Analyze this law with AI1 The following definitions apply in these Regulations.
accidental event means an unexpected or unplanned event or circumstance or series of unexpected or unplanned events or circumstances that may lead to the loss of life or damage to the environment, including pollution. (événement accidentel)
accommodations area means the area of an installation or vessel that contains the sleeping quarters, dining areas, food preparation areas, general recreation areas, offices and medical rooms and includes all washrooms in that area. (aire d’habitation)
accommodations installation means an installation that is used to accommodate persons at a production site, drill site or dive site and that functions independently of a production installation, drilling installation or diving installation. (installation d’habitation)
Act means the Canada–Newfoundland and Labrador Atlantic Accord Implementation Act. (Loi)
authorization means an authorization issued by the Board under paragraph 138(1)(b) of the Act. (autorisation)
authorized inspector means a person who is recognized under the laws of Canada or of a province as qualified to inspect boilers and pressure systems or a representative of a certifying authority who is qualified to carry out that function. (inspecteur autorisé)
barrier element means a physical element that on its own does not prevent the flow of fluids but that in combination with other physical elements forms a well barrier. (élément de barrière)
barrier envelope means an envelope consisting of a set of barrier elements that prevents any unintended flow of fluids from the formation into the well-bore, another formation or the environment. (enveloppe de barrière)
certificate of fitness means a certificate referred to in section 139.2 of the Act. (certificat d’aptitude)
certifying authority means the American Bureau of Shipping, Bureau Veritas, Det norske Veritas or Lloyd’s Register. (autorité)
classification society means a member of the International Association of Classification Societies that has recognized and relevant competence and experience in, and established rules and procedures for, the classification of fixed and floating structures, including vessels, that are used in oil or gas activities in locations with physical and environmental conditions similar to those of the offshore area. (société de classification)
commingled production means the production of petroleum from more than one pool or zone through a common well where the production from each pool or zone is not measured separately. (production mélangée)
completion interval means a section within a well that is prepared to permit
(a) the production of fluids from the well;
(b) the observation of the performance of the reservoir; or
(c) the injection of fluids into the well. (intervalle de complétion)
control centre means a continuously staffed work area in which a control system that is critical to the operation of an installation or a pipeline, to safety or to the prevention of waste and pollution is located. (centre de commande)
control system means any system, station or panel used to monitor the status and control the operation of equipment used for or in support of the drilling for, or the production, processing or transportation of, petroleum or any system, station or panel used to monitor and control the operation of an installation. (système de commande)
decommissioning and abandonment means the carrying out of the following processes in accordance with any applicable Act of Parliament, any applicable regulation made under an Act of Parliament, the applicable authorization and any approved development plans:
(a) the cessation of operations;
(b) the controlled abandonment of all wells;
(c) the retirement from service and abandonment or removal of all installations, including their systems and equipment; and
(d) the retirement from service and abandonment or removal of all pipelines and materials. (désaffectation et abandon)
delineation well has the same meaning as in subsection 119(1) of the Act. (puits de délimitation)
development well has the same meaning as in subsection 119(1) of the Act. (puits d’exploitation)
diving installation means an installation or vessel on which a diving system is installed. (installation de plongée)
diving project means any work or activity that is related to the exploration or drilling for, or the production, conservation, processing or transportation of, petroleum and that involves diving. (projet de plongée)
diving system means the equipment that is required to execute a dive, including that required for compression, decompression, rescue and recovery. (système de plongée)
drilling installation means a drilling unit or a drilling rig, and the stable foundation on which it is installed — including an artificial island, an ice platform, a floating platform, a platform fixed to the seabed and any other foundation specifically used for drilling — and any associated accommodations area. (installation de forage)
drilling program means a program for the drilling of one or more wells within a specified time and within specified areas through the use of one or more drilling installations and includes any work or activity related to the program. (programme de forage)
drilling rig means the equipment used to conduct well operations and associated systems, including power systems, control systems and monitoring systems. (appareil de forage)
drilling riser means the connection between a subsea blowout preventer and a mobile offshore platform. (tube prolongateur de forage)
drilling unit means a fixed or mobile offshore platform, or a vessel used in any well operation, that is fitted with a drilling rig, including all systems and equipment installed on the platform or vessel that are related to well operations and marine activities. (unité de forage)
drill site means a location where a drilling rig is or is proposed to be installed. (emplacement de forage)
environmental load means a load imposed by meteorological or oceanographic conditions, such as winds, waves, tides, currents or snow, ice conditions, regional ice features, such as sea ice or icebergs, a seismic event or any other naturally occurring phenomenon. (charge environnementale)
environmental program means a program pertaining to an environmental study as defined in subsection 119(1) of the Act. (programme environnemental)
exploratory well has the same meaning as in subsection 119(1) of the Act. (puits d’exploration)
floating platform means a column-stabilized mobile offshore platform, a surface mobile offshore platform or a fixed floating offshore platform, including a tension leg platform or a spar platform. (plate-forme flottante)
flow allocation procedure means the procedure
(a) to allocate total measured quantities of petroleum and water produced from or injected into a pool or zone back to individual wells in a pool or zone where individual well production or injection is not measured separately; and
(b) to allocate production among fields whose petroleum is combined for the purpose of storage or processing. (méthode de répartition du débit)
flow calculation procedure means the procedure to convert raw meter output to a measured quantity of petroleum or water. (méthode de calcul du débit)
flowline means any line, other than a pipeline, that is used to transport fluids between a well and equipment used for the production of petroleum that is located at a production site or to transport fluids between a well and any systems or equipment that are used in support of that production and between those systems or equipment and the production equipment. (conduite d’écoulement)
