Analyze this law with AI1 (1) The following definitions apply in these Regulations.
Act means the Indian Oil and Gas Act. (Loi)
actual selling price means
(a) in respect of oil, the price at which the oil is sold; and
(b) in respect of gas, the price or consideration payable that is specified in the gas sales contract, free of any fees or deductions other than transmission charges beyond the facility outlet. (prix de vente réel)
adjoining, in relation to two spacing units, means touching at a common point, without regard to any road allowances between the spacing units. (adjacentes)
bitumen means oil that does not flow to a well unless it is heated or diluted. (bitume)
exploration work includes mapping, surveying, examining geological, geophysical or geochemical data, test drilling and any other activities that are carried out by air, land or water and are related to the exploration for oil or gas. (travaux d’exploration)
external spacing unit, in relation to a First Nation, means any spacing unit that is not a First Nation spacing unit of that First Nation. (unité d’espacement externe)
First Nation spacing unit means a spacing unit in which 50% or more of the lands are First Nation lands of the same First Nation. (unité d’espacement d’une première nation)
horizontal section means the portion of a wellbore that has
(a) an angle of at least 80°, measured between the line extending from the initial point of penetration into the target zone to the end point of the wellbore in that zone and the line extending vertically downward from the initial point of penetration into that zone; and
(b) a minimum length of 100 m, measured from the initial point of penetration into the target zone to the end point of the wellbore in that zone. (tronçon horizontal)
horizontal well means a well that has been approved as a horizontal well by the provincial authority or a well with a horizontal section that has been approved by the provincial authority. (puits horizontal)
offset period means the period established in accordance with subsection 93(4). (délai de compensation)
offset well means a well that is located in a First Nation spacing unit adjoining an external spacing unit in which a triggering well is located and that is producing from the same zone as the triggering well. (puits de limite)
offset zone means the zone from which a triggering well is producing. (couche de compensation)
pool means a natural underground reservoir that contains or appears to contain an accumulation of oil or gas that is separate or appears to be separate from any other such accumulation. (bassin)
prescribed means prescribed by the Minister under subsection 5(1) of the Act. (Version anglaise seulement)
productive means producing or capable of producing oil or gas in a quantity that would warrant incurring
(a) the costs of completion, in the case of a well that has been drilled but not completed; or
(b) the costs of production, in the case of a well that has been completed. (productif)
provincial authority means the office, department or body that is authorized by law to make decisions, grant approvals, receive information or keep records respecting the exploration for, or the exploitation or conservation of, oil and gas in the province in which the relevant First Nation lands are located. (autorité provinciale)
service well means a well that is operated for observation or for the injection, storage or disposal of fluids. (puits de service)
spacing unit means an area in a zone that is designated as a spacing unit, a spacing area, a drainage unit or other similar unit by the provincial authority. (unité d’espacement)
subsurface contract means a permit or subsurface lease granted under the Act. (contrat relatif au sous-sol)
surface contract means a surface lease or right-of-way granted under the Act. (contrat relatif au sol)
surface rates means the amounts, referred to in subsections 73(2) and (3), that are to be paid by a surface contract holder. (droits de surface)
triggering well means a well that is producing from one or more external spacing units adjoining a First Nation spacing unit. (puits déclencheur)
unit agreement means an agreement that combines the rights or interests of all the holders of oil and gas rights or interests in all or part of a pool and that provides for the joint exploitation of the oil and gas and the payment of royalties based on an attribution of production rather than actual production, but does not include an agreement that attributes production from a well referred to in subsection 107(1). (accord de mise en commun)
well means a well that is used for the exploitation of oil or gas and includes a vertical well, a deviated well and a horizontal well. (puits)
zone means a stratum of lands identified as a zone in accordance with the log data set out in Schedule 3 or 4, as the case may be. (couche)
(2) A reference to a document that is incorporated by reference into these Regulations is a reference to the document as amended from time to time or, if the document no longer exists, to any successor to it that provides the same information.
2 (1) Any notice, document or information that is sent or submitted under these Regulations must be in paper or electronic form or published on the website of Petrinex or any successor to Petrinex.
(2) A contract holder must, in the prescribed form, provide the Minister with their address for service and send him or her a notice of any change to that address.
(3) Any notice, document or information that the Minister sends to a holder in paper form at their address for service is deemed to have been received by the holder four days after the day on which it is sent.
(4) Any notice, document or information that the Minister sends to a holder in electronic form at their latest address for service or publishes on the website of Petrinex or any successor to Petrinex is deemed to have been received by the holder on the day on which it is sent or published.
(5) A person may apply to the Minister for a record search of non-confidential, contractual documentation that is in the Minister’s possession and stored in electronic form if the application is in the prescribed form and accompanied by the record search fee set out in Schedule 1.
3 Despite any provision of these Regulations, a person is not obliged to submit information to the Minister that the Minister has stated is in his or her possession or is available to him or her from another source such as Petrinex.
4 When an application or other information is required by these Regulations to be submitted in a prescribed form but no form has been prescribed, the application or information may be submitted in any form.
5 When a notice, a document or information is required by these Regulations to be submitted in a specified format, the person required to submit it may use an alternative format if the Minister states that he or she has the capacity to read and use the information in that alternative format.
