LEGALDIGMLEGALDIGM
    ← Canada
    Beta
    SOR-2019-266:en

    SOR-2019-266:en — Output-Based Pricing System Regulations

    Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.

    Analyze this law with AI
    1 (1) Subject to subsection (6), for the purposes of the Act and these Regulations, facility means (a) all of the following elements that are operated in an integrated way to carry out a specified industrial activity: (i) a site, or multiple sites, at which the specified industrial activity is carried out and the buildings, equipment and other structures and stationary items located on the site or sites, and (ii) any other sites used in conjunction with the specified industrial activity, including a quarry, tailings pond, wastewater lagoon or pond and landfill; or (b) the portion of a natural gas transmission pipeline system within a province, used to transmit processed natural gas, of which the pipelines and associated installations or equipment — including compressor stations, storage installations and compressors — are operated in an integrated way, but excludes pipelines, installations or equipment that are used in the local distribution of natural gas and that are downstream of a metering station. (2) If more than one person is responsible for the elements referred to in subparagraph (1)(a)(i) or (ii) as an owner or otherwise, including having the charge, management or control of, or as the true decision maker with respect to their operations, those elements are only included in the definition of facility if there is at least one person who is responsible for, owns, has the charge management or control of, or is the true decision maker in common. (3) If more than one person is responsible for the pipelines and associated installations or equipment referred to in paragraph (1)(b) as an owner or otherwise, including having the charge, management or control of, or as the true decision maker with respect to the pipelines and associated installations or equipment, those pipelines and associated installations or equipment are only included in the definition of facility if there is at least one person who is responsible for, owns, has the charge management or control of, or is the true decision maker in common. (4) If two or more facilities referred to in paragraph (b) of the definition facility in subsection (1) within the same province have the same person responsible, or, if they have more than one person responsible, they have at least one person responsible in common, and are operated in an integrated way, they are deemed to be a single facility. (5) Subject to subsection (6), with respect to a facility (a) any part of a public road or of a railway track that is bordered on both sides by the facility and used to carry out the facility’s specified industrial activities is deemed to be part of the facility; (b) for greater certainty, any part of a railway track that is used exclusively to carry out the facility’s specified industrial activities is part of the facility; (c) for greater certainty, buildings that are used for legal, administrative or management purposes and that are not located where a specified industrial activity is carried out are not included for the purposes of the definition facility in subsection (1); and (d) if two or more facilities referred to in paragraph (b) of the definition facility in subsection (1), within the same province, have the same person responsible or a person responsible in common and are not operated in an integrated way, they each constitute a separate facility. (6) In the case of a facility that is not a covered facility, the specified industrial activities referred to in subsections (1) and (5) are those that would be specified industrial activities if the facility was a covered facility. 2 (1) The following definitions apply in these Regulations. Act means the Greenhouse Gas Pollution Pricing Act. (Loi) additional industrial activity means an industrial activity that is not set out in column 1 of Schedule 1, that is recognized by the Minister, including for the purposes of a facility’s designation as a covered facility under subsection 172(1) of the Act, and that is engaged in in a sector that is recognized by the Minister as being at significant risk of competitiveness impacts resulting from carbon pricing and of carbon leakage resulting from carbon pricing. (activité industrielle additionnelle) ANSI National Accreditation Board means the accreditation organization that is a subsidiary of the American National Standards Institute. (ANSI National Accreditation Board) authorized official means (a) in respect of a person responsible for a covered facility who is an individual, that individual or another individual who is authorized to act on their behalf; (b) in respect of a person responsible for a covered facility that is a corporation, an officer of the corporation who is authorized to act on its behalf; and (c) in respect of a person responsible for a covered facility that is another entity, an individual who is authorized to act on its behalf. (agent autorisé) biomass means plants or plant materials, animal waste or any product made of either of these, including wood and wood products, bio-charcoal, agricultural residues, biologically derived organic matter in municipal and industrial wastes, landfill gas, bio-alcohols, pulping liquor, sludge digestion gas and fuel from animal or plant origin. (biomasse) boiler unit has the same meaning as subsection 2(1) of the Regulations Limiting Carbon Dioxide Emissions from Natural Gas-fired Generation of Electricity. (groupe chaudière) combustion engine means an engine, other than an engine that is self-propelled or designed to be propelled while performing its function, that (a) operates according to the Brayton thermodynamic cycle and combusts fossil fuels to produce a net amount of motive power; or (b) combusts fossil fuels and uses reciprocating motion to convert thermal energy into mechanical work. (moteur à combustion) combustion engine unit has the same meaning as subsection 2(1) of the Regulations Limiting Carbon Dioxide Emissions from Natural Gas-fired Generation of Electricity. (groupe moteur à combustion) Directive 017[Repealed, SOR/2023-240, s. 2] Directive PNG017[Repealed, SOR/2023-240, s. 2] distribution system has the same meaning as section 3 of the Act. (réseau de distribution) dolomitic lime means lime derived from limestone that contains equal to or more than 5% magnesium carbonate. (chaux dolomitique) electricity generation facility means a covered facility, other than one whose primary activity is something other than an industrial activity, that generates electricity as its primary industrial activity, used to generate electricity from fossil fuels and composed of one unit or a group of units. (installation de production d’électricité) flaring emissions means controlled emissions of gases from industrial activities as a result of the combustion of a gas or liquid stream produced at a facility, the purpose of which is not to produce useful heat. It does not include emissions from the flaring of landfill gas. (émissions de torchage) gaseous fuel means a fossil fuel that is gaseous at a temperature of 15°C and a pressure of 101.325kPa. (combustible gazeux) GHG means greenhouse gas. (version anglaise seulement) GHGRP[Repealed, SOR/2023-240, s. 2] global warming potential or GWP means the global warming potential set out in column 2 of Schedule 3 to the Act for the greenhouse