flow system means the flow meters, auxiliary equipment attached to the flow meters, fluid sampling devices, production test equipment, master meter and meter prover used to measure and record the rate and volumes at which fluids are
(a) produced from or injected into a pool;
(b) used as a fuel;
(c) used for artificial lift; or
(d) flared, vented or transferred from a production installation. (système d’écoulement)
formation flow test means an operation
(a) to induce the flow of formation fluids to procure reservoir fluid samples and determine reservoir flow characteristics; or
(b) to inject fluids into a formation to evaluate injectivity. (essai d’écoulement de formation)
functional load means any construction load or operating load other than an environmental load or accidental load. (charge fonctionnelle)
geoscientific program means any program that involves geological work or geophysical work, as those terms are defined in subsection 119(1) of the Act. (programme géoscientifique)
geotechnical program means any program that involves geotechnical work, as defined in subsection 119(1) of the Act, that is undertaken to assess whether the seabed or shallow subsurface, as the case may be, is suitable to support installations or any other structures. (programme géotechnique)
installation means, except in Part 5, a drilling installation, production installation or accommodations installation. (installation)
life-saving appliances includes lifebuoys, survival craft, launching and embarkation appliances, marine evacuation systems and visual signals. (engins de sauvetage)
load includes a functional load, environmental load, accidental load and abnormal load. (charge)
LSA Code means the annex to International Maritime Organization Resolution MSC.48(66), International Life-Saving Appliance (LSA) Code. (recueil LSA)
major accidental event means an unexpected or unplanned event or circumstance or series of unexpected or unplanned events or circumstances that may lead to the loss of more than one life or uncontrolled pollution. (événement accidentel majeur)
marine activities means activities related to the stability, station-keeping and collision avoidance of floating platforms and includes mooring, dynamic positioning and ballasting. (activités maritimes)
mobile offshore platform means a platform that is designed to operate in a floating or buoyant mode or that can be moved from place to place without major dismantling or modification, whether or not it has its own motive power. (plate-forme mobile extracôtière)
operations site means a site where an authorized work or activity is carried out. (emplacement des opérations)
operator means a person that holds an operating licence issued by the Board under paragraph 138(1)(a) of the Act and applies for or has been granted an authorization. (exploitant)
physical and environmental conditions means the physical, geotechnical, seismic, oceanographic, meteorological or ice conditions that might affect an authorized work or activity. (conditions physiques et environnementales)
pipeline has the same meaning as in CSA Group standard Z662, Oil and gas pipeline systems, as it relates to offshore pipelines. (pipeline)
pollution means the introduction into the environment of any substance or form of energy outside the limits applicable to an authorized work or activity. (pollution)
pressure system means piping, pressure vessels, safety components and pressure components, including elements attached to pressurized parts, such as flanges, nozzles, couplings, supports, lifting lugs, safety valves and gauges. (système sous pression)
production installation means
(a) the systems and equipment used for or in support of the production of petroleum, including those that are used for separation, treatment and processing;
(b) the systems and equipment used to conduct well operations;
(c) any systems and equipment related to marine activities;
(d) any associated aircraft landing areas, storage areas or tanks and accommodations areas; and
(e) any associated platforms, artificial islands, subsea production systems and offshore loading systems. (ouvrage de production)
production project means a project for the purpose of developing a production site on, or producing petroleum from, a pool or field, including any work or activity related to the project. (projet de production)
production riser means the connection between subsea production equipment and a production platform. (tube prolongateur de production)
production site means a site where a production installation is or is proposed to be installed. (emplacement de production)
recovery of petroleum means the recovery of petroleum under foreseeable economic and operational conditions. (récupération des hydrocarbures)
relief well means a well that is drilled to assist in controlling a blowout in an existing well. (puits de secours)
reportable incident means an event that resulted in any of the following occurrences or in which an occurrence referred to in any of paragraphs (a) to (f) was narrowly avoided:
(a) loss of life;
(b) fire or explosion;
(c) collision;
(d) pollution;
(e) leak of a hazardous substance;
(f) loss of well control;
(g) impairment of a support craft or of any of the structural elements of an installation — or any system or equipment — that is critical to safety;
(h) impairment of any of the structural elements of an installation — or any system or equipment — critical to environmental protection;
(i) implementation of emergency response procedures. (incident à signaler)
safety-critical element means any system or equipment, including software and temporary or portable equipment, that is critical to the safety or integrity of an installation or to preventing the installation from polluting, including
(a) any system or equipment
(i) that is intended to prevent or limit the effects of a hazard that could cause a major accidental event, or
(ii) whose failure could
(A) cause a hazard that could cause a major accidental event, or
(B) worsen the effects on the installation of a major accidental event; and
(b) any software or temporary or portable equipment that affects any system or equipment referred to in paragraph (a). (élément essentiel à la sécurité)
subsea production system means equipment and structures that are located on or below the seabed for the production of petroleum from, or for the injection of fluids into, a field under a production site and includes production risers, flowlines and associated control systems that are located upstream of the isolation valve. (système de production sous-marin)
support craft means a vessel, vehicle, aircraft or other craft used to provide transportation or assistance to persons at an operations site. (véhicule de service)
waste material means any garbage, refuse, sewage or waste fluids or any other useless material that is generated during the carrying out of any work or activity, including used or surplus drill cuttings and drilling fluid as well as produced water. (déchets)
watertight means designed and constructed to withstand a static head of water without any leakage. (étanche)
well control means the control of the movement of fluids into or from a well. (maîtrise du puits)
well operation means an operation related to the drilling, completion, recompletion, re-entry, intervention, workover, suspension or abandonment of a well. (travaux relatifs au puits)
workover means an operation on a completed well that requires removal of the tree or the tubing. (reconditionnement)
zone means any stratum or any sequence of strata, including a zone that has been designated as such by the Board under paragraph 60(a). (couche)
2 (1) In these Regulations, any incorporation by reference of a document is an incorporation of that document as amended from time to time.
