance credits remitted for the unit for the calendar year in accordance with section 33.
(2) The quantity determined for E under subsection (1) is to be rounded to the nearest whole number or, if equidistant between two consecutive whole numbers, to the higher number.
(3) The quantity referred to in the description of Eu in subsections (1) and 27(1) must be determined in accordance with
(a) section 15, in the case of a unit that combusted fossil fuel from a coal gasification system during the calendar year;
(b) section 16, in the case of a unit that combusted biomass and combusted fossil fuel from a coal gasification system during the calendar year;
(c) section 19, in the case of a unit that combusted biomass but did not combust fossil fuel from a coal gasification system during the calendar year; and
(d) section 15 or 19, in any other case.
(4) Despite subsection (1), the responsible person for a unit may elect to assign a value of zero to any of Eth, Eint, Eccs and Eec when determining, for the unit, the quantity referred to in the description of E in that subsection.
(5) For the purposes of subsection (3), coal gasification system includes a coal gasification system that is in part located underground.
13 (1) The responsible person for a unit must, for each calendar year, determine the net supply from the facility where the unit is located.
(2) The net supply from a facility is determined by the formula
is the quantity of electricity transmitted from the facility to an electricity system during the calendar year;
is the quantity of electricity transmitted to the facility from an electricity system during the calendar year;
is the quantity of electricity allocated to the facility for the calendar year in accordance with subsection (4);
is the sum of the quantities of electricity generated at the facility during the calendar year by
any unit that has not reached the end of its prescribed life as determined in accordance with subsection 10(3) or section 11,
any unit to which these Regulations do not apply, other than a unit that has been registered as multiple subunits in accordance with section 8, and
any source of electricity generation at the facility that is not a unit; and
is the sum of the quantities of electricity generated by any unit located at the facility, other than a unit referred to in the description of Qna, during any deduction period during the calendar year.
(3) The quantities of electricity referred to in subsection (2) must be expressed in GWh and must be measured
(a) in the case of the quantities referred to in the descriptions of Qt, Qr and Qa, using meters that measure the transfer of electricity; and
(b) in the case of the quantities referred to in the descriptions of Qna and Qec, at the electrical terminals of the generators of the unit or, in the case of a source of electricity generation that is not a unit, at the electrical terminals of the source.
(4) A quantity must not be assigned to Qa in subsection (2) unless, during the calendar year for which the quantity is assigned, the facility transmits electricity to an electricity system and supplies useful thermal energy to a recipient facility and the following conditions are met:
(a) the recipient facility is not a facility where a unit to which these Regulations apply is located;
(b) the quantity assigned to Qa does not exceed the quantity of electricity transmitted to the recipient facility from the electricity system during that calendar year; and
(c) the responsible person obtains from the recipient facility documentation that
(i) indicates the quantity of electricity transmitted to the recipient facility from the electricity system during the calendar year, and
(ii) demonstrates that the quantity of electricity was measured using an electricity meter that is installed, maintained and calibrated in accordance with subsections 36(1) and (2) and that enables measurements to be made in accordance with subsection 36(3).
(5) A quantity of electricity generated by a unit must not be included in more than one deduction period for the purposes of determining the quantity for Qec in subsection (2).
14 (1) The responsible person for a unit is exempt from the application of subsection 9(1) and sections 39 and 41 with respect to the unit for any calendar year in which the net supply from the facility where the unit is located is zero or less.
(2) The responsible person for a unit is exempt from the application of sections 12 and 15 to 24 with respect to the unit if
(a) the net supply from the facility where the unit is located is zero or less for each calendar year in which subsection 13(1) applies in respect of the unit; and
(b) the responsible person submits to the Minister a declaration of net supply in accordance with subsections (3) and (4).
(3) The declaration must contain
(a) the registration number assigned to each unit located at the facility by the Minister under subsection 7(3);
(b) a statement that the facility operates in such a manner that it is reasonable to conclude that the net supply from the facility will be zero or less for each calendar year in which subsection 13(1) applies in respect of the unit; and
(c) an attestation, dated and signed by the responsible person or its authorized official, that the declaration is accurate and complete.
(4) The declaration must be submitted within the 12 months before any unit at the facility would have been subject to an emission limit under subsection 9(1) had the unit not been subject to an exemption, under subsection (1), from the application of that subsection.