gas set out in column 1 of that Schedule. (PRP ou potentiel de réchauffement planétaire) grey cement means a mix composed primarily of clinker that contains more than 0.5% by weight of ferric oxide, gypsum and limestone. (ciment gris) HFC means the hydrofluorocarbons set out in items 6 to 24 of Schedule 3 to the Act. (HFC) high-calcium lime means lime derived from limestone that contains less than 5% magnesium carbonate. (chaux forte en calcium) industrial process emissions means emissions from an industrial process that involves a chemical or physical reaction other than combustion and the purpose of which is not to produce useful heat. (émissions liées aux procédés industriels) industrial product use emissions means emissions from the use of a product in an industrial process that does not involve a chemical or physical reaction and does not react in the process, including emissions from the use of sulphur hexafluoride (SF6), HFCs and PFCs as cover gases and the use of HFCs and PFCs in a foam-blowing process. (émissions associées à l’utilisation de produits industriels) IPCC Guidelines[Repealed, SOR/2023-240, s. 2] ISO Standard 14065 means the standard ISO 14065 entitled Greenhouse gases — Requirements for greenhouse gas validation and verification bodies for use in accreditation or other forms of recognition, published by the International Organization for Standardization in 2013. (norme ISO 14065) leakage emissions means uncontrolled emissions. It does not include industrial process emissions and industrial product use emissions. (émissions dues aux fuites) liquid fuel means a fossil fuel that is liquid at a temperature of 15°C and a pressure of 101.325kPa. (combustible liquide) natural gas means a mixture of hydrocarbons — such as methane, ethane or propane — that is in a gaseous state at a temperature of 15°C and a pressure of 101.325 kPa and that is composed of at least 70% methane by volume or that has a higher heating value that is not less than 35 MJ/standard m3 and not more than 41 MJ/standard m3. It excludes landfill gas, digester gas, refinery gas, blast furnace gas, coke oven gas or gas derived through industrial processes from petroleum coke or coal, including synthetic gas. (gaz naturel) on-site transportation emissions means emissions from registered or unregistered vehicles and other machinery that are used at the facility for the transport of substances, materials, equipment or products used in a production process or for the transport of individuals. (émissions liées au transport sur le site) PFC means the perfluorocarbons set out in in items 25 to 33 of Schedule 3 to the Act. (PFC) Quantification Methods means the document entitled Quantification Methods for the Output-Based Pricing System Regulations, published by the Department of the Environment in 2022. (méthodes de quantification) solid fuel means a fossil fuel that is solid at a temperature of 15°C and a pressure of 101.325kPa. (combustible solide) speciality lime means lime produced by passing dolomitic lime through a kiln more than once or by adding material to dolomitic lime to change its properties. (chaux spécialisée) specified emission type means an emission type listed in subsection 5(1). (type d’émissions visé) specified industrial activity means, with respect to a covered facility, an industrial activity referred to in subsection 5(2).  (activité industrielle visée) stationary fuel combustion emissions means emissions from stationary devices that combust solid fuels, liquid fuels, gaseous fuels, or tires or asphalt shingles, whether in whole or in part, for the purpose of producing useful heat. (émissions de combustion stationnaire de combustible) thermal energy means useful thermal energy in the form of steam or hot water that is intended to be used for an industrial purpose. (énergie thermique) thermal energy to electricity ratio means, in respect of a unit or equipment that generates electricity, the ratio of the total quantity of thermal energy produced to the total quantity of gross electricity generated by the unit or equipment, not including the quantities from the use of duct burners, in a calendar year and expressed in the same units of measurement. (rapport énergie thermique-électricité) total capacity means, in respect of a unit or equipment that generates electricity, either (a) the maximum continuous rating (the maximum net power that can be continuously sustained by a unit or equipment that generates electricity without the use of duct burners, at a temperature of 15˚C and a pressure of 101.325 kPa), expressed in MW of electricity, as most recently reported to a provincial authority of competent jurisdiction or to the electric system operator in the province where the unit or equipment is located, or (b) if no report has been made, the most electricity that was generated by the unit or equipment during two continuous hours in a calendar year, expressed in MW of electricity. (capacité totale) 2020 GHGRP[Repealed, SOR/2023-240, s. 2] unit means an assembly comprised of a boiler or combustion engine and any other equipment that is physically connected to either, including duct burners and other combustion devices, heat recovery systems, steam turbines, generators and emission control devices, and that generates electricity and, if applicable, produces thermal energy from the combustion of fossil fuels. (groupe) venting emissions means controlled emissions that occur due to the design of a facility, to procedures used in the manufacture or processing of a substance or product or to pressure exceeding the capacity of the equipment at the facility. (émissions d’évacuation) waste emissions means emissions that result from waste disposal at a facility, including the landfilling of solid waste, the biological treatment or incineration of waste and the flaring of landfill gas. Waste emissions do not include emissions from the combustion of tires or asphalt shingles, whether in whole or in part, to produce useful heat or on-site transportation emissions. (émissions des déchets) wastewater emissions means emissions resulting from industrial wastewater and industrial wastewater treatment at a facility. (émissions des eaux usées) WCI Method[Repealed, SOR/2023-240, s. 2] white cement means a mix composed primarily of clinker that contains 0.5% or less by weight of ferric oxide, gypsum and limestone. (ciment blanc) (2) Unless otherwise indicated, a reference to any document incorporated by reference into these Regulations is a reference to the document as amended from time to time. (3) Despite subsection (2), if ISO Standard 14065 is amended, the previous version of the document may be complied with for a period of four years beginning on the day on which the amended version is published. (4) Despite subsection (2), the version of Quantification Methods to be complied with for a compliance period is the version that was most recently published prior to the day on which that compliance period begins. 3 These Regulations implement an output-based pricing system for industrial GHG emissions with respect to covered facilities where industrial activities are engaged in. 4 These Regulations set out (a) the manner in which a person responsible for a covered facility must, under Part 2 of the Act, provide a report that sets out the information with respect to the GHG emissions limit and cause the report to be verified; (b) the methods to quantify the GHGs from a covered facility and the production from each specified industrial activity engaged in at the covered facility; (c) the manner of determining the covered facility’s GHG emissions limit based on the facility’s production from each specified industrial activity and the applicable output-based standard; and (d) the manner in which compensation is provided for excess emissions and surplus credits are issued. 