6 A person is eligible to be granted a contract if
(a) they are a corporation that is authorized by the laws of the relevant province to carry on business in that province or an individual who has reached the age of majority in that province;
(b) they are not in default under subsection 111(5); and
(c) in the case of a corporation, neither it nor any of its directors, officers or agents or mandataries has been convicted of an offence under subsection 18(2) of the Act within two years before the date of the bid, in the case of a grant by public tender, or the date of the application, in the case of a negotiated contract.
7 A contract holder must ensure that any requirement that is related to their contract and is imposed by these Regulations on a person other than the holder is satisfied.
8 (1) Every contract holder and person with a working interest in a contract is absolutely liable for any damage to the environment that is caused by operations carried out under the contract.
(2) Every operator, well licensee, pipeline licensee and facility licensee is absolutely liable for any damage to the environment that is caused by operations they carry out under the contract.
9 (1) A contract holder must obtain, and maintain during the term of the contract, an insurance policy that is adequate to cover all risks resulting from the operations to be carried out under the contract.
(2) The insurance policy must provide the following minimum coverage:
(a) comprehensive general liability insurance that covers the risks of damage caused by operations carried out under the contract with an inclusive bodily injury, death and property damage limit of at least $5,000,000 per occurrence, including occupier’s liability or liability for damage caused by immovables, employer’s liability, employer’s contingent liability, contractual liability, contractor’s protective liability, products liability, completed operations liability and contractor’s liability insurance;
(b) automobile liability insurance that covers all vehicles used in operations carried out under the contract with an inclusive bodily injury, death and property damage limit of at least $5,000,000 per occurrence; and
(c) if aircraft are to be used in operations carried out under the contract, aircraft liability insurance with an inclusive bodily injury, death and property damage limit of at least $10,000,000 per occurrence.
(3) Every insurance policy obtained by the holder must provide that the insurer’s right of subrogation is waived in favour of the Minister.
(4) The holder must send the Minister notice without delay if any coverage under their insurance policy is terminated and at least 30 days before the last day of coverage if the holder intends to cancel any of their coverage.
(5) The deductible of every insurance policy must not exceed 5% of the amount of insurance.
10 A holder may satisfy the requirement imposed by subsection 9(1) by providing the Minister with a letter of self-insurance in the prescribed form in which the holder
(a) acknowledges liability for any damage caused by operations carried out under the contract; and
(b) declares that their financial resources are adequate to cover that liability.
11 A contract holder must ensure that any person that carries out operations under the contract, other than an employee, obtains and maintains an insurance policy that is adequate to cover all risks resulting from those operations.
12 (1) The boundaries of a contract area must correspond to the boundaries of the legal land divisions of the relevant province if the lands in the contract area have been surveyed, or to the anticipated boundaries of those divisions if the lands have not been surveyed.
(2) If the lands in a contract area are surveyed during the term of the contract, the Minister must, after consulting with the holder and the council, amend the contract so that the description of the contract area complies with subsection (1).
(3) Subsections (1) and (2) do not apply if the lands in the contract area are First Nation lands whose configuration prevents compliance with those subsections.
13 (1) Every survey plan that is required under these Regulations must be
(a) plotted in accordance with the Canada Lands Surveys Act;
(b) approved by the Surveyor General of Canada; and
(c) recorded in the Canada Lands Survey Records.
(2) Subsection (1) does not apply to
(a) an exploration work survey plan; or
(b) a survey of lands under a treaty land entitlement agreement or a specific claim settlement agreement.
14 If a dispute arises regarding the location of a well, facility or boundary referred to in a contract, the Minister may order the contract holder to have a survey carried out as soon as the circumstances permit.
15 (1) A council whose First Nation lands are subject to a contract may, no more than once a year, submit a request to the Minister in the prescribed form for a meeting with the contract holder for the purpose of discussing the operations that have been carried out, or are planned to be carried out, in the contract area.
(2) The Minister must send the holder notice of a meeting request.
(3) The holder must organize the meeting and ensure that it takes place within 90 days after the day on which the Minister’s notice is received. In the case of multiple holders, they may designate one of their number to attend as their representative.
(4) If the holder has more than one contract in the First Nation lands, operations carried out under all the contracts may be discussed at the same meeting.
(5) Any expense relating to the request for, preparation for or attendance at a meeting must be borne by the party that incurs the expense.
16 An operator must, in the most expeditious manner possible, notify the Minister and the council of any unforeseen incident that occurs during operations carried out under a contract and that results, or could result, in bodily injury or death or in damage to First Nation lands or property. The operator must report the details of the incident, in the prescribed form, as soon as the circumstances permit.
17 For the purpose of monitoring compliance with the Act and these Regulations, a person may accompany an inspector who is inspecting a contract holder’s facilities and operations on First Nation lands if the person is authorized to do so by a written resolution of the council and the person has the certifications, and complies with the occupational health and safety requirements, required or imposed by the holder or by law.
18 (1) The annual rent that is payable under a contract must be paid on or before the anniversary of the effective date of the contract.
(2) The rent that is payable for the year in which a contract ends must be paid and is not refundable. However, any rent that has been paid for a subsequent year must be refunded.
(3) Subsection (1) does not apply to a contract that provides otherwise and was granted before the day on which these Regulations came into force.
19 (1) All money that is owed to Her Majesty under these Regulations or a contract must be paid to the Receiver General for Canada.