(5) The exemption referred to in subsection (2) ends on December 31 of the calendar year before any calendar year in which the net supply from the facility is greater than zero.
15 (1) For the purposes of paragraphs 12(3)(a) and (d), the quantity of CO2 emissions from the combustion of fossil fuel in a unit during a calendar year must be measured using a CEMS and is determined, subject to section 17, in accordance with sections 7.1 to 7.5 of the CEMS Protocol.
(2) The quantity of CO2 emissions from a unit equipped with multiple CEMS is determined by adding together the quantity of CO2 emissions measured by each CEMS.
16 (1) For the purposes of paragraph 12(3)(b), the quantity of CO2 emissions from the combustion of fossil fuel in a unit during a calendar year must be measured using a CEMS and is determined by the formula
is the quantity of CO2 emissions from the unit, expressed in tonnes, from the combustion of fossil fuel and biomass during the calendar year, determined in accordance with section 15 or 17, as applicable;
is the volume of CO2 emissions from the combustion of fossil fuel in the unit during the calendar year, expressed in m3 at standard conditions and determined by the formula
is the ith fossil fuel type combusted in the unit during the calendar year, where “i” goes from 1 to n and where n is the number of fossil fuel types combusted,
is the quantity of fossil fuel type “i” combusted in the unit during the calendar year, determined
for a gaseous fuel, in the same manner used in the determination of Vf in paragraph 20(1)(a) and expressed in m3 at standard conditions,
for a liquid fuel, in the same manner used in the determination of Vf in paragraph 20(1)(b) and expressed in kL, and
for a solid fuel, in the same manner used in the determination of Mf in paragraph 20(1)(c) and expressed in tonnes,
is the fuel-specific carbon-based F-factor for each fossil fuel type “i” — being either the F-factor set out in Appendix A of the CEMS Protocol or, for fuels not listed in that Appendix, the F-factor determined in accordance with that Appendix — corrected to be expressed in m3 of CO2/GJ at standard conditions, and
is the higher heating value for each fossil fuel type “i” that is measured in accordance with subsection (2) or the default higher heating value set out in column 2 of Schedule 3 for the fuel type set out in column 1;
is the volume of CO2 emissions resulting from combustion of fossil fuel and biomass in the unit during the calendar year, expressed in m3 at standard conditions and determined by the formula
is the tth hour, where “t” goes from 1 to n and where n is the total number of hours during which the unit generated electricity in the calendar year,
is the average concentration of CO2 in relation to all gases in the stack emitted from the combustion of fuel in the unit during each hour “t” — or, if applicable, a calculation made in accordance with section 7.4 of the CEMS Protocol of that average concentration of CO2 based on a measurement of the concentration of oxygen (O2) in those gases in the stack — expressed as a percentage on a wet basis, and
is the average volumetric flow during that hour, measured on a wet basis by a stack gas volumetric flow monitor and expressed in m3 at standard conditions; and
is the quantity of CO2 emissions, expressed in tonnes, that is released from the use of sorbent to control the emission of sulphur dioxide from the unit during the calendar year, as determined by the formula
is the quantity of sorbent, such as calcium carbonate (CaCO3), expressed in tonnes,
is the stoichiometric ratio, on a mole fraction basis, of CO2 released on usage of one mole of sorbent, which is equal to 1 if the sorbent is CaCO3, and
is the molecular mass of the sorbent, which is equal to 100 if the sorbent is CaCO3.