5 (1) Subject to section 22, GHGs must be quantified for the following emission types: (a) stationary fuel combustion emissions; (b) industrial process emissions; (c) industrial product use emissions; (d) venting emissions; (e) flaring emissions; (f) leakage emissions; (g) on-site transportation emissions; (h) waste emissions; and (i) wastewater emissions. (2) Output-based standards are established under these Regulations for the industrial activities set out in column 1 of Schedule 1 and for additional industrial activities engaged in at the covered facility. 6 (1) If a covered facility was designated on the condition that it would emit a quantity of GHGs of at least 10 kt of CO2e in any of the three calendar years following the date of first production, the Minister may cancel the designation under subsection 172(3) of the Act if the facility has not met that condition as of December 31 of the third calendar year following that date. (2) The Minister must provide notice of their intention to cancel the covered facility’s designation to the person responsible for the covered facility at least 30 days before cancelling the designation. 6.1 If the Minister receives a request to cancel a designation of a covered facility during a calendar year and the Minister decides, under subsection 172(3) of the Act, to cancel the designation, that cancellation is effective as of December 31 of the calendar year in which the decision is made. 7 (1) A facility ceases to be a covered facility under the following circumstances: (a) it has ceased production from all specified industrial activities for five consecutive compliance periods; or (b) the person responsible for the covered facility makes a request to that effect because it is expected that the specified industrial activities engaged in at the covered facility will cease for at least 12 consecutive months. (2) A covered facility ceases to be a covered facility on the following date: (a) for the purposes of paragraph (1)(a), on December 31 of the fifth consecutive calendar year for which no production is reported in an annual report; and (b) for the purposes of paragraph (1)(b), on the later of (i) the 30th day following the date the Minister receives the request from the person responsible for the covered facility, or (ii) the date the covered facility ceases production. (3) [Repealed, SOR/2021-197, s. 3] 7.1 Subject to section 7.2, if a facility ceases to be a covered facility during a compliance period, the person who is responsible for that facility must comply with these Regulations and the requirements of Division 1 of Part 2 of the Act in respect of the portion of that compliance period during which it was a covered facility. 7.2 Section 7.1 does not apply in respect of a facility that ceases to be a covered facility because the Minister cancelled its designation in 2025 under subsection 172(3) of the Act. 8 For the purposes of paragraph (a) of the definition covered facility in section 169 of the Act, the following criteria must be met by a facility that is located in a province or area that is set out in Part 2 of Schedule 1 to the Act: (a) a report was made, in accordance with a Notice with respect to reporting of greenhouse gases (GHGs) published under section 46 of the Canadian Environmental Protection Act, 1999, in respect of that facility indicating that that facility emitted a quantity of GHGs equal to 50kt or more of CO2e, as one or more facilities as defined in such a notice, for the 2014 calendar year or any subsequent calendar year; and (b) the primary activity engaged in at the facility is any of the industrial activities set out in column 1 of Schedule 1. 8.1 Unless designated by the Minister as a covered facility under subsection 172(1) of the Act, an electricity generation facility is not included in the definition covered facility in section 169 of the Act if the industrial activity set out in paragraph 38(b) or (c), column 1, of Schedule 1 is engaged in at that facility and that facility (a) generates electricity for general distribution to the public in a geographic area that is neither serviced by an electrical network that distributes electricity and is subject to the standards of the North American Electric Reliability Corporation nor by a distribution system, (b) is not connected to an electrical network, for the distribution of electricity, that is subject to the standards of the North American Electric Reliability Corporation, and (c) is not connected to a distribution system. 9 (1) Subject to subsections (2) and (3), the specified period, for the purposes of the definition compliance period in section 169 of the Act, begins on January 1 and ends on December 31 for each calendar year, starting in 2019. (2) If a facility becomes a covered facility under the Act after January 1 of a given calendar year, its specified period, for the purposes of the definition compliance period in section 169 of the Act, begins on January 1 of the calendar year following (a) the calendar year during which the facility is registered under subsection 171(2) of the Act, if the facility meets the criteria set out in section 8, or (b) the calendar year during which the facility was designated as a covered facility under subsection 172(1) of the Act. (3) For the 2025 calendar year, if a facility ceases to be a covered facility because the Minister cancels its designation in 2025 under subsection 172(3) of the Act, the specified period in respect of that facility, for the purposes of the definition compliance period in section 169 of the Act, begins on January 1, 2025 and ends on March 31, 2025. 10 For the purposes of these Regulations, the person responsible for a facility or a covered facility is the person who owns or is otherwise responsible for the facility or covered facility, including the person who has the charge, management or control of the facility or covered facility, or who is the true decision maker with respect to the operations of the facility or covered facility. 10.1 (1) If a facility ceases to be a covered facility, the person responsible for that facility is deemed to be responsible for a covered facility with respect to (a) the requirements set out in section 173 of the Act; (b) the requirements set out in section 174 of the Act with respect to providing compensation; (c) the requirement under subsection 176(1) of the Act to notify the Minister of any errors or omissions; (d) the requirement under subsection 176(2) or 177(2) of the Act to submit any corrected report under section 62 or 63, respectively; (e) the requirement under paragraph 178(1)(a) of the Act to provide any compensation; (f) the requirements set out in section 181 of the Act; (g) the requirement to maintain the OBPS account referred to in section 14; (h) the requirement under subsection 187(5) of the Act to retain the information set out in section 47; and (i) the requirement to notify the Minister if there is a change in the person responsible, in accordance with section 48. (2) The requirements set out in paragraphs (1)(a) to (g) apply during the period necessary under the Act and the requirements set out