(2) Despite subsection (1), if a document that is incorporated by reference is available in both official languages, any amendment to it is incorporated only when the amended version is available in both official languages.
3 (1) An operator must ensure that any person to whom a duty is assigned or who carries out a work or activity under these Regulations has the necessary experience, training, qualifications and competence to carry out that duty, work or activity safely, in a manner that protects the environment and in compliance with these Regulations.
(2) The operator must ensure that the persons referred to in subsection (1) are sufficient in number and receive the necessary supervision to ensure safety and the protection of the environment.
4 (1) An operator must, for the purposes of reducing safety and environmental risks, preventing pollution and ensuring the conservation of petroleum resources, develop a management system that meets the following requirements:
(a) it must be set out in writing;
(b) it must apply to all of the works and activities referred to in the operator’s application for authorization;
(c) it must correspond to the scope, nature and complexity of the works and activities and the associated hazards and risks;
(d) it must be explicit, comprehensive and proactive;
(e) it must foster a culture of safety;
(f) it must establish conditions under which a person who makes a report that relates to safety or protection of the environment will be protected from reprisal;
(g) it must include processes for integrating works and activities and technical systems with the management of human and financial resources;
(h) it must include processes to ensure that all persons have the necessary experience, training, qualifications and competence and receive the necessary supervision to carry out the duties they are assigned;
(i) it must set out the roles, responsibilities and authorities of all persons exercising functions under it, as well as the processes for making those persons aware of their roles, responsibilities and authorities;
(j) it must include processes for coordinating the carrying out and management of the works and activities among the operator, employers, suppliers, service providers and other persons that are subject to it;
(k) it must include processes for the internal and external communication of documents and information relating to safety or the protection of the environment;
(l) it must include a process for the efficient and immediate transmission, at every shift handover, of documents and information relating to any conditions, mechanical or procedural deficiencies or other problems that may have an impact on safety or the protection of the environment;
(m) it must include processes
(i) for identifying hazards that may arise during routine and non-routine operations,
(ii) for assessing the risks associated with those hazards and for reducing those risks through the implementation of control measures, and
(iii) for establishing an inventory of those hazards and control measures and for maintaining that inventory;
(n) it must include processes for investigating and reporting, for the purposes of section 179, the root causes of any reportable incident, the contributing factors and the measures to be implemented to prevent recurrence of the incident;
(o) it must include a process for establishing a system to analyze trends in hazards and reportable incidents;
(p) it must include processes for identifying, evaluating and managing all systems and equipment that are critical to safety or to the protection of the environment;
(q) it must include processes for identifying, evaluating and managing any changes that could affect safety, the protection of the environment and the conservation of petroleum resources;
(r) it must include processes for identifying tasks that are critical to safety, the protection of the environment and the conservation of petroleum resources;
(s) it must include processes for establishing and maintaining measurable goals and performance indicators that are applicable to it;
(t) it must include processes for its periodic internal audit and review to identify areas for improvement and the preventive and corrective measures to be taken if deficiencies are identified;
(u) it must include processes for monitoring compliance and preventing non-compliance with the requirements of these Regulations, the provisions of Part III of the Act and any requirements that are determined by the Board under that Part;
(v) it must include processes for inspection, monitoring, testing and maintenance to ensure the continued integrity of all installations, including their systems and equipment, pipelines and vessels, and for the taking of corrective measures if deficiencies are identified;
(w) it must include the policies and indicate the standards on which it is based;
(x) it must include a process to ensure that all documents associated with it are approved by a person with the necessary authority, periodically reviewed and updated when necessary;
(y) it must include a process for establishing a system to manage any records associated with it, and the records necessary to support operational and regulatory requirements, for the purpose of ensuring that those records are generated, identified, controlled and retained and are readily accessible for consultation and examination; and
(z) it must include processes for controlling and coordinating work, including with respect to the issuance of work permits required under Part 10 and the identification of the works and activities for which a work permit is required.
(2) The operator must ensure that the processes and policies included in the management system and the standards referred to in it are readily accessible for consultation and examination.
(3) The documentation associated with the management system must be organized and set out in a logical fashion to allow for ease of understanding and efficient implementation.
(4) In this section, a reference to a process includes any procedures that are necessary to implement the process.
5 (1) An operator must put in place an organizational structure that includes sufficient human resources to implement and continually improve the management system.
(2) The operator must designate an employee as the accountable person for the management system and must ensure that the accountable person has the necessary authority over the human and financial resources that are required to implement and continually improve the system.
(3) The operator must ensure that the name, position and contact information of the accountable person is submitted to the Board at the time the application for an authorization is made, when a new designation is made under subsection (2) and any time a change is made to the name, position or contact information of the accountable person.
6 (1) An operator must ensure that the management system is implemented before the commencement of any authorized work or activity.