(2) The higher heating value of a fossil fuel must be measured
(a) in the case of a gaseous fuel,
(i) in accordance with one of the following standards, as applicable:
(A) ASTM D1826, entitled Standard Test Method for Calorific (Heating) Value of Gases in Natural Gas Range by Continuous Recording Calorimeter,
(B) ASTM D3588, entitled Standard Practice for Calculating Heat Value, Compressibility Factor, and Relative Density of Gaseous Fuels,
(C) ASTM D4891, entitled Standard Test Method for Heating Value of Gases in Natural Gas and Flare Gases Range by Stoichiometric Combustion,
(D) Gas Processors Association Standard 2172, entitled Calculation of Gross Heating Value, Relative Density, Compressibility and Theoretical Hydrocarbon Liquid Content for Natural Gas Mixtures for Custody Transfer, or
(E) Gas Processors Association Standard 2261, entitled Analysis for Natural Gas and Similar Gaseous Mixtures by Gas Chromatography, or
(ii) by means of a direct measuring device, except that if the measuring device provides only lower heating values, those lower heating values must be converted to higher heating values;
(b) in the case of a liquid fuel that is
(i) an oil or a liquid fuel derived from waste, in accordance with one of the following standards, as applicable:
(A) ASTM D240, entitled Standard Test Method for Heat of Combustion of Liquid Hydrocarbon Fuels by Bomb Calorimeter, or
(B) ASTM D4809, entitled Standard Test Method for Heat of Combustion of Liquid Hydrocarbon Fuels by Bomb Calorimeter (Precision Method), and
(ii) any other liquid fuel type, in accordance with an applicable ASTM standard for the measurement of the higher heating value of the fuel type or, if there is no such ASTM standard, in accordance with an applicable internationally recognized method; and
(c) in the case of a solid fuel that is
(i) coal, in accordance with ASTM D5865, entitled Standard Test Method for Gross Calorific Value of Coal and Coke, and
(ii) any other solid fuel type, in accordance with an applicable ASTM standard for the measurement of the higher heating value of the fuel type or, if there is no such ASTM standard, in accordance with an applicable internationally recognized method.
17 If a unit is located at a facility where there are one or more other units and a CEMS measures emissions from that unit and at least one other unit at a common stack rather than at the exhaust duct of each unit that shares the common stack, the quantity of CO2 emissions attributed to that unit is determined, based on the ratio of the heat input of that unit to the total heat input of all the units sharing the common stack, by the formula
is the jth fuel type combusted during the calendar year in a unit where “j” goes from 1 to y and where y is the number of fuel types combusted;
is the quantity of fuel type “j” combusted in the unit “u” during the calendar year, determined
for a gaseous fuel, in the same manner used in the determination of Vf in paragraph 20(1)(a) and expressed in m3 at standard conditions,
for a liquid fuel, in the same manner used in the determination of Vf in paragraph 20(1)(b) and expressed in kL, and
for a solid fuel, in the same manner used in the determination of Mf in paragraph 20(1)(c) and expressed in tonnes;
is the higher heating value for each fuel type “j” combusted in the unit “u” that is measured in accordance with subsection 16(2) or the default higher heating value set out in column 2 of Schedule 3 for the fuel type set out in column 1;
is the ith unit, where “i” goes from 1 to x and where x is the number of units that share the common stack;
the quantity of fuel type “j” combusted in each unit “i” during the calendar year, determined for a gaseous fuel, a liquid fuel and a solid fuel, respectively, in the manner set out in the description of Qu,j;
is the higher heating value for each fuel type “j” combusted in each unit “i” that is measured in accordance with subsection 16(2) or the default higher heating value set out in column 2 of Schedule 3 for the fuel type set out in column 1; and
is the quantity of CO2 emissions, expressed in tonnes, from the combustion of all fuels in all the units that share the common stack during the calendar year, measured using a CEMS at the common stack and determined in accordance with sections 7.1 to 7.5 of the CEMS Protocol.
18 (1) A responsible person that uses a CEMS to measure CO2 emissions for the purposes of any of sections 15 to 17 must ensure that the requirements set out in sections 3, 4 and 6 of the CEMS Protocol are met.
(2) The CEMS must be certified in accordance with section 5 of the CEMS Protocol before it is used for the purposes of these Regulations.
(3) For each calendar year during which a CEMS is used to measure CO2 emissions from a unit, the responsible person must
(a) obtain a CEMS report, signed by an auditor, that contains the information set out in Schedule 4 in respect of the CEMS; and
(b) if the emissions report referred to in subsection 39(1) is required for the unit for that calendar year, submit the CEMS report along with the emissions report.
19 For the purposes of paragraphs 12(3)(c) and (d), the quantity of CO2 emissions from the combustion of fossil fuel in a unit during a calendar year is determined by the formula
is the ith fossil fuel type combusted in the unit during the calendar year, where “i” goes from 1 to n and where n is the number of fossil fuel types combusted;
is the quantity of CO2 emissions from the combustion of each fossil fuel type “i” in the unit during the calendar year, expressed in tonnes, as determined for that fossil fuel type in accordance with section 20; and
is the quantity of CO2 emissions that is released from the sorbent used to control the emission of sulphur dioxide from the unit during the calendar year, expressed in tonnes and determined by the formula
is the quantity of sorbent, such as CaCO3, expressed in tonnes,
is the stoichiometric ratio, on a mole fraction basis, of CO2 released on usage of one mole of sorbent, which is equal to 1 if the sorbent is CaCO3, and
is the molecular mass of the sorbent, which is equal to 100 if the sorbent is CaCO3.