in paragraphs (1)(h) and (i) apply during a period of seven years after the end of the year in which the facility ceased to be a covered facility. (3) If a facility ceases to be a covered facility, the person responsible for that facility is deemed to be responsible for a covered facility for the purpose of obtaining surplus credits under section 175 of the Act and paragraph 178(1)(b) of the Act. 11 (1) Subject to subsection (2) and section 16, the report that must be submitted by the person responsible for a covered facility for a compliance period under section 173 of the Act is prepared annually for each covered facility for which they are responsible and includes the information listed in Schedule 2 and the following information: (a) in respect of a covered facility, other than one referred to in paragraph (b) or (c), (i) the total quantity of GHGs from the covered facility during the compliance period, expressed in CO2e tonnes, as determined in accordance with section 17, and (ii) the covered facility’s production during the compliance period, from each specified industrial activity, quantified in accordance with section 31; (b) in respect of an electricity generation facility, (i) the total quantity of GHGs from each unit within the covered facility during the compliance period, expressed in CO2e tonnes, as determined in accordance with section 20, (ii) the sum of the total quantities of GHGs determined under subparagraph (i) for all units within the facility, expressed in CO2e tonnes, (iii) the production during the compliance period by each unit within the covered facility from each of the industrial activities set out in paragraphs 38(a) to (c), column 1, of Schedule 1 that are engaged in at the unit, separately for each industrial activity, quantified in accordance with section 32, and (iv) the sum of the production from all of the units within the covered facility during the compliance period, from all of the industrial activities set out in paragraphs 38(a) to (c), column 1, of Schedule 1; (c) in respect of a covered facility, where the specified industrial activities are both the production of coal by mining coal deposits and, if composed of a unit or a group of units that are registered under the Reduction of Carbon Dioxide Emissions from Coal-fired Generation of Electricity Regulations, the generation of electricity, (i) the total quantity of GHGs from the covered facility during the compliance period, which is the sum of the total quantity of GHGs from the mining of coal deposits, determined in accordance with section 17, and the total quantities of GHGs from the generation of electricity, determined in accordance with section 20, expressed in CO2e tonnes, (ii) with respect to the production of coal by mining coal deposits, the production during the compliance period from each specified industrial activity, in accordance with section 31, and (iii) with respect to the generation of electricity, (A) the production during the compliance period by each unit within the covered facility from each of the industrial activities set out in paragraphs 38(a) to (c), column 1, of Schedule 1 that are engaged in at the unit, separately for each industrial activity, in accordance with section 32, and (B) the sum of the production from all of the units within the covered facility during the compliance period, from all of the industrial activities set out in paragraphs 38(a) to (c), column 1, of Schedule 1; (d) the quantity of GHGs emitted from the covered facility during the compliance period as determined in accordance with section 35, and, if captured and stored CO2 is being subtracted under that section, the total quantity of CO2 captured and stored in a storage project that meets the criteria in subsection 35(2); (e) the GHG emissions limit applicable to the covered facility for the compliance period, calculated (i) in respect of a facility referred to in paragraph (a), in accordance with section 36, 36.1 or 36.2, (ii) in respect of a facility referred to in paragraph (b), in accordance with section 41, 41.1 or 41.2, and (iii) in respect of a facility referred to in paragraph (c), in accordance with section 42; and (f) the positive result (corresponding to the quantity of GHGs emitted in excess of the emissions limit) or negative result (corresponding to the difference between the quantity of GHGs emitted and the emissions limit and indicating emissions below the emissions limit) obtained under section 44 for the compliance period, expressed in CO2e tonnes. (1.1) For the purposes of subparagraph (1)(a)(ii), if section 36.2 applies with respect to a covered facility, the annual report must include the gross quantity of electricity generated that is attributed the capacity added to the equipment and gross quantity of electricity generated that is attributed to the capacity of the equipment before the additional capacity was added, separately, quantified in accordance with section 31 and subsection 36.2(3). (1.2) For the purposes of subparagraphs 1(b)(iii) and (iv) and (c)(iii), if section 41.2 applies with respect to an electricity generation facility, the annual report must include, (a) for each unit whose electricity generation capacity from gaseous fuels was increased by 50 MW or more and that is designed to operate at a thermal energy to electricity ratio of less than 0.9, the gross amount of electricity generated during the compliance period by each unit that is attributed to the capacity added to the unit and the gross amount of electricity generated that is attributed to the capacity of the unit before the additional capacity was added, in accordance with section 32 and subsection 41.2(3), separately; and (b) the sum, from all of the units referred to in paragraph (a), of the gross amount of electricity generated that is attributed to the capacity added to the units and of the gross amount of electricity generated that is attributed to the capacity of the units before the additional capacity was added, separately. (2) Paragraphs (1)(e) and (f) do not apply with respect to a report that must be submitted by the person responsible for a covered facility for which sections 36 to 42 do not apply under section 43. (3) For the purposes of subparagraph (1)(a)(ii), an additional industrial activity that was recognized by the Minister during a calendar year is not taken into account for the annual report for the compliance period that corresponds to that calendar year. 12 (1) If the person responsible for a covered facility sells thermal energy that is produced at the covered facility to other covered facilities or buys thermal energy from any other covered facility, they must include in their annual report (a) the quantity of thermal energy, expressed in gigajoules, as well as the thermal energy’s temperature and pressure, (i) sold to another covered facility during the compliance period, as determined by the quantity of thermal energy on sales receipts or by another objective method, or (ii) bought from another covered facility during the compliance period, as determined by the quantity of thermal energy on sales receipts or by another objective method; and (b) the ratio of heat from the combustion of fossil fuel to produce that thermal energy, calculated in accordance with section 34. (2) The person responsible for a covered facility where the specified industrial activity set out in item 10, column 1, of Schedule 1 is engaged in, must include in their annual report, the quantity, in tonnes, of each gypsum product that contains at least 70 weight percent of calcium sulphate dihydrate produced during the compliance period. (3) If a covered facility where a specified industrial activity set out in items 2, 3, 15 or 29, column 1, of Schedule 1 is engaged in produces hydrogen gas, the person responsible for the covered facility must include in their annual report the quantity of hydrogen gas produced during the compliance period, in tonnes, and the quantity of hydrogen gas sold during the compliance period, in tonnes. 