(2) The operator must ensure that all employees, employers, suppliers, service providers and other persons that are subject to the management system comply with the requirements of the management system.
7 The accountable person referred to in subsection 5(2) must ensure that the management system is continually improved.
8 The application for an authorization must be accompanied by the following documents and information:
(a) the scope of the proposed work or activity;
(b) an execution plan and schedule for undertaking the proposed work or activity;
(c) the safety plan referred to in section 9;
(d) the environmental protection plan referred to in section 10;
(e) the contingency plan referred to in section 11;
(f) a description of the installations, including their systems and equipment, pipelines, vessels and support craft, that are to be used for carrying out the work or activity, including the layouts of the installations;
(g) in the case of a production project, a description of the field data acquisition program referred to in section 13;
(h) in the case of a drilling program or a production project,
(i) information on
(A) any proposed flaring or venting of gas, including the rationale for flaring or venting and the estimated rate, quantity and period of the flaring or venting, and
(B) any proposed burning of oil, including the rationale for burning and the estimated quantity of oil to be burned, and
(ii) the decommissioning and abandonment plan referred to in section 15;
(i) in the case of a geoscientific program, geotechnical program or environmental program,
(i) a map illustrating the location of the program works and activities and their proximity to any man-made structures or vulnerable natural structures, as well as any territorial or other boundaries,
(ii) a description of the methods to be used in carrying out the program works and activities and a description of any aircraft or vessel to be used, and
(iii) a description of the proposed data acquisition plan;
(j) in the case of a diving project, the dive project plan required under section 171 of the Canada–Newfoundland and Labrador Offshore Area Occupational Health and Safety Regulations; and
(k) if applicable, the list required under paragraph 151(a), the records made in the course of conducting the risk assessment required under paragraph 151(b) and the action plan required under paragraph 151(c).
9 (1) An operator must develop a safety plan that sets out the procedures, practices, resources, sequence of key safety-related activities and monitoring measures that are necessary to safely carry out a proposed work or activity, as well as the target levels of safety in respect of the work or activity and measures for hazard management.
(2) The safety plan must include the following documents and information:
(a) specific references to and detailed descriptions of the provisions of the management system that relate to safety, sufficient to demonstrate how the obligations set out in these Regulations with regard to safety will be fulfilled;
(b) a document that includes
(i) a summary of the studies that have been carried out, and a description of the processes that will be followed, for the purposes of
(A) identifying hazards related to the proposed work or activity that may occur during routine and non-routine operations, including any hazards posed by any other activities taking place near the proposed work or activity, and
(B) assessing safety risks associated with the identified hazards,
(ii) a description of the identified hazards referred to in clause (i)(A) and the results of the assessments referred to in clause (i)(B),
(iii) a summary of the measures to be implemented to anticipate safety risks related to the identified hazards,
(iv) a summary and evaluation of the measures to be implemented to reduce the safety risks associated with the identified hazards, including, if the possibility of ice hazards exists, measures for ice detection, forecasting, surveillance and reporting, including data collection, and any measures for ice avoidance or deflection,
(v) a detailed description of the measures to be implemented to reduce safety risks to a level that is as low as reasonably practicable in respect of
(A) the design of all installations, including their systems and equipment,
(B) the design, winterization and operation of any installation that is to be operated in a cold climate,
(C) the design, arrangement, installation and maintenance of barriers to provide fire and blast protection,
(D) the design of all control systems,
(E) the design, selection, location, installation, commissioning, protection, operation, inspection and maintenance of mechanical equipment,
(F) the design, construction, installation, commissioning, operation, inspection, monitoring, testing and maintenance of any subsea production system under all foreseeable physical and environmental conditions and operating conditions for all modes of operation,
(G) the management of temporary or portable equipment, and
(H) the arrangement and specification of watertight and weathertight appliances,
(vi) a detailed description of the measures to be implemented in respect of
(A) the design and location of any vent that is used to release gas into the atmosphere without combustion in order to minimize the risk of accidental ignition of the gas,
(B) the design, selection, operation, inspection, testing and maintenance of fire protection systems and equipment in order to minimize the risk of hazards to persons who use those systems and equipment,
(C) the design of boilers and pressure systems in order to minimize the risk of hazards to the installation and to persons present on it and to any other installations, vessel or persons in proximity to it, and
(D) the design and maintenance of any disconnectable mooring system on a floating platform to ensure that the risk that the system will fail to safely disconnect if exposed to situations that would exceed the platform’s structural limits or the system’s design limits is reduced to a level that is as low as reasonably practicable, without compromising the ability to achieve the target levels of safety set out in the safety plan and environmental protection plan, and
(vii) a summary of the measures to be implemented for communicating the identified hazards and for mitigating the safety risks associated with those hazards to all persons who are directly affected;
(c) a description of all installations or vessels that are to be used during the proposed work or activity, a description of their systems and equipment that are critical to safety and a brief description of the systems in place for the inspection, testing and maintenance of those systems and that equipment;
(d) a description of the organizational structure and chain of command for the proposed work or activity that
(i) explains the relationship between the organizational structure and chain of command, and
(ii) includes the name, position and contact information of the employee who is responsible for the management of the safety plan; and
(e) a description of the measures to be implemented to monitor compliance with the plan and to evaluate performance in relation to its objectives.
10 (1) An operator must develop an environmental protection plan that sets out the procedures, practices, resources and monitoring measures that are necessary to protect the environment from the effects of a proposed work or activity, the target levels of safety in respect of the work or activity and measures for hazard management.