20 (1) The quantity assigned to Ei in section 19 is, for each type of fossil fuel combusted in the unit during a calendar year, determined by one of the following formulas, as applicable:
(a) in the case of a gaseous fuel,
is the volume of the fossil fuel combusted during the calendar year, determined using flow meters and expressed in m3 at standard conditions,
is the weighted average of the carbon content of the fossil fuel, determined in accordance with subsection (4) and expressed in kg of carbon per kg of the fossil fuel,
is the average molecular mass of the fossil fuel, determined based on fuel samples taken in accordance with section 34 and expressed in kg per kg-mole of the fossil fuel, and
is the molar volume conversion factor of 23.645 m3 at standard conditions, per kg-mole of the fossil fuel at standard conditions;
(b) in the case of a liquid fuel,
is the volume of the fossil fuel combusted during the calendar year, determined using flow meters and expressed in kL, and
is the weighted average of the carbon content of the fossil fuel, determined in accordance with subsection (4) at the same temperature as that used in the determination of Vf and expressed in tonnes of carbon per kL of the fossil fuel; and
(c) in the case of a solid fuel,
is the mass of the fossil fuel combusted during the calendar year, determined, as the case may be, on a wet or dry basis using a measuring device and expressed in tonnes, and
is the weighted average of the carbon content of the fossil fuel, determined in accordance with subsection (4) on the same wet or dry basis as that used in the determination of Mf and expressed in kg of carbon per kg of the fossil fuel.
(2) If a unit that combusts natural gas is supplied by a pipeline network into which renewable natural gas is injected, the volume of natural gas to be used in determining the value for Vf in paragraph (1)(a) is determined by the formula
is the total volume of natural gas and renewable natural gas supplied to the unit that is combusted during the calendar year, determined using flow meters and expressed in m3 at standard conditions; and
is the volume of renewable natural gas that may be claimed by the unit during the calendar year, determined in accordance with subsection (3) and expressed in m3 at standard conditions.
(3) For the purposes of determining the value for VRNG in subsection (2), a volume of renewable natural gas may be claimed for a calendar year only if
(a) a contractual agreement specifies that the volume is supplied to the unit for the calendar year;
(b) the volume is kept physically separated from any other substance and is clearly identifiable as renewable natural gas from the time it is produced until the time it is injected into a pipeline network to which the unit is connected;
(c) the responsible person for the unit is able to identify each producer of the renewable natural gas supplied to the unit under the contractual agreement referred to in paragraph (a) and the volume supplied by each producer;
(d) the volume supplied by each producer does not exceed the volume of renewable natural gas produced by that producer that is injected during the calendar year into a pipeline network to which the unit is connected;
(e) the volume is not being used to create credits in a jurisdiction outside Canada or to comply with a requirement relating to greenhouse gas emissions that is set by a jurisdiction outside Canada;
(f) the volume is not being used by an end user, other than the responsible person, to create credits in Canada or to comply with a requirement relating to greenhouse gas emissions set out in a federal or provincial law; and
(g) the responsible person for the unit submits to the Minister, in the emissions report submitted under section 39 for the calendar year, the information set out in section 8 of Schedule 5 in respect of the volume.