(2) The money must be accompanied by a statement, in the prescribed form, indicating the purpose for which it is paid.
20 (1) Any amendment to a contract or a bitumen recovery project requires the prior approval of the council and the Minister.
(2) The Minister must not approve an amendment unless
(a) an additional bonus is paid, if necessary, to reflect the fair value, determined in accordance with section 38, of the rights or interests granted by the amendment; and
(b) additional surface rates are paid, if necessary, in accordance with subsections 73(2) and (3).
(3) Subsection (1) does not apply to an amendment referred to in subsection 12(2) or to one that reduces the area of lands that are subject to a subsurface contract or a bitumen recovery project.
21 An operator that carries out operations in connection with a well must submit the following documents and information to the Minister and the council within the following time limits:
(a) before the day on which the well is spudded,
(i) a copy of the provincial licence authorizing the drilling of the well and a copy of the licence application,
(ii) the drilling and coring plan proposed for the well,
(iii) the geological prognosis,
(iv) any proposed horizontal drilling plan, and
(v) a copy of the surface lease survey plan;
(b) within 30 days after the day on which the well is rig-released,
(i) all daily drilling reports for the period beginning on the day on which the rig move begins and ending on the day of rig-release,
(ii) a copy of each wireline log prepared,
(iii) the results of any drill-stem test conducted,
(iv) a copy of the final downhole well drilling survey, if one is required by the provincial authority,
(v) any description, test or analysis resulting from an identification of any well sections that were cored, and
(vi) a copy of the geological report, if one is required by the provincial authority;
(c) within 30 days after the day on which the well is completed,
(i) all daily completion reports and the final downhole well schematic,
(ii) a copy of each wireline log prepared,
(iii) any core and fluid analyses prepared,
(iv) any swab reports prepared,
(v) the results of any pressure or flow tests conducted, including the results of any surface casing vent flow test,
(vi) a hydraulic fracturing fluid component information disclosure report, and
(vii) a detailed report of any downhole well intervention or stimulation;
(d) within 30 days after the day on which any recompletion or workover of the well is completed,
(i) all daily recompletion or workover reports,
(ii) a copy of each wireline log prepared,
(iii) any core and fluid analyses prepared,
(iv) any swab reports prepared,
(v) the results of any pressure or flow tests conducted, including the results of any surface casing vent flow test,
(vi) a hydraulic fracturing fluid component information disclosure report,
(vii) a detailed report of any downhole well intervention or stimulation, and
(viii) the final downhole well schematic;
(e) within 30 days after the day on which the well is downhole-abandoned, all daily operation reports relating to the downhole abandonment; and
(f) within 30 days after the day on which the well is surface-abandoned, all daily operations reports of the cut and cap operation and a copy of the final abandonment report submitted to the provincial authority.
22 The operator must submit to the Minister and the council any additional technical information about the well that is necessary to determine its productivity.
23 (1) Any information that is submitted to the Minister or a council under the Act must be kept confidential until the end of the period in which such information must be kept confidential under the laws of the relevant province, unless the person that submitted it consents in writing to its disclosure.
(2) Despite subsection (1), seismic data submitted by an exploration licence holder under paragraph 33(3)(a) may be disclosed by the Minister or the council on the earlier of
(a) if the holder also holds a subsurface lease or permit in lands in the licence area, the day on which the lease expires or is continued, the initial term of the permit expires or, in the case of a permit issued under the Indian Oil and Gas Regulations, 1995, the permit is converted to one or more leases, and
(b) the fifth anniversary of the day on which the exploration work is completed.
(3) Any interpretation of seismic data, including maps, that is submitted to the Minister or a council under the Act may be disclosed only if the person that submitted it consents in writing to its disclosure.
(4) Despite subsections (1) to (3), the Minister may at any time disclose
(a) confidential information to a council if required to do so by the Act, any regulations made under the Act or a contract; and
(b) the results of an environmental review referred to in subsection 29(3), 57(2) or 75(2) to a council or the public.
24 A person that submits information to the Minister and becomes aware that it is incorrect must submit the correct information to the Minister as soon as the circumstances permit.
25 (1) Any assignment of any of the rights or interests conferred by a contract must be approved by the Minister.
(2) Before the application for approval is submitted to the Minister, the assignee must meet with the council unless the council waives the meeting. The meeting must be face to face, unless the parties agree to another mode of meeting.
(3) Any expense relating to the request for, preparation for or attendance at a meeting must be borne by the party that incurs the expense.
(4) The application for approval must be in the prescribed form and include a statement by the assignee that a meeting with the council took place or that the council waived the meeting. The application must be accompanied by the assignment approval application fee set out in Schedule 1.
(5) The applicant must send the council a copy of the application for approval on or before the day on which the application is submitted to the Minister.
(6) The Minister must not approve the assignment if
(a) it is conditional;
(b) it would result in more than five persons having a right or interest in the contract;
(c) it assigns an undivided right or interest in the contract that is less than 1%;
(d) it divides the oil and gas rights or interests conferred by the contract;
(e) the assignee is not eligible under section 6;
(f) the assignment was not signed by the assignor and assignee; or
(g) the assignee fails to establish that they have the financial ability to fulfill the assignor’s obligations under the Act with respect to remediation and reclamation.
(7) If the Minister approves the assignment and signs it, he or she must send a copy to the assignor and assignee and a notice of the approval to the council.