(2) The environmental protection plan must include the following documents and information:
(a) specific references to and detailed descriptions of the provisions of the management system that relate to the protection of the environment, sufficient to demonstrate how the obligations set out in these Regulations with regard to environmental protection will be fulfilled;
(b) a document that includes
(i) a summary of the studies that have been carried out, and a description of the processes that will be followed, for the purposes of
(A) identifying hazards related to the proposed work or activity that may occur during routine and non-routine operations, including any hazards posed by any other activities taking place near the proposed work or activity, and
(B) assessing environmental risks associated with the identified hazards,
(ii) a description of the identified hazards referred to in clause (i)(A) and the results of the assessments referred to in clause (i)(B),
(iii) a summary of the measures to be implemented to anticipate environmental risks related to the identified hazards,
(iv) a summary and evaluation of the measures to be implemented to reduce the environmental risks associated with the identified hazards, and
(v) a detailed description of the measures to be implemented to reduce environmental risks to a level that is as low as reasonably practicable in respect of
(A) the design of all installations, including their systems and equipment,
(B) the design, winterization and operation of any installation that is to be operated in a cold climate,
(C) the design, arrangement, installation and maintenance of barriers to provide fire and blast protection,
(D) the design of all control systems,
(E) the design, selection, location, installation, commissioning, protection, operation, inspection and maintenance of mechanical equipment,
(F) the design, construction, installation, commissioning, operation, inspection, monitoring, testing and maintenance of any subsea production system under all foreseeable physical and environmental conditions and operating conditions for all modes of operation, and
(G) the management of temporary or portable equipment, and
(vi) a detailed description of the measures to be implemented in respect of the design and location of any vent that is used to release gas into the atmosphere without combustion in order to minimize the risk of accidental ignition of the gas, and
(vii) a summary of the measures to be implemented for communicating the identified hazards and for mitigating the environmental risks associated with those hazards to all persons who are directly affected;
(c) a description of all installations or vessels that are to be used during the proposed work or activity, a description of their systems and equipment that are critical to the protection of the environment and a brief description of the systems in place for the inspection, testing and maintenance of those systems and that equipment;
(d) in the case of a drilling program or a production project, the procedures for the selection, evaluation and use of chemical substances, including process chemicals and drilling fluid ingredients;
(e) a description of the equipment and procedures for the treatment, handling and disposal of waste material;
(f) a description of all of the discharge streams and the limits of any discharge into the environment, including any discharge of waste material;
(g) a description of the system for monitoring compliance with the discharge limits referred to in paragraph (f), including the sampling and analytical programs for determining whether discharges are within the specified limits;
(h) a description of the organizational structure and chain of command for the proposed work or activity that
(i) explains the relationship between the organizational structure and chain of command, and
(ii) includes the name, position and contact information of the employee who is responsible for the management of the environmental protection plan;
(i) a description of the measures to be implemented to monitor compliance with the plan and to evaluate performance in relation to its objectives; and
(j) a description of the procedure to be followed if an archaeological site or a burial ground is discovered during the proposed work or activity.
11 (1) An operator must develop a contingency plan that sets out the procedures, including emergency response procedures, and the practices, resources and monitoring measures that are necessary to effectively prepare for and mitigate the effects of any accidental event.
(2) The contingency plan must include the following documents and information:
(a) a description of the method to be used for classifying accidental events and a description of the emergency response procedures for each event;
(b) a description of the procedures for the internal and external reporting of accidental events;
(c) a description of the procedures for accessing safety-related and environmental information that is necessary to mitigate the effects of any accidental event;
(d) a description of the organizational structure, chain of command and resources for managing any accidental event, including
(i) a list of key emergency response positions and a description of the roles, responsibilities and authorities associated with each of those positions, including a description of related tasks and checklists of actions that must be taken in the context of the contingency plan,
(ii) a description of the available support craft and the contact information for its crew or a reference to the number or title of a document that provides that description and contact information,
(iii) a description, or a reference to the number or title of a document that provides the description, of available emergency response equipment, including life-saving appliances, and the equipment’s location, as well as the limits on its use and the mitigation measures to be taken in the event that it is not available,
(iv) a description, or a reference to a number or title of a document that provides the description, of all available medical equipment and the equipment’s location,
(v) a description of the communication system referred to in section 129 and the operating procedures for that system,
(vi) a description of all emergency response operations centres and their locations,
(vii) a description of any good or service that must be obtained on a contractual basis for each response measure, and
(viii) a description of the location and the contents of any temporary safe refuges or a reference to the number or title of a document that provides that description;
(e) details of all mutual aid agreements entered into with other operators;
(f) a description of the procedures for coordinating and liaising with all relevant emergency response organizations;
(g) a description of the communication protocols with all relevant federal, provincial, territorial and municipal agencies and Indigenous governing bodies;
(h) a copy of all personnel evacuation plans, including any evacuation plan for divers engaged in a dive; and
(i) an indication of the frequency with which emergency response drills and exercises are to be completed and their scope.