(4) The weighted average CCA referred to in paragraphs (1)(a) to (c) is determined by the formula
is the ith sampling period that is set out for the fuel type in subsection 34(2), where “i” goes from 1 to n and where n is the number of sampling periods;
is the carbon content of each sample or composite sample, as the case may be, of the fossil fuel for the ith sampling period — expressed for gaseous fuels, liquid fuels and solid fuels, respectively, in the same unit of measure as that set out in the description of CCA in paragraph (1)(a), (b) or (c), as applicable — as provided by the supplier of the fossil fuel to the responsible person or, if not so provided, as determined in the following manner:
in the case of a gaseous fuel,
in accordance with one of the following standards, as applicable:
ASTM D1945, entitled Standard Test Method for Analysis of Natural Gas by Gas Chromatography,
ASTM UOP539, entitled Refinery Gas Analysis by Gas Chromatography,
ASTM D7833, entitled Standard Test Method for Determination of Hydrocarbons and Non-Hydrocarbon Gases in Gaseous Mixtures by Gas Chromatography, or
API Technical Report 2572, entitled Carbon Content, Sampling, and Calculation, published by the American Petroleum Institute, or
by means of a direct measuring device,
in the case of a liquid fuel, in accordance with one of the following standards or methods, as applicable:
API Technical Report 2572, entitled Carbon Content, Sampling, and Calculation, published by the American Petroleum Institute,
ASTM D5291, entitled Standard Test Methods for Instrumental Determination of Carbon, Hydrogen, and Nitrogen in Petroleum Products and Lubricants, or
the ASTM standard that applies to the fossil fuel type, or if there is no such ASTM standard, an applicable internationally recognized method, and
in the case of a solid fuel, on the same wet or dry basis as that used in the determination of CCA, in accordance with
for a solid fuel derived from waste, ASTM E777, entitled Standard Test Method for Carbon and Hydrogen in the Analysis Sample of Refuse-Derived Fuel, and
for any other solid fuel type, in accordance with an ASTM standard for the measurement of the carbon content of the fuel type or, if there is no such ASTM standard, in accordance with an applicable internationally recognized method; and
is the volume or mass, as the case may be, of the fossil fuel combusted during the ith sampling period, determined
using flow meters and expressed in m3 at standard conditions, in the case of a gaseous fuel,
using flow meters and expressed in kL, in the case of a liquid fuel, and
using a measuring device and expressed in tonnes, on the same wet or dry basis as that used in the determination of CCA, in the case of a solid fuel.
21 The quantity of CO2 emissions attributed to the production of useful thermal energy by a unit during a calendar year is determined by the formula
is the net quantity of useful thermal energy, expressed in GJ, determined by the formula
is the tth period, where “t” goes from 1 to x and where x is the total number of periods during which the unit produced useful thermal energy during the calendar year,
is the ith heat stream exiting the unit, where “i” goes from 1 to n and where n is the total number of heat streams exiting the unit,
is the average specific enthalpy of the ith heat stream exiting the unit during period “t”, expressed in GJ/tonne and determined based on the measurement, using a continuous measuring device, of the temperature and pressure of that heat stream,
is the mass flow of the ith heat stream exiting the unit during period “t”, expressed in tonnes and determined using a continuous measuring device,
is the jth heat stream, other than condensate return, entering the unit, where “j” goes from 1 to m and where m is the total number of heat streams entering the unit,
is the average specific enthalpy of the jth heat stream, other than condensate return, entering the unit during period “t”, expressed in GJ/tonne and determined based on the measurement, using a continuous measuring device, of the temperature and pressure of that heat stream, and
is the mass flow of the jth heat stream, other than condensate return, entering the unit during period “t”, expressed in tonnes and determined using a continuous measuring device; and
is the emission intensity of a reference boiler, set to 0.0556 tonnes of CO2 emissions per GJ.
22 The quantity of CO2 emissions attributed to electricity generated by a unit that is used internally, during a calendar year, at the facility where the unit is located is determined by the formula
is the quantity of electricity generated by the unit that is used internally, during the calendar year, at the facility where the unit is located, expressed in GWh and determined by the formula
is the sum of the total gross electricity generated by each unit at the facility that is subject to an emission limit under subsection 9(1) during the calendar year, expressed in GWh and measured for each unit at the electrical terminals of the unit’s generators,
is the net supply from the facility for the calendar year, and
is the total gross electricity generated by the unit during the calendar year, expressed in GWh and measured at the electrical terminals of the unit’s generators; and
is the emission intensity of a reference unit that produces useful thermal energy, set to 250 tonnes of CO2 emissions per GWh.
23 (1) The quantity of CO2 from a unit that is captured during a calendar year and stored in a storage project is determined by the formula
is the value determined for Eu in subsection 12(1) or, if applicable, subsection 27(1);
is the quantity of CO2 that is the portion of Ein that has been captured and subsequently stored, during the calendar year, in a storage project that meets the conditions set out in subsection (2), expressed in tonnes and determined by means of a direct measuring device that measures the flow and concentration of CO2; and
is the quantity of CO2, expressed in tonnes, entering the carbon capture and storage system during the calendar year, determined, in accordance with sections 7.1 to 7.5 of the CEMS Protocol, using a CEMS that is located upstream of the carbon capture and storage system and that measures all CO2 entering the carbon capture and storage system.