13 (1) The person responsible for a covered facility must submit their annual report to the Minister, on or before June 1 of the calendar year following the end of the compliance period for which the annual report is prepared, along with a verification report prepared in accordance with section 52. (2) The person responsible for a covered facility must correct the errors or omissions, identified by a verification body during the verification of the annual report, prior to submitting the annual report to the Minister, if possible. 14 The account that the person responsible for the covered facility opens in accordance with subsection 186(1) of the Act is an Output-Based Pricing System account (OBPS account). 15 A request for confidentiality submitted for the purposes of section 254 of the Act must provide the following information: (a) the information to which the request pertains, clearly identified; (b) the reason for the request from among those specified in paragraphs 254(a) to (c) of the Act; and (c) the supporting justification that the information referred to in paragraph (a) has been treated as confidential by the person making the request and is not, and has never been, available to the public. 16 (1) The production of a petrochemical product set out in item 17, column 1, of Schedule 1 as a by-product, at a covered facility where an industrial activity, other than one set out in that item is engaged in, is not an industrial activity covered by item 17, column 1, of Schedule 1. (2) If natural gas liquids are produced at a covered facility where a specified industrial activity set out in item 3 or 17, column 1, of Schedule 1 is engaged in, the following rules apply: (a) for the purposes of section 17, the person responsible for the covered facility must quantify the GHGs from the production of natural gas liquids in accordance with the methods applicable to the industrial activity set out in item 3 or 17, as the case may be, column 1, of Schedule 1; and (b) for the purposes of sections 31, 36 and 36.2, the industrial activity set out in item 4, column 1, of Schedule 1 is deemed not to be engaged in at the covered facility. (3) If hydrogen gas is produced at a covered facility where a specified industrial activity set out in item 2, 3, 15 or 29, column 1, of Schedule 1 is engaged in, the following rules apply: (a) for the purposes of section 17, the person responsible for the covered facility must quantify the GHGs from the production of hydrogen gas in accordance with the method applicable to the industrial activity set out in item 2, 3, 15 or 29, as the case may be, column 1, of Schedule 1; and (b) for the purposes of sections 31, 36 and 36.2, the industrial activities set out in items 6 and 17, column 1, of Schedule 1 are deemed not to be engaged in at the covered facility. (4) If metal tubes are produced at a covered facility where a specified industrial activity set out in item 19 or 20, column 1, of Schedule 1 is engaged in, the following rules apply: (a) for the purposes of section 17, the person responsible for the covered facility must quantify the GHGs from the production of metal tubes in accordance with the method applicable to the industrial activity set out in item 19 or 20, as the case may be, column 1, of Schedule 1; and (b) for the purposes of sections 31, 36 and 36.2, the industrial activity set out in item 22, column 1, of Schedule 1 is deemed not to be engaged in at the covered facility. (5) If lime is produced at a covered facility where a specified industrial activity set out in item 20, column 1, of Schedule 1 is engaged in, the following rules apply: (a) for the purposes of section 17, the person responsible for the covered facility must quantify the GHGs from the production of lime in accordance with the method applicable to the industrial activity set out in item 20, column 1, of Schedule 1; and (b) for the purposes of sections 36 and 36.2, the industrial activity set out in item 8, column 1, of Schedule 1 is deemed not to be engaged in at the covered facility. (6) If electricity is produced at a covered facility where a specified industrial activity set out in item 20, column 1, of Schedule 1 is engaged in, the following rules apply: (a) for the purposes of section 17, the person responsible for the covered facility must quantify the GHGs from the generation of electricity in accordance with the method applicable to the industrial activity set out in item 20, column 1, of Schedule 1; and (b) for the purposes of section 36, the industrial activity set out in item 38, column 1, of Schedule 1 is deemed not to be engaged in at the covered facility. (6.1) If evaporated salt is produced through solution mining at a covered facility where a specified industrial activity set out in item 24, column 1, of Schedule 1 is engaged in, the following rules apply: (a) for the purposes of section 17, the person responsible for the covered facility must quantify the GHGs from the production of evaporated salt in accordance with the method applicable to the industrial activity set out in item 24, column 1, of Schedule 1; and (b) for the purposes of sections 31, 36 and 36.2, the industrial activity set out in item 24.1, column 1, of Schedule 1 is deemed not to be engaged in at the covered facility. (7) If zinc and lead are pyrometallurgically smelted at a covered facility where a specified industrial activity set out in paragraph 23(b), column 1, of Schedule 1 is engaged in, the following rules apply: (a) for the purposes of section 17, the person responsible for the covered facility must quantify the GHGs from the pyrometallurgical smelting of zinc and lead in accordance with the method applicable to the industrial activity set out in paragraph 23(b), column 1, of Schedule 1; and (b) for the purposes of sections 31, 36 and 36.2, the industrial activity set out in paragraph 23(c), column 1, of Schedule 1 is deemed not to be engaged in at the covered facility. (7.1) If lead is pyrometallurgically smelted and refined at a covered facility where a specified industrial activity set out in paragraph 23(c), column 1, of Schedule 1 is engaged in, the following rules apply: (a) for the purposes of section 17, the person responsible for the covered facility must quantify the GHGs from the pyrometallurgical smelting and refining of lead in accordance with the method applicable to the industrial activity set out in paragraph 23(c), column 1, of Schedule 1; and (b) for the purposes of sections 31, 36 and 36.2, the industrial activity set out in paragraph 23(b), column 1, of Schedule 1 is deemed not to be engaged in at the covered facility. (8) If gold, silver, platinum or palladium is produced at a covered facility where a specified industrial activity set out in paragraph 26(d), column 1, of Schedule 1 is engaged in, the following rules apply: (a) for the purposes of section 17, the person responsible for the covered facility must quantify the GHGs from the production