(8) The assignment takes effect on the day on which the Minister approves it unless it provides for a different effective day.
26 (1) If the assignment is approved, the assignor and assignee are jointly and severally, or solidarily, liable for any obligation owing and any liability arising under the contract before the day on which the assignment is approved, even if the contract is subsequently assigned.
(2) Subsection (1) does not apply to an assignment that is approved before the coming into force of these Regulations.
27 (1) Every contract granted by the Minister under these Regulations includes the holder’s undertaking to comply with
(a) the Indian Act, and any orders made under that Act, as amended from time to time;
(b) the Act, and any regulations or orders made under the Act, as amended from time to time; and
(c) the laws of the relevant province, as amended from time to time, that relate to the environment or to the exploration for, or the exploitation, treatment, processing or conservation of, oil and gas, including equitable production, if those laws are not in conflict with the Act or any regulations or orders made under the Act.
(2) The provisions of any Act, regulation or order referred to in subsection (1) prevail over any terms and conditions of the contract, except for any terms and conditions respecting royalties that are the subject of a special agreement under subsection 4(2) of the Act, to the extent of any inconsistency. The provisions of any Act of Parliament, or any regulation or order made under an Act of Parliament, referred to in subsection (1) prevail over the laws of the province referred to in subsection (1), to the extent of any inconsistency.
(3) For the purposes of this section, provisions — whether legislative or contractual — are not inconsistent unless it is impossible for the holder to comply with both.
28 A person may carry out exploration work on First Nation lands if they
(a) hold an exploration licence;
(b) have obtained from the provincial authority any approval that is required to carry out exploration work in the province; and
(c) are in compliance with the terms and conditions of the licence and the approval.
29 (1) Before applying for an exploration licence, an applicant and the council must agree on the location of the proposed seismic lines and on the seismic rates, if those rates have not already been fixed in a related subsurface contract.
(2) The application must be submitted to the Minister in the prescribed form and include
(a) the terms and conditions negotiated with the council;
(b) if the approval of the provincial authority is required to carry out exploration work, a statement that the approval has been received;
(c) a description of the proposed exploration program, including the licence area, the exploration work to be carried out, the equipment to be used, the name of the geophysical contractor to be engaged and the anticipated duration of the work;
(d) the results of an environmental review of the proposed exploration program that has been conducted by a qualified environmental professional who deals with the applicant at arm’s length; and
(e) the exploration licence application fee set out in Schedule 1.
(3) The results of the environmental review must be submitted in the prescribed form and include
(a) a site evaluation that is based on the site’s topography, soils, vegetation, wildlife, sources of water, existing structures, archeological and cultural resources, traditional ecological knowledge, current land uses and any other feature of the site that could be affected by the proposed exploration program;
(b) a description of the operations to be carried out during the proposed exploration program, the duration of each and its location on the site;
(c) a description of the short-term and long-term effects that each operation could have on the environment of the site and on any surrounding areas;
(d) a description of the proposed mitigation measures, the potential residual effects after mitigation and the significance of those effects; and
(e) a description of the consultations undertaken with the council and the First Nation members.
(4) If the exploration program can be carried out without causing irremediable damage to the First Nation lands, the Minister must send the application to the applicant and the council, along with a letter that sets out the environmental protection measures that must be implemented to permit the licence holder to carry out their exploration program.
(5) To obtain the exploration licence, the applicant must, within 90 days after the day on which the reviewed application is received, submit to the Minister three copies of the environmental protection measures letter and three original copies of the application signed by the applicant, along with a written resolution of the council approving the licence.
(6) If the requirements set out in this section are met, the Minister must grant the exploration licence for a period of one year. The terms and conditions of the licence are those set out in the application and the environmental protection measures letter. The licence takes effect on the day on which it is signed by the Minister.
30 An exploration licence holder may exercise the rights conferred by the licence in a subsurface contract area, but in doing so must not interfere with any operations carried out under the subsurface contract.
31 Every exploration licence is subject to
(a) any surface rights or interests granted under an Act of Parliament; and
(b) any rights or interests related to the exploration or exploitation of minerals other than oil or gas in the licence area.
32 (1) An exploration licence holder must not drill to a depth of more than 50 m, unless authorized to do so by their licence.
(2) The holder must
(a) ensure that all environmental protection measures included in the licence are implemented and complied with;
(b) identify and mark the location of every test hole and shot hole that is drilled under the licence;
(c) repair and recondition any roads or road allowances that are damaged as a result of the exploration work as soon as the circumstances permit after the damage occurs;
(d) as soon as the circumstances permit, plug any hole that is drilled under the licence and that, during or after completion of the exploration work, collapses or emits gas, water or another substance;
(e) within 90 days after the day on which the exploration work is completed, pay compensation for the exploration work that was carried out, based on the rates specified in the licence or a related subsurface contract; and
(f) within 90 days after the day on which the exploration work is completed, submit to the Minister and the council
(i) a mylar sepia copy and a legible paper copy of a map, on a scale of not less than 1:50 000, that shows the location and ground elevation of every vibrating equipment station, test hole and shot hole,
(ii) summaries of any geologist’s and driller’s logs, indicating the depth and thickness of formations bearing water, sand, gravel, coal and other minerals of possible economic value, and
(iii) all technical information obtained from the drilling of each test hole.