(3) In the case of a drilling program or a production project, the contingency plan must also include a description of the source control and containment measures to be taken to stop uncontrolled flow from a well and to minimize the duration and environmental effects of any resulting spill, as well as the following documents and information:
(a) a description of the source control and containment equipment to be used in the event of a loss of well control;
(b) details of the contractual arrangements for the source control and containment equipment, other than a relief well drilling installation, including
(i) the name and contact information of the owner or owners of the equipment,
(ii) the arrangements for transport of the equipment to the location of the uncontrolled well, and
(iii) the arrangements for the mode of deployment of the equipment at the location of the uncontrolled well;
(c) the schedule and plan for the mobilization, deployment and operation of the source control and containment equipment, including measures to minimize deployment time that take required regulatory approvals into account;
(d) details regarding the accessibility of the source control and containment equipment and the documents and information referred to in paragraphs (a) to (c);
(e) an explanation of the adequacy of each of the source control and containment measures; and
(f) a description of any support systems and equipment that are available, including vessels and remotely operated vehicles and any consumables that may be used, such as, in the case of a relief well, a spare wellhead, spare casing and spare bulk additives.
(4) If a spill-treating agent is being considered for use as a spill response measure, the contingency plan must include the following additional documents and information:
(a) the name of the chosen spill-treating agent and details of an assessment of its efficacy in treating the potential sources of pollutants, including the results of any tests conducted for the assessment and a description of those tests;
(b) the results of an analysis that demonstrates that a net environmental benefit is likely to be achieved through the use of the spill-treating agent under certain circumstances;
(c) a description of the circumstances under which the spill-treating agent will be used and the estimated period within which its use will be effective;
(d) a description of the methods and protocols, including the amount and application rate, for safe, effective and efficient use of the spill-treating agent;
(e) a list of the personnel roles, equipment and materials that an operator will have available for the purpose of using the spill-treating agent, including any to be provided through contractual arrangements, and a description of the requirements that must be met for those contracts to be activated; and
(f) a monitoring plan for the use of the spill-treating agent.
(5) The assessment of efficacy under paragraph (4)(a) must be carried out using oil obtained directly from the operations site where the spill-treating agent is being considered for use or, if oil is not available from that operations site, it must be carried out using an oil that most closely resembles the oil that is expected to be obtained from the operations site and must be repeated when oil becomes available from that operations site.
(6) The assessment, analysis, methods and protocols referred to in paragraphs (4)(a), (b) and (d) must be based, taking the local environment into account, on an international standard or an alternative recognized by the Board and the contingency plan must identify each of those standards or alternatives.
(7) The methods and protocols referred to in paragraph (4)(d) and the monitoring plan referred to in paragraph (4)(f) must conform to industry standards and best practices for spill-treating agent use, taking the local environment into account.
(8) In this section, source control and containment equipment means the capping stack, containment dome, any subsea and surface equipment, devices or vessels and any relief well drilling installations that are used to contain and control a spill source and to minimize the duration of a spill and its environmental effects until well control is regained.
12 In determining for the purpose of section 138.21 of the Act whether the use of a spill-treating agent is likely to achieve a net environmental benefit, the Board must take into account
(a) the assessment of the spill-treating agent’s efficacy referred to in paragraph 11(4)(a);
(b) the results of the analysis referred to in paragraph 11(4)(b);
(c) the circumstances referred to in paragraph 11(4)(c);
(d) the methods and protocols referred to in paragraph 11(4)(d); and
(e) the monitoring plan referred to in paragraph 11(4)(f).
13 In the case of a production project, an operator must develop a field data acquisition program that
(a) provides for the collection of sufficient pool pressure measurements, drill cutting and fluid samples, cores and well logs, and the carrying out of sufficient formation flow tests, analyses and surveys, to enable a comprehensive assessment of the field, of the performance of development wells, of the pool depletion scheme and of any injection scheme; and
(b) identifies the quantity of samples and cores, the evaluation data and any associated analyses, surveys and reports that are to be provided to the Board.
14 (1) If the application for an authorization is in respect of a production project, the operator must submit to the Board for its approval the flow system, the flow calculation procedure and the flow allocation procedure that will be used to conduct the measurements referred to in sections 74 to 78, as well as any alternate measurements referred to in subsection 74(2) that the operator proposes to conduct.
(2) The Board must approve the flow system, the flow calculation procedure and the flow allocation procedure if the applicant demonstrates that the system and procedures facilitate accurate measurements and the allocation, on a pool or zone basis, of the production from and injection into individual wells.
15 (1) An operator must, in the case of a drilling program or production project, develop a decommissioning and abandonment plan that includes the following information:
(a) a description of the safety and environmental protection measures to be implemented during the decommissioning and abandonment to comply with the requirements of these Regulations, the provisions of Part III of the Act and any federal or provincial legislation or international conventions or agreements relating to safety and the protection of the environment;
(b) a description of the potential effects of the decommissioning and abandonment on the environment and on any future uses of the site where the program or project is carried out;
(c) the methods for restoring the site after the decommissioning and abandonment; and
(d) the forecasted costs of the decommissioning and abandonment and the manner in which the operator will finance or pay for those costs.
(2) The operator must submit to the Board an update on the forecasted costs of decommissioning and abandonment and the manner in which the operator will finance or pay for those costs
(a) whenever there is a significant change to that information, and
(b) beginning no less than five years before the day on which the decommissioning and abandonment is forecasted to begin, at least once a year.
16 The following definitions apply for the purposes of paragraph 138(4)(c) of the Act.
production facility means the systems and equipment referred to in paragraph (a) of the definition production installation, other than a diving system, as well as any associated aircraft landing areas, storage areas or tanks and accommodations areas. (installation de production)
production platform means a production installation. (plate-forme de production)
17 (1) Subject to subsection (2), an operator that intends to conduct a well operation must obtain a well approval.