of those metals in accordance with the method applicable to the industrial activity set out in paragraph 26(d), column 1, of Schedule 1; and (b) for the purposes of sections 31, 36 and 36.2, the industrial activity set out in paragraph 26(c) or (f), column 1, of Schedule 1 is deemed not to be engaged in at the covered facility. (9) Subject to subsection (9.1), if a petrochemical product referred to in item 17, column 1, of Schedule 1 is produced at a covered facility where a specified industrial activity set out in item 3 or 4, column 1, of that Schedule is engaged in, the following rules apply: (a) for the purposes of section 17, the person responsible for the covered facility must quantify the GHGs from the production of that petrochemical in accordance with the method applicable to the industrial activity set out in item 3 or 4, as the case may be, column 1, of Schedule 1; and (b) for the purposes of sections 31, 36 and 36.2, the industrial activity set out in item 17, column 1, of Schedule 1 is deemed not to be engaged in at the covered facility. (9.1) If a covered facility has at least one refinery that is engaged in a specified industrial activity set out in item 3, column 1, of Schedule 1, and one petrochemical plant, that is engaged in a specified industrial activity referred to in item 17, column 1, of Schedule 1, subsection (9) only applies to the refinery. (10) If silver, platinum or palladium is produced at a covered facility where a specified industrial activity set out in paragraph 26(f), column 1, of Schedule 1 is engaged in, the following rules apply: (a) for the purposes of section 17, the person responsible for the covered facility must quantify the GHGs from the production of those metals in accordance with the method applicable to the industrial activity set out in paragraph 26(f), column 1, of Schedule 1; and (b) for the purposes of sections 31, 36 and 36.2, the industrial activity set out in paragraph 26(c), column 1, of Schedule 1 is deemed not to be engaged in at the covered facility. 17 (1) Subject to subsection (5) and section 18, the total quantity of GHGs from a covered facility other than an electricity generation facility, during a compliance period, expressed in CO2e tonnes, is determined by the formula is the quantity of each GHG type “j” from the covered facility during a compliance period, for each specified emission type, determined in accordance with subsections (2) to (4); is the global warming potential of the GHG type “j” applicable to the compliance period and, if it is used to determine the quantities referred to in the descriptions of A, C and F in subsection 37(1), for the reference year “i”, the global warming potential applicable to the compliance period in respect of which the output-based standard is being calculated; is the ith specified emission type, where “i” goes from 1 to n and where n is the number of the facility’s specified emission types; and is the jth GHG type, where “j” goes from 1 to m and where m is the number of greenhouse gases. (2) The quantity of a GHG type “j” from a covered facility during a compliance period for a specified emission type “i” is the sum of the following quantities, determined in accordance with the applicable requirements set out in Quantification Methods: (a) the quantities of that GHG from industrial activities set out in column 1 of Schedule 1 and set out in column 2 of the table to the Part of Schedule 3 that is applicable to those industrial activities, for a specified emission type set out in column 1 of that table; (b) the quantities of that GHG from those industrial activities, but not set out in column 2 of the table to the Part of Schedule 3 that applies to those activities or for a specified emission type not set out in column 1 of that table; and (c) any quantity of that GHG that is not referred to in paragraph (a) or (b). (3) If the quantity of a GHG is determined in accordance with subsection (2), the sampling, analysis and measurement requirements that apply are those set out in Quantification Methods. (4) For the purposes of subsection (2), if, for any reason beyond the control of the person responsible for a covered facility, the data required to quantify the GHGs from a covered facility are missing for a given period of a compliance period, replacement data for the given period must be calculated in accordance with Quantification Methods. (4.1) [Repealed, SOR/2023-240, s. 12] (5) For the purposes of the determination made under subsection (1), the quantities of CH4 and N2O generated from stationary devices that combust biomass for the purpose of producing useful heat are subtracted from the quantities of CH4 and N2O calculated in accordance with subsections (2) to (4) for stationary fuel combustion emissions. 18 For the purposes of section 17, the quantities of the GHGs for specified emission types from the generation of electricity using fossil fuels by a covered facility — other than a covered facility referred to in paragraph 11(1)(c) — are determined in accordance with the methods that are applicable to any of the industrial activities engaged in at the covered facility. 19 [Repealed, SOR/2023-240, s. 13] 20 (1) Subject to subsection (6), with respect to an electricity generation facility, the total quantity of GHGs from each unit within a facility, during a compliance period, expressed in CO2e tonnes, is determined by the formula is the quantity of each GHG type “j” from the unit during a compliance period for each specified emission type determined in accordance with subsections (2) to (5); is the global warming potential of the GHG type “j” applicable to the compliance period; is the ith specified emission type, where “i” goes from 1 to n and where n is the unit’s number of specified emission types; is the jth GHG type, where “j” goes from 1 to m and where m is the number of greenhouse gases. (2) The quantity of a GHG type “j” generated by a unit during a compliance period for a specified emission type “i” is the sum of the following quantities, determined in accordance with the applicable requirements set out in Quantification Methods: (a) the quantities of the GHG that is set out in column 2 of the table to Part 38 of Schedule 3 for a specified emission type set out in column 1; and (b) any quantity of the GHG that is not referred to in paragraph (a). (3) For the purposes of paragraph (2)(b) or (c), if the GHGs for a specified emission type referred to in subsection (2) can only be quantified for the facility as a whole, the quantity of those GHGs must be apportioned to the facility’s units on the basis of each unit’s total generation of electricity relative to the facility’s total generation of electricity. (4) If the quantity of a GHG is determined in accordance with subsection (2), the sampling, analysis and measurement requirements that apply are those set out in Quantification Methods. (5) For the purposes of subsection (2), if, for any reason beyond the control of the person responsible for a covered facility, the data required to quantify GHGs generated by a unit are missing for a given period of a compliance period, replacement data for the given period must be calculated in accordance with Quantification Methods. (6) For the purposes of the determination made under subsection (1), the quantity of CH4 and N2O generated from stationary devices that combust biomass for the purpose of producing useful heat are subtracted from the quantity of CH4 and N2O calculated in accordance with subsections (2) to (5) for stationary fuel combustion emissions. 