33 (1) An exploration licence holder must submit an exploration report to the Minister within 90 days after the day on which the exploration work is completed.
(2) The report must comply with any exploration reporting requirements of the relevant province and must include, in addition to the documents and information referred to in paragraph 32(2)(f),
(a) a copy of every aerial photograph taken during the period of exploration;
(b) two copies of a geological report on the explored area, including stratigraphic data and structural and isopach maps on a scale of not less than 1:50 000; and
(c) a geophysical report on the explored area.
(3) The geophysical report must include
(a) if seismic work has been carried out,
(i) a mylar sepia copy and two legible paper copies of a map, on a scale of not less than 1:50 000, that shows contour lines drawn on the corrected time value at each source point for all significant reflecting horizons explored, with a contour line interval of not more than 10 m,
(ii) a mylar sepia copy and two prefolded paper copies of each stacked seismic cross-section, including migrated displays if that process has been carried out, with all significant reflecting horizons clearly labelled at both ends on one of the copies, and
(iii) two microfilm copies of all basic recorded data, including survey notes, chaining notes and observer reports;
(b) if a gravity survey has been carried out, two legible copies of a map, on a scale of not less than 1:50 000, that shows the location and ground elevation of each station, the final corrected gravity value at each station and gravity contour lines drawn on that value, with a contour line interval of not more than 2.5 µm/s2; and
(c) if a magnetic survey has been carried out, two legible copies of a map of the explored area, on a scale of not less than 1:50 000, that shows the location of the flight lines or grid stations and magnetic contour lines, with a contour line interval of not more than 5 nT.
(4) The holder may include maps at contour line intervals or scales other than those specified in subsections (2) and (3) if the alternative intervals or scales would enhance the interpretability of the maps.
(5) The Minister must make the information submitted under subsections (2) to (4) available to the council.
(6) In addition to the information submitted under this section, the holder must keep any information that was obtained as a result of the exploration work carried out in the contract area, including any printout, or magnetic digital display, of raw seismic data or interpreted seismic data, and must make it available for review by the Minister at the holder’s office during business hours after the later of
(a) if the holder also holds a subsurface lease or permit in lands in the licence area, 90 days after the day on which the lease expires or is continued, the initial term of the permit expires or, in the case of a permit issued under the Indian Oil and Gas Regulations, 1995, the permit is converted to one or more leases, and
(b) one year after the day on which the exploration work is completed.
34 When exploration work under an exploration licence is no longer being carried out, whether or not the licence has ended, the licence holder must ensure that all the lands on which the work was carried out are remediated and reclaimed.
35 (1) Oil and gas rights or interests in First Nation lands may be granted by the Minister under one of the following subsurface contracts:
(a) an oil and gas permit;
(b) an oil and gas lease.
(2) A subsurface contract must be granted in accordance with the public tender process set out in sections 39 to 42 or the negotiation process set out in sections 44 to 46, as chosen by the council. The negotiation process may be preceded by a call for proposals in accordance with section 43.
(3) When granting a subsurface contract, the Minister must grant all the rights to the oil and gas in each zone included in the contract area.
36 A subsurface contract holder’s rights or interests are subject to the right of an exploration licence holder to carry out exploration work in, and the right of any other subsurface contract holder to work through, the subsurface contract area.
37 (1) A subsurface contract may be granted to no more than five persons, each having an undivided right or interest in the contract of at least 1%. The right or interest must be expressed in decimal form to no more than seven decimal places.
(2) If two or more persons have an undivided right or interest in a subsurface contract, they are jointly and severally, or solidarily, liable for all obligations under the contract, the Act and these Regulations.
38 In determining the fair value of the rights or interests to be granted under a subsurface contract, the Minister must, in consultation with the council, consider the bonuses paid for grants of oil and gas rights or interests in other lands, which may be adjusted to take into account the following factors:
(a) the size of the other lands and their proximity to the First Nation lands;
(b) the time when the rights or interests in the other lands were granted;
(c) current oil and gas prices and the prices when the rights or interests were granted;
(d) the results of recent drilling operations in the vicinity of the other lands;
(e) similarities and differences in the geological features of the other lands and the First Nation lands; and
(f) any other factors that could affect the fair value of the rights or interests.
39 The Minister may grant the oil and gas rights or interests in First Nation lands by way of public tender only if the council requests or consents to that process.
40 (1) When oil and gas rights or interests are to be granted by way of public tender, the Minister must, after consulting with the council, prepare a notice of tender.
(2) The notice of tender must include the following information:
(a) the type of subsurface contract to be granted;
(b) the terms and conditions of the contract, other than those set out in these Regulations, or the address of a website where the terms and conditions are set out, including
(i) a description of the lands to be included in the contract area and the oil and gas rights or interests to be granted,
(ii) the surface rates and seismic rates,
(iii) the initial and intermediate terms of the permit or the term of the lease, as the case may be,
(iv) in the case of a permit, the earning provisions for the initial term, including the drilling commitment and deadline for completion, the target zone or depth to which each earning well must be drilled and a description of the lands to be earned by each, and
(v) the royalty to be paid, if it differs from the royalty provided for in these Regulations;
(c) the instructions for submitting a bid, including any information to be provided by bidders, the place where a bid may be submitted and the deadline for submission; and
(d) a statement indicating that the bidder acknowledges that they have reviewed and understood the terms and conditions of the contract to be granted and will be bound by those terms and conditions if theirs is the winning bid.