(2) A well approval is not necessary to conduct a wire line operation, slick line operation, coiled tubing operation or other similar operation through a tree located above sea level if
(a) the operation does not alter the completion interval or is not expected to adversely affect the recovery of petroleum; and
(b) the equipment, operating procedures and qualifications of the persons carrying out the work are in compliance with the requirements of the authorization.
(3) The following definitions apply in subsection (2).
slick line means a single steel cable that is used to run tools in a well. (câble lisse)
wire line means a line that contains a conductor wire and that is used to run survey instruments or other tools in a well. (câble)
(4) The application for a well approval must include the estimated cost breakdown of the well operation and the following information:
(a) if the well approval is being sought to drill a well,
(i) a comprehensive description of the drilling program, a geoscientific description of the reservoir targets and a description of any geohazard,
(ii) the digital data necessary to allow for an independent geohazard assessment,
(iii) a description of the well data acquisition program referred to in section 18, and
(iv) a description of the well verification scheme referred to in section 19;
(b) if the well approval is being sought to perform a workover on, to re-enter, to complete or to recomplete a well or to suspend or abandon a well or a part of one, a description of the well or part, a description of the proposed work or activity and the rationale for carrying it out and barrier envelope diagrams that demonstrate that two barrier envelopes will be in place throughout the operation;
(c) if the well approval is being sought to complete a well, information that demonstrates that section 71 will be complied with;
(d) if the well approval is being sought to suspend a well or a part of one, an indication of the period within which the suspended well or part will be abandoned or completed; and
(e) if the well approval is being sought to suspend or abandon a well or a part of one, the methods for verifying the effectiveness of the isolation of pools and zones that is required under subparagraph 90(1)(b)(i).
(5) The Board must grant the well approval if the operator demonstrates that the well operation will be conducted safely, without waste or pollution and in compliance with these Regulations.
18 In the case of a drilling program, an operator must develop a well data acquisition program that
(a) provides for the collection of sufficient pressure measurements, drill cutting and fluid samples, conventional cores, sidewall cores and well logs, and the carrying out of sufficient formation flow tests, analyses and surveys, to enable a comprehensive geophysical, geological and reservoir evaluation to be made; and
(b) identifies the quantity of samples and cores, the evaluation data and any associated analyses, surveys and reports that are to be provided to the Board.
19 (1) An operator must establish a well verification scheme based on criteria that the operator establishes to ensure that the design of any well is in accordance with industry standards and best practices so that the well’s integrity is maintained throughout its life cycle.
(2) For the purposes of subsection (1), the operator must rank a well according to its level of risk and ensure that the well ranking is confirmed by an independent person.
(3) The verification scheme must set out the verification requirements that are applicable to the design of a well according to the well’s ranking and to any changes made to the design during the well’s construction or operation that would affect any previously undertaken verification.
(4) The operator must ensure that the required verifications are carried out by an independent person that was not involved in the original design.
20 (1) The Board may suspend a well approval if
(a) the operator conducts the well operation other than as described in the application for the well approval;
(b) the physical and environmental conditions encountered in the area of the work or activity for which the well approval was granted are more severe than those on the basis of which the manufacturer of any equipment used in the well operation established the equipment’s operating limits; or
(c) the operator uses a flow system, flow calculation procedure or flow allocation procedure that has not been approved under subsection 14(2), conducts a formation flow test that has not been approved under subsection 63(5) or engages in commingled production that has not been approved under subsection 80(2).
(2) In deciding whether to suspend a well approval, the Board must consider
(a) the effects or potential effects of the applicable situation referred to in subsection (1) on safety, the environment and the conservation of petroleum resources; and
(b) the operator’s history of non-compliance with the requirements of these Regulations, the provisions of Part III of the Act or any requirements that are established by the Board under that Part with respect to well operations.
21 The Board must revoke a well approval if
(a) the operator fails to remedy the situation that caused the suspension of the well approval as soon as the circumstances permit within 60 days after the date of that suspension unless, on written request by the operator, the Board grants the operator an extension of time to remedy the situation; or
(b) the operator continues to operate the well despite the suspension of the well approval.
22 If a well approval is revoked, the operator must ensure that the well is suspended or abandoned in accordance with Part 8.
23 For the purposes of subsection 139(1) of the Act, a well approval relating to a production project is prescribed.
24 (1) The approvals referred to in subsection 139(4) of the Act are subject to the operator’s submission of a concept safety analysis to the Chief Safety Officer at the time the operator submits the application and proposed development plan to the Board under subsection 139(2) of the Act.
(2) The concept safety analysis must
(a) be based on the development concept chosen by the operator as a general approach and described in Part I of the development plan;
(b) take into account all works and activities associated with each phase in the life cycle of the development;
(c) determine target levels of safety that are to be achieved to ensure safety and the protection of the environment for all works and activities within each phase of the life cycle of an installation, including its systems and equipment, from the installation’s design up to and including its decommissioning and abandonment;
(d) identify all hazards having the potential to cause a major accidental event;
(e) include a systematic assessment of the unmitigated risks associated with each of the identified hazards, including the likelihood of a major accidental event occurring and the consequences that would result;
(f) identify the control measures that are to be implemented to reduce the risks associated with the identified hazards to a level that is as low as reasonably practicable;
(g) identify the effects of any additional risks that may result from the implementation of the identified control measures; and
(h) identify all assumptions on which any aspect of the concept safety analysis is based.