21 For the purposes of section 20, if a combustion engine unit and a boiler unit share the same steam turbine, the GHGs from those units are quantified as follows: (a) with respect to a combustion engine unit, the quantification provisions apply to the assembly comprised of combustion engines and any other equipment connected to them, including the steam turbine that it shares with the boiler unit; and (b) with respect to a boiler unit, the quantification provisions apply to the assembly comprised of boilers and any other equipment connected to them, including the steam turbine that it shares with the combustion engine unit. 22 (1) CO2 from biomass is not included in the quantity of CO2 calculated in accordance with subsections 17(2) to (4) or 20(2) to (5). (2) CH4 from venting or leakage emissions from an industrial activity set out in item 1, 2, 4 or 5, column 1, of Schedule 1 is not included in the quantity of CH4 calculated in accordance with subsections 17(2) to (4). 22.1 Unless otherwise provided for in a method set out in Quantification Methods, any measuring device that is used to determine a quantity for the purposes of these Regulations must (a) be installed, operated, maintained and calibrated in accordance with the manufacturer’s specifications, or, if those specifications are not available, with any applicable generally recognized national or international industry standard; and (b) maintain accuracy within plus or minus 5%. 23 (1) Subject to subsection (2), the quantity of a GHG for any specified emission type does not need to be included in the determination made under subsections 17(2) to (4) or 20(2) to (5) if the quantity of the GHG, expressed in CO2e tonnes, does not exceed 0.5% of the total quantity of GHGs determined under subsection 17(1) or 20(1). (2) The sum of the quantities of GHGs not included under subsection (1) cannot exceed 0.5% of the total quantity of GHGs determined under subsection 17(1) or 20(1). 24 [Repealed, SOR/2021-197, s. 10] 25 If a continuous emissions monitoring system is used to quantify GHGs under these Regulations, the person responsible for the covered facility must ensure that the system complies with the requirements set out in Quantification Methods. 26 Despite sections 17 and 20, the person responsible for a covered facility may use a method other than a method set out in Quantification Methods if they have a permit issued in accordance with section 28. 27 (1) An application for a permit must be submitted to the Minister and must contain the information referred to in Schedule 4. (2) The application must be accompanied by a certification, dated and signed by the person responsible for the covered facility or by their authorized official, stating that the information contained in the application is accurate and complete. 28 (1) The Minister must issue the permit to use a method of quantification other than the method set out in Quantification Methods if (a) the person responsible for the covered facility establishes that, at the time of the application, it is not technically or economically feasible to use the method set out in Quantification Methods; (b) the person responsible for the covered facility demonstrates that the method being proposed is at least as rigorous as the requirements set out in Quantification Methods and provides equivalent results to those that would have been obtained from those requirements; (c) the person responsible for the covered facility provides a plan describing measures that will be taken to enable the use of the method set out in Quantification Methods and the implementation period for that plan, up to a maximum of two years; and (d) the requested term of the permit does not exceed the period for which the permit is necessary. (2) The term of the permit must not exceed 24 months. (3) The Minister must refuse to issue a permit if the Minister has reasonable grounds to believe that the applicant has provided false or misleading information in support of their application. (4) The permit can only be renewed once. 29 (1) The application for the renewal of a permit must include the information referred to in Schedule 4 and an explanation of the reasons why the plan that was submitted in the initial permit application was not implemented within the period identified in the initial application. The application for renewal must be submitted to the Minister at least 90 days before the expiration of the permit. (2) The Minister must renew the permit if the conditions set out in subsection 28(1) are met. 30 (1) The Minister must revoke the permit if the Minister has reasonable grounds to believe that the permit holder has provided false or misleading information. (2) Before revoking a permit, the Minister must provide the permit holder with (a) written reasons for the revocation; and (b) an opportunity to make written representations in respect of the revocation. (3) The revocation of a permit is effective 30 days after the day on which the Minister notifies the permit holder. 31 (1) Subject to subsection (4) and section 16, the production from a covered facility, other than an electricity generation facility, from each specified industrial activity during a compliance period is quantified (a) in the case of production from a specified industrial activity set out in items 1 to 37 and 39 to 44, column 1, of Schedule 1, in the units of measurement set out in column 2 of Schedule 1 for that industrial activity, and in accordance with any requirements set out in the applicable part of Schedule 3; (b) in the case of production from a specified industrial activity set out in paragraphs 38(a) to (c), column 1, of Schedule 1, the production is (i) quantified in whole for the compliance period in accordance with the requirements set out in sections 3 and 4 of Part 38 of Schedule 3, or (ii) not quantified, in whole or in part, for the compliance period; and (c) in the case of production from an additional industrial activity, in the units of measurement specified by the Minister for that activity. (2) Any measuring device that is used to determine a quantity for the purposes of these Regulations must (a) be installed, operated, maintained and calibrated in accordance with the manufacturer’s specifications or, if those specifications are not available, any applicable generally recognized national or international industry standard; and (b) maintain accuracy within plus or minus 5%. (3) If it is not possible to directly measure production using a measuring device, it may be quantified using engineering estimates or mass balance. (4) For the 2019 calendar year (a) the production quantified in accordance with paragraphs (1)(a) and (c), must be accurate within ± 5%; and (b) the production referred to in paragraph (1)(b) may be quantified by the person responsible for the regulated facility in accordance with subsection 9(2) and section 103 of the Greenhouse Gas Emissions Information Production Order, as it read before August 1, 2019. 32 (1) Subject to subsection (2), the gross electricity generated during a compliance period by each unit within the electricity generation facility, from each of the industrial activities set out in paragraphs 38(a) to (c), column 1, of Schedule 1 that is engaged in at the unit, is determined as follows: (a) if a unit uses only one fossil fuel to generate electricity, in accordance with subsection 1(1) and section 2 of Part 38 of Schedule 3; and (b) if a unit uses a mixture of fossil fuels or a mixture of biomass and fossil fuels to generate electricity, in accordance with subsections 1(2) and (3) and section 2 of Part 38 of Schedule 3. (2) The person responsible for the electricity generation facility may choose not to quantify part or all of the quantity of electricity generated from one unit or a group of units. 