(3) The Minister must submit a copy of the proposed notice of tender to the council before publishing it and, if it is approved, must publish it
(a) in a publication known to the industry, such as the Daily Oil Bulletin published by JuneWarren-Nickle’s Energy Group; or
(b) on a website on which the Minister publishes information about oil and gas in First Nation lands.
41 (1) All bids must be submitted in accordance with the instructions set out in the notice of tender, be sealed and include
(a) the subsurface contract application fee set out in Schedule 1;
(b) the rent for the first year of the contract;
(c) the bonus; and
(d) the name and address for service of each proposed contract holder and the percentage share of each.
(2) The fee, rent and bonus must be paid in certified funds unless the notice of tender specifies a different form of payment.
42 (1) After the tender closes, the Minister must without delay open the bids, exclude any bids that do not meet the requirements of section 41, identify the bid with the highest bonus and send the council notice of that bid.
(2) The council or a person designated by the council may be present when the Minister opens the bids.
(3) If the highest bonus is included in more than one bid, the Minister must republish the notice of tender.
(4) The council may, within 15 days after the day on which the tender closes, notify the Minister by written resolution that it rejects the bid with the highest bonus. If such a notice is received, all bids must be rejected.
(5) If a council notifies the Minister that it approves the bid with the highest bonus, that bid cannot later be rejected under subsection (4).
(6) If a notice rejecting the bid is not received, the Minister must accept it and send the winning bidder a notice of acceptance. The contract takes effect on the day on which the tender closes.
(7) The Minister must publish the name of the winner and the winning bonus amount or, if no bid was accepted, a notice to that effect, in the publication or on the website where the notice of tender was published.
(8) Except for the name of the winning bidder and bonus amount, the information in bids must be kept confidential.
(9) The Minister must prepare the subsurface contract and send a copy to the council and the winning bidder.
(10) The Minister must return the fee, rent and bonus included in each unsuccessful bid to the person that submitted it.
43 For the purpose of soliciting interest in rights or interests in First Nation lands, either the council, or the Minister jointly with the council, may make a call for proposals. The call may be made by public notice or by other means and must include the following information:
(a) the type of subsurface contract to be granted;
(b) a description of the lands to be included in the contract area and the oil and gas rights or interests to be granted;
(c) the terms and conditions of the contract, other than those set out in these Regulations;
(d) the elements that will be considered in evaluating the proposals;
(e) a statement that the proposals that are received will form the basis for negotiations with the council and the Minister; and
(f) a statement that, in addition to the terms and conditions negotiated, the contract will include the terms and conditions set out in these Regulations.
44 (1) A person may apply to the Minister for a subsurface contract that confers oil and gas rights or interests in one or more zones in First Nation lands.
(2) Before applying for a subsurface contract, an applicant and the council must agree on the following terms and conditions:
(a) the type of subsurface contract to be applied for;
(b) a description of the lands to be included in the contract area and the oil and gas rights or interests to be granted;
(c) the amount of the bonus to be paid;
(d) the initial and intermediate terms of the permit or the term of the lease, as the case may be;
(e) in the case of a permit, the earning provisions for the initial term, including the drilling commitment and deadline for completion, the target zone or depth to which each earning well must be drilled and a description of the lands to be earned by each; and
(f) the royalty to be paid, if it differs from the royalty provided for in these Regulations.
(3) The application to the Minister must be in the prescribed form, set out the terms and conditions negotiated by the applicant and the council and be accompanied by the subsurface contract application fee set out in Schedule 1.
(4) Any information that is disclosed during the negotiations referred to in subsection (2) or in an application referred to in subsection (3) must be kept confidential.
45 (1) The Minister must not approve the application unless
(a) the lands and oil and gas rights or interests described in the application have been surrendered or designated under section 38 of the Indian Act; and
(b) the proposed bonus reflects the fair value of the rights or interests to be granted, determined in accordance with section 38 of these Regulations.
(2) If the application is approved, the Minister must prepare the subsurface contract and send a copy to the applicant and the council. The Minister must fix and include in the contract the surface rates to be paid under any related surface contract and the seismic rates to be paid under any related exploration licence.
(3) The surface rates must be fixed in accordance with subsections 73(2) and (3). The seismic rates must be comparable to seismic rates for exploration on lands, excluding provincial Crown lands, that are similar in size, character and use.
(4) If the application is not approved, the Minister must send the applicant and the council a notice of refusal that sets out the reasons for the refusal.
46 (1) The Minister must grant the contract if he or she receives the following within 90 days after the day on which a copy of the contract has been received by both the applicant and the council:
(a) a written resolution of the council approving the terms and conditions of the contract and stating that the council has chosen to have the rights or interests described in the contract granted by way of negotiation rather than public tender;
(b) the bonus and first year’s rent; and
(c) two original copies of the contract — as well as an original copy for each future contract holder — all of which are signed by each of them.
(2) The contract takes effect on the day on which it is granted, unless it provides otherwise.
47 A subsurface contract holder has the exclusive right to exploit the oil and gas in the lands in the contract area, to treat that oil, to process that gas and to dispose of that oil and gas.