(3) The target levels of safety must be based on risk assessments that are
(a) quantitative, if it can be demonstrated that input data are available in the quantity and quality necessary to demonstrate the reliability of the results; or
(b) qualitative, if the criteria in paragraph (a) are not met or if a quantitative assessment would otherwise be inappropriate.
(4) The operator must include in the risk assessment a description of the circumstances that will necessitate an update of the risk assessment, including changes in
(a) the physical and environmental conditions;
(b) the operating conditions and the limits taken into account in the design assumptions; and
(c) the operating procedures.
(5) The operator must update the risk assessment as often as necessary and at least once every five years throughout the life cycle of the development to
(a) account for the circumstances described in subsection (4); and
(b) ensure the ongoing suitability of the control measures to maintain risks at a level as low as reasonably practicable.
25 (1) For the purposes of paragraph 139(3)(b) of the Act, Part II of the development plan must contain a resource management plan.
(2) The resource management plan must include a description and analysis of the following:
(a) the geological setting and features of the field and of each pool or petroleum-bearing reservoir;
(b) the petrophysical data and analytical procedures for each pool;
(c) the reservoir engineering data for each pool;
(d) estimates of in-place resources and recoverable reserves for each pool, fault block and reservoir subdivision;
(e) the proposed reservoir exploitation scheme;
(f) potential developments and the reasons why they are not included in the proposed development of the field or pool;
(g) any past drilling in the area related to the proposed development of the field or pool as well as the proposed drilling program and typical completion designs for the development wells;
(h) the production and export systems related to the proposed development of the field or pool;
(i) the expected overall operating efficiency and reliability of the proposed development of the field or pool; and
(j) past expenditures and predicted capital and operating cost data, with sufficient detail to permit an economic analysis of the proposed development of the field or pool.
(3) The resource management plan must also contain a description of the operator’s organizational structure as it relates to the implementation of the plan.
26 For the purpose of section 139.2 of the Act, a production installation, drilling installation, accommodations installation and diving installation are prescribed installations.
27 In this Part, installation means an installation referred to in section 26.
28 (1) Before a certifying authority issues a certificate of fitness in respect of an installation,
(a) the person that applies for the certificate must
(i) provide the certifying authority with all the information that the certifying authority requires in relation to the application for certification, such as design specifications for the installation, including its systems and equipment,
(ii) conduct or assist the certifying authority in conducting any inspection, test or survey that the certifying authority requires,
(iii) except in the case of a diving installation, submit to the certifying authority for approval a maintenance program that meets the requirements set out in section 159 and a weight control program that meets the requirements set out in section 161, and
(iv) in the case of a diving installation, submit a maintenance program to the certifying authority for approval;
(b) the certifying authority must determine that, in relation to the production site, the drill site or the region in which the particular installation is to be operated,
(i) the installation, including its systems and equipment, is fit for the purposes for which it is to be used and can be operated without posing a threat to persons or the environment,
(ii) in the case of an installation other than a diving installation, the requirements set out in the following provisions have been met:
(A) the provisions of these Regulations listed in Part 1 of Schedule 1, and
(B) the provisions of the Canada–Newfoundland and Labrador Offshore Area Occupational Health and Safety Regulations listed in Part 2 of Schedule 1, other than paragraph 22(5)(b), subsection 28(3), paragraph 28(5)(a), subsection 171(3) and paragraphs 172(1)(a), (g), (j) to (m), (o) and (p), (2)(e) and (3)(c) and (f) of those Regulations,
(iii) in the case of a diving installation, the requirements set out in the following provisions have been met:
(A) section 174 and the provisions of Part 9, and
(B) the provisions of the Canada–Newfoundland and Labrador Offshore Area Occupational Health and Safety Regulations listed in Part 2 of Schedule 1, and
(iv) the installation, including its systems and equipment, will continue to meet the requirements set out in subparagraph (i) and the applicable requirements set out in subparagraph (ii) or (iii), as the case may be, for the time set out in the certificate of fitness if
(A) the installation — other than a diving installation — including its systems and equipment, is inspected, monitored, tested and maintained in accordance with the maintenance program and is maintained in accordance with the weight control program referred to in subparagraph (a)(iii), or
(B) the diving installation, including its systems and equipment, is maintained in accordance with the maintenance program referred to in subparagraph (a)(iv);
(c) the certifying authority must
(i) in the case of an installation other than a diving installation, determine that the maintenance program and the weight control program are adequate to ensure the continued integrity of the installation, including its systems and equipment, and approve them, and
(ii) in the case of a diving installation, determine that the maintenance program is adequate to ensure the continued integrity of the installation, including its systems and equipment, and approve it; and
(d) the certifying authority must carry out the scope of work in respect of which the certificate of fitness is issued.
(2) For the purposes of subparagraphs (1)(b)(ii) and (iii), the certifying authority may substitute, for any equipment, methods, measures, standards or other things required under any regulation referred to in those subparagraphs, any other equipment, methods, measures, standards or other things the use of which is authorized by the Chief Safety Officer or the Chief Conservation Officer, as the case may be, under section 151 of the Act or subsection 205.069(1) of the Act.
(3) The certifying authority must set out in any certificate of fitness that it issues the details of any limitation on the operation of the installation that is necessary to ensure that the installation, including its systems and equipment, meets the requirements set out in paragraph (1)(b).
29 (1) For the purposes of paragraph 139.2(4)(b) of the Act, the extent to which a certifying authority may participate in the design, construction or ins
The text continues in the official source.