(2) For the purposes of determining the value for Eccs in subsections 12(1) and 27(1), a quantity of CO2 may only be claimed if it has been permanently stored in a storage project that meets the following conditions:
(a) the geological site into which the CO2 is injected is
(i) a deep saline aquifer into which the CO2 is injected for the sole purpose of storing it, or
(ii) a depleted oil reservoir into which the CO2 is injected for the purpose of enhanced oil recovery; and
(b) the CO2 stored for the purposes of the project is captured, transported and stored in accordance with the laws of Canada or a province or the laws of the United States or one of its states.
24 (1) The quantity of CO2 emissions from the production of the hydrogen, ammonia or steam used by a unit to generate electricity during a calendar year is determined by the formula
is the kth stream of hydrogen, ammonia or steam, where “k” goes from 1 to n and where n is the number of streams of hydrogen, ammonia or steam that are used by the unit during the calendar year;
is the total annual CO2 emissions, expressed in tonnes, from the total annual production of the kth stream of hydrogen, ammonia or steam used by the unit during the calendar year;
is the total annual production of the kth stream of hydrogen, ammonia or steam during the calendar year, determined using a continuous measuring device and expressed
in m3 at standard conditions, in the case of hydrogen and ammonia, and
in GJ, in the case of steam; and
is the quantity of hydrogen or ammonia, expressed in m3 at standard conditions, or the quantity of purchased or transferred steam, expressed in GJ, in the kth stream used by the unit to generate electricity during the calendar year, determined using a continuous measuring device.
(2) Subject to subsection (4), the responsible person must obtain the values of Ek and Pk from the supplier of the hydrogen, ammonia or steam, if any, used by the unit, determined in accordance with
(a) section 10 of the GHGRP, in the case of hydrogen production;
(b) section 8 of the GHGRP, in the case of ammonia production; and
(c) section 7 of the GHGRP, in the case of steam production.
(3) For the purposes of paragraph (2)(a), the description of RCO2 in Equation 10-2 of the GHGRP is to be read as “CO2 captured and permanently stored in a storage project that meets the conditions set out in subsection 23(2) of the Clean Electricity Regulations”.
(4) If the hydrogen or ammonia used by a unit is not produced at the facility at which the unit is located or the steam used by a unit is purchased or transferred to that facility and the responsible person for the unit is not able to obtain from the supplier the information required under subsection (2), the responsible person must replace the ratio Ek ÷ Pk in subsection (1) with the following values:
(a) 9.8312 × 10-4 tonnes of CO2/m3, in the case of hydrogen;
(b) 1.4635 × 10-3 tonnes of CO2/m3, in the case of ammonia; and
(c) 0.08 tonnes of CO2/GJ, in the case of steam.
25 (1) The responsible person for a unit may, for the purposes of subsection 12(1), deduct the quantity of CO2 emissions attributed to the unit during a deduction period and may, for the purposes of subsection 13(2), deduct the quantity of electricity generated by the unit during a deduction period if the following conditions are met:
(a) the electricity system operator has determined that there is an irresistible emergency event, whether natural or arising from human action, or the Minister has determined that there is a risk to human health and safety;
(b) in the case of an irresistible emergency event, the event is outside the control of the electricity system operator and the responsible person;
(c) the electricity system operator has determined that the event or risk referred to in paragraph (a) has triggered a disruption or significant risk of disruption to the electricity supply in the province in which the unit is located or in a contiguous province or state;
(d) the electricity system operator directs the unit to generate electricity due to the event or risk referred to in paragraph (a) in order to alleviate or materially help alleviate a disruption or significant risk of disruption to the electricity supply in the province in which the unit is located or in a contiguous province or state;
(e) the generation of electricity by the unit will alleviate or materially help alleviate a disruption or significant risk of disruption to the electricity supply in the province in which the unit is located or in a contiguous province or state; and
(f) within seven days after the day on which the direction to generate electricity referred to in paragraph (d) is received, the responsible person notifies the Minister of that direction.