48 (1) If the lands in a permit area are located in a province set out in column 1 of the table to Schedule 2 and in a region set out in column 2, the initial term of the permit is the term set out in column 3. Otherwise, the initial term is five years.
(2) If the lands in a permit area are located in more than one region set out in column 2 of the table to Schedule 2, the initial term is the term for the region in which the greatest portion of the lands is located. If the portion of lands in each region is the same, the initial term is the longer of the terms set out in column 3.
(3) The intermediate term of a permit is three years.
49 The term of an oil and gas lease is three years.
50 (1) Despite subsections 48(1) and (2) and section 49, with the consent of the applicant and the council, the Minister may fix the initial term of a permit or the term of a lease at a number of years that is greater than the number established by those provisions, to a maximum of five years.
(2) With the consent of the holder, the term of a subsurface contract may be amended, in accordance with subsection 20(1), to a maximum of five years.
51 The annual rent for a subsurface contract is $5 per hectare or $100, whichever is greater.
52 (1) A permit holder earns lands, and may select from those lands for the intermediate term of the permit, if, during the initial term, they have, in accordance with the earning provisions of their permit,
(a) drilled a new well in the permit area; or
(b) re-entered an existing well in the permit area and drilled at least 150 m of new wellbore.
(2) If a holder fails to meet a deadline set out in an earning provision of their permit, the permit terminates on the day of the deadline with respect to all lands that have not been earned on or before that day.
(3) A holder that has earned lands may select from those lands down to the base of the deepest zone into which they have drilled, as identified in accordance with Schedule 3.
(4) The lands selected under subsection (3) must
(a) be contiguous, if their configuration permits; and
(b) include the entire spacing unit in which the earning well is located.
53 (1) A permit holder that has drilled a well in a spacing unit whose area is composed of less than 75% First Nation lands may select only lands in the section in which the well is located, down to the base of the deepest zone into which they have drilled.
(2) A holder that has drilled a new well, but has not drilled to the extent required by the earning provisions of their permit, may select only lands in the section in which the well is located, down to the base of the deepest zone into which they have drilled.
(3) A holder that has re-entered and completed a well, but has not drilled to the extent referred to in paragraph 52(1)(b) and the earning provisions of their permit, may select only lands in the spacing unit in which the well is completed.
54 (1) A holder that wants a grant of oil and gas rights or interests for the intermediate term of their permit must apply to the Minister for approval of their selection of lands before the day on which the initial term of the permit expires or
(a) if the permit has terminated under subsection 52(2), within 15 days after the day referred to in that subsection; or
(b) if the deadline for applying has been extended under subsection 62(2), before the extension expires.
(2) A holder that fails to apply within the relevant deadline referred to in subsection (1) may apply for approval if the application is submitted within 15 days after the deadline and is accompanied by a late application fee of $5,000.
(3) The application must be in the prescribed form and include
(a) an identification and description of each well that has been drilled and each well that has been re-entered and completed;
(b) a description of the lands, including the zones, selected for the intermediate term of the permit; and
(c) the rent for the first year of the intermediate term.
(4) Information about a well that is drilled, or re-entered and completed, within 30 days before the relevant deadline may be submitted up to 15 days after that deadline, unless the holder has received an extension under subsection 62(2).
(5) On receiving an application, the Minister must
(a) approve the selection of lands if the requirements of section 52 are met; and
(b) grant the holder the oil and gas rights or interests in the selected lands for the intermediate term of the permit if the holder has complied with the requirements of the Act, these Regulations and their permit.
(6) If the selection is approved and the oil and gas rights or interests are granted, the Minister must send the holder and the council a notice of the approval and a description of the lands, including the zones, selected for the intermediate term of the permit. If the selection is not approved, the Minister must send the holder a notice of refusal that sets out the reasons for the refusal.
55 Sections 47 to 54 do not apply to a contract that was granted under the Indian Oil and Gas Regulations, 1995.
56 (1) A subsurface contract holder may apply to the Minister for approval of a bitumen recovery project if they have achieved the minimum level of evaluation and have applied to the provincial authority for approval of the project.
(2) The minimum level of evaluation is achieved when
(a) one well is drilled on each section of the lands that are subject to the contract — if the section is in the proposed bitumen recovery project area — and at least 25% of those wells are cored; or
(b) one well is drilled on at least 60% of the sections of the lands that are subject to the contract — if the sections are in the proposed bitumen recovery project area — at least 25% of those wells are cored and seismic data are obtained over at least 3.2 km in each undrilled section.
57 (1) An application for approval of a bitumen recovery project must be in the prescribed form and include
(a) a description of the lands to be included in the project;
(b) evidence that the minimum level of evaluation has been achieved;
(c) a statement that the subsurface contract holder has applied for or received the provincial authority’s approval of the project;
(d) the results of an environmental review of the project that has been conducted by a qualified environmental professional who deals with the holder at arm’s length;
(e) the terms and conditions respecting the royalty to be paid for the oil and gas recovered from lands in the project area;
(f) the reporting requirements for the project;
(g) a detailed description of the project, including its location, size and scope, the operations to be carried out, the schedule of pre-construction, construction and start-up operations and the reasons for selecting that schedule;
(h) a map indicating all the rights and interests in the lands in the project area and in any area that is likely to be affected by project operations;
(i) an aerial photographic mosaic of the project area at a scale that is adequate to show the location of the project components, including wells, facilities, tanks, access roads, railways, pipelines, public utility corridors, tailings ponds and waste storage sites;
(j) a detailed description of storage and transportation facilities for the oil and gas, including the size of any pipeline that may be used and the name of the entity that owns it;
(k) the anticipated rate of production of the oil and gas for the period for which approval is sought;
(l) the year and month in which the annual minimum level of production of bitumen will be achieved;
(m) a description of the energy sources to be used and their anticipated quantity and cost, along with a comparison to alternative sources; and
(n) the term of the approval sought, along with the anticipated starting and completion dates of the project.