33 [Repealed, SOR/2021-197, s. 11] 34 (1) The ratio of heat from the combustion of fossil fuels during a compliance period is (a) equal to 1 when the thermal energy is produced from the combustion of only fossil fuels; (b) for a covered facility not referred to in paragraph (c), determined by the following formula if the thermal energy is produced from the combustion of both fossil fuels and biomass: is determined by the formula is the quantity of fossil fuel of type “i” combusted in the facility for the generation of thermal energy during the compliance period, determined in accordance with subsection 4(2) of Part 38 of Schedule 3, is the higher heating value of the fossil fuel of type “i” combusted in the facility for the generation of thermal energy during the compliance period, determined in accordance with Quantification Methods, and is the ith fossil fuel type combusted in the facility during the compliance period, where “i” goes from 1 to n and where n is the number of types of fossil fuels combusted, and is determined by the formula is the quantity of biomass fuel type “k” combusted in the facility for the generation of thermal energy during the compliance period, determined in accordance with subsection 4(2) of Part 38 of Schedule 3 and Quantification Methods, is the higher heating value for biomass fuel type “k” combusted in the facility for the generation of thermal energy during the compliance period, determined in accordance with Quantification Methods, and is the kth biomass fuel type combusted in the facility during the compliance period, where “k” goes from 1 to m and where m is the number of types of biomass fuels combusted; and (c) for an electricity generation facility, determined by the following formula when the thermal energy is produced from the combustion of both fossil fuels and biomass: is determined by the formula is the quantity of fossil fuel of type “i” combusted in the facility for the generation of thermal energy during the compliance period, determined in accordance with subsection 1(3) of Part 38 of Schedule 3, is the higher heating value of the fossil fuel of type “i” combusted in the facility for the generation of thermal energy during the compliance period, determined in accordance with Quantification Methods, and is the ith fossil fuel type combusted in the facility during the compliance period, where “i” goes from 1 to n and where n is the number of types of fossil fuel combusted, and is determined by the formula is the quantity of biomass fuel type “k” combusted in the facility for the generation of thermal energy during the compliance period, determined in accordance with subsection 1(3) of Part 38 of Schedule 3, is the higher heating value for biomass fuel type “k” combusted in the facility for the generation of thermal energy, during the compliance period determined in accordance with Quantification Methods, and is the kth biomass fuel type combusted in the facility during the compliance period, where “k” goes from 1 to m and where m is the number of types of biomass fuels combusted. (2) Despite paragraph (1)(b) or (c), if, for any reason beyond the control of the person responsible for a covered facility, the data required to quantify the ratio of heat from the combustion of fossil fuels are missing for a given period during the 2019 calendar year, 1 can be used as the ratio of heat from the combustion of fossil fuels. 35 (1) The person responsible for a covered facility must determine the quantity of GHGs that are emitted from the covered facility during a compliance period in accordance with the formula is the total quantity of GHGs from the covered facility, expressed in CO2e tonnes, during the compliance period, in the case of a facility referred to in paragraph 11(1)(a), determined in accordance with section 17, in the case of a facility referred to in paragraph 11(1)(b), corresponding to the sum referred to in subparagraph 11(1)(b)(ii), and in the case of a facility referred to in paragraph 11(1)(c), corresponding to the sum referred to in subparagraph 11(1)(c)(i); and is the quantity of CO2 captured at the covered facility that is stored during the compliance period in a storage project, determined using Quantification Methods, expressed in CO2e tonnes. (2) For the purposes of the description of B in subsection (1), the quantity of CO2 may only be included in that description if it has been included in the description of A and has been permanently stored in a storage project that meets the following criteria: (a) the geological site into which the CO2 is injected is (i) a deep saline aquifer for the sole purpose of storage of CO2, or (ii) a depleted oil reservoir for the purpose of enhanced oil recovery; and (b) the quantity of CO2 stored for the purposes of the project is captured, transported and stored in accordance with the laws applicable to Canada or a province or applicable to the United States or one of its states. (3) The quantity of CO2 from biomass is not included in the amount determined for B in subsection (1). (4) For greater certainty, the quantity of CO2 from a covered facility that has been captured but has not been permanently stored in a storage project that meets the requirements of subsection (2) is deemed to have been emitted by the covered facility and is included in the quantity of GHGs that are included in the description of A in subsection (1). 36 (1) Subject to subsection (2) and sections 16, 36.1, 36.2 and 42, the person responsible for a covered facility, other than an electricity generation facility, must determine the GHG emissions limit that applies to that covered facility for each compliance period, expressed in CO2e tonnes, in accordance with the formula is the covered facility’s production from each specified industrial activity “i” during the compliance period, quantified in accordance with section 31; is the following output-based standard applicable to the specified industrial activity “i”, as the case may be: for a specified industrial activity set out in column 1 of Schedule 1 and for which an output-based standard is set out in column 3 of that Schedule, that standard, for a specified industrial activity set out in column 1 of Schedule 1 and for which column 3 of that Schedule sets out that an output-based standard must be calculated in accordance with section 37, the output-based standard calculated in accordance with that section, and for an additional industrial activity, the output-based standard calculated in accordance with section 37; is the following tightening rate applicable to the specified industrial activity “i”, as the case may be: 0% for the specified industrial activity set out in item 38, column 1, of Schedule 1, 1% for the specified industrial activities set out in paragraph 3(c) and items 7, 8, 13, 17, 19, 20, 34, 40, 41 and 43, column 1, of Schedule 1, and 2% for all other specified industrial activities; is the calendar year that corresponds to the compliance period; and is the ith specified industrial

    The text continues in the official source.

    Related guides, FAQ and contract templates