(2) The period for which the quantities of CO2 emissions and electricity generated may be deducted begins in the hour in which a unit operates in response to the direction to generate electricity referred to in paragraph (1)(d) and ends as follows:
(a) if an application for an extension of the deduction period is not submitted to the Minister in accordance with subsection 26(1), the period ends on the earlier of
(i) the day that is the 30th day after the day on which the direction to generate electricity was given, and
(ii) the hour that is 24 hours after the electricity system operator notifies the responsible person for the unit that the direction to generate electricity no longer applies; or
(b) if an application for an extension of the deduction period is submitted to the Minister in accordance with subsection 26(1), the period ends
(i) in the case of an application that is not granted, on the earlier of
(A) the hour that is 24 hours after the electricity system operator notifies the responsible person for the unit that the direction to generate electricity no longer applies, and
(B) the day that is the 45th day after the day on which the direction to generate electricity was given, and
(ii) in any other case, on the earlier of
(A) the hour that is 24 hours after the electricity system operator notifies the responsible person for the unit that the direction to generate electricity no longer applies, and
(B) the hour that is 24 hours after the Minister notifies the responsible person for the unit that the deduction period has ended.
(3) The responsible person must, within seven days after the day on which the electricity system operator notifies the responsible person that the direction to generate electricity referred to in paragraph (1)(d) no longer applies, notify the Minister that the direction no longer applies.
26 (1) If the conditions set out in subsection 25(1) will continue to be met for more than 30 days after the day on which the unit receives the direction to generate electricity referred to in paragraph 25(1)(d), the responsible person may, within 30 days after the day on which the direction is received, apply to the Minister for an extension of the deduction period.
(2) The application must include
(a) the registration number assigned to the unit by the Minister under subsection 7(3), if any;
(b) the date on which and hour at which the deduction period began;
(c) a description of the irresistible emergency event or risk to human health and safety that caused the electricity system operator to direct the unit to generate electricity, including
(i) the date on which and hour at which the event or risk began and, if applicable, the date on which and hour at which it ended,
(ii) the province or state in which the event or risk occurred,
(iii) the province or state in which the disruption or significant risk of disruption to the electricity supply occurred, and
(iv) information demonstrating that the unit received the direction to generate electricity to alleviate or materially help alleviate a disruption or significant risk of disruption to the electricity supply; and
(d) if the direction to generate electricity is due to the electricity system operator determining that there is an irresistible emergency event, information, along with supporting documents, demonstrating that
(i) the electricity system operator determined that an irresistible emergency event occurred,
(ii) the event was outside the control of the electricity system operator and the responsible person for the unit,
(iii) the irresistible emergency event caused the disruption or significant risk of disruption to the electricity supply that the direction to generate electricity is intended to alleviate or materially help alleviate, and
(iv) the disruption or significant risk of disruption to the electricity supply arising from the event will continue for more than 30 days after the day on which the deduction period began.
(3) If the Minister is satisfied that the conditions set out in subsection 25(1) will continue to be met, the Minister must, within 10 days after the day on which the application is received, grant an extension of the deduction period.
(4) Before granting an extension of a deduction period based on an irresistible emergency event, the Minister must be satisfied that
(a) the event occurred;
(b) the event is outside the control of the electricity system operator and the responsible person for the unit;
(c) the disruption or significant risk of disruption to the electricity supply arising from the event will continue; and
(d) the generation of electricity by the unit will alleviate or materially help alleviate the disruption or significant risk of disruption to the electricity supply in the province in which the unit is located or in a contiguous province or state.
27 (1) The quantity referred to in the description of Eec in subsection 12(1) is determined by the formula
is the ith deduction period, where “i” goes from 1 to n and where n is the number of deduction periods in the calendar year;
is the quantity of CO2 emissions, expressed in tonnes, from the combustion of fossil fuel in the unit during the ith deduction period during the calendar year, determined in accordance with subsection 12(3);
is the quantity of CO2 emissions, expressed in tonnes, attributed to the production of useful thermal energy by the unit during the ith deduction period during the calendar year, determined in accordance with section 21;
is the quantity of CO2 emissions, expressed in tonnes, attributed to electricity generated by the unit, during the ith deduction period during the calendar year, that is used internally at the facility where the unit is located and is
equal to zero, in the case of
any deduction period in which the unit did not produce useful thermal energy,
any unit, other than a planned unit, that has a commissioning date after December 31, 2024, and
every deduction period after 2049, and
determined in accordance with section 22 in any other case;
is the quantity of CO2, expressed in tonnes, captured from the unit during the ith deduction period during the calendar year and stored in a storage project, determined in accord
The text continues in the official source.