(2) The results of the environmental review of the bitumen recovery project must be submitted in the prescribed form and include
(a) a site evaluation that is based on the site’s topography, soils, vegetation, wildlife, sources of water, existing structures, archeological and cultural resources, traditional ecological knowledge, current land uses and any other feature of the site that could be affected by the project;
(b) a description of the operations to be carried out during the project, the duration of each and its location on the site;
(c) a description of the short-term and long-term effects that each operation could have on the environment of the site and on any surrounding areas;
(d) a description of the proposed mitigation measures, the potential residual effects after mitigation and the significance of those effects; and
(e) a description of the consultations undertaken with the council and the First Nation members.
(3) After reviewing the application, the Minister must send the applicant and the council a letter that sets out the environmental protection measures that must be implemented to permit the subsurface contract holder to carry out operations under the project.
58 (1) The Minister must approve the bitumen recovery project if
(a) the applicant has achieved the minimum level of evaluation of the lands in the project area;
(b) a written resolution of the council approving the project has been submitted;
(c) the application meets the requirements of subsections 57(1) and (2);
(d) the project has been approved by the provincial authority; and
(e) the project can be carried out without causing irremediable damage to the First Nation lands.
(2) The approval may include any terms and conditions that are necessary to permit the Minister to verify the progress of operations carried out under the project, payment of the approved royalty and implementation and compliance with the environmental protection measures.
59 (1) The operations under a bitumen recovery project must not begin until the subsurface contract holder has obtained the surface contracts required by these Regulations.
(2) The holder must ensure that all environmental protection measures included in the approval are implemented and complied with.
60 (1) The annual minimum level of production of bitumen from the lands that are subject to a bitumen recovery project is equal to an average of 2 400 m3 per section in the project area.
(2) If the annual minimum level of production of bitumen from the lands that are subject to the bitumen recovery project is not achieved in any year following the month in which that level was to be achieved, the subsurface contract holder must pay compensation equal to 25% of the difference between the value of the minimum level of production and the value of the actual level of production.
(3) For the purpose of calculating the compensation, the price of bitumen is deemed to be the monthly Bitumen Floor Price published by the Alberta provincial authority for the relevant time period.
(4) This section does not apply if the lands that are subject to the bitumen recovery project are the subject of an authorization under section 42 of the Indian Oil and Gas Regulations, 1995.
61 Once a bitumen recovery project has been approved, the subsurface contract holder must obtain the approval of the Minister and the council before adding lands, wells or facilities to the project.
62 (1) A subsurface contract holder may apply to the Minister, in the prescribed form, for an extension of the deadline for applying for approval of a selection of lands under subsection 54(1) or for continuation under section 64 if
(a) the holder has spudded or re-entered a well for the purpose of deepening it or completing a new zone, but cannot finish the operation before the relevant term expires;
(b) the application is submitted before the relevant term expires;
(c) the application identifies the well and indicates when it was spudded or re-entered; and
(d) the application includes the rent for the following year.
(2) If an application is submitted in accordance with subsection (1), the Minister must extend the deadline for applying for approval of a selection of lands or for continuation to the 30th day after the day on which the spudded or re-entered well is rig-released. The Minister must send the council a notice of the extension.
(3) During an extension, the holder may continue to produce from any wells in the contract area that are already producing, but must not spud or re-enter any other wells in that area.
(4) This section applies to a permit or lease granted under the Indian Oil and Gas Regulations, 1995.
63 (1) A subsurface contract may be continued with respect to the zones, identified in accordance with Schedule 4, that are in a spacing unit
(a) that contains a productive well;
(b) that is subject, in whole or in part, to a unit agreement that includes lands in which a productive well is located, or to an oil or gas storage agreement that has been approved by the provincial authority;
(c) that is subject to a bitumen recovery project that has been approved by the Minister;
(d) that is subject to a project, other than a bitumen recovery project, that has been approved by the provincial authority and includes lands in which a productive well is located;
(e) in respect of which an offset notice has been received in the six months before the day on which the application for continuation is submitted or in respect of which a compensatory royalty is being paid;
(f) that is not producing but is shown by mapping to be capable of producing from the same pool from which a well on an adjoining spacing unit is productive; or
(g) that is potentially productive.
(2) For the purposes of subsection (1), each spacing unit from which a horizontal well or deviated well is productive is deemed to contain a productive well.
(3) For the purpose of paragraph (1)(g), a spacing unit is potentially productive if
(a) it contains a well that is in a mapped pool, is neither productive nor abandoned and
(i) was previously producing, or
(ii) contains evidence of the presence of hydrocarbons whose potential productivity has not been conclusively determined;
(b) it contains an abandoned well and any zone penetrated by the well has remaining oil or gas reserves; or
(c) it has not been drilled, there is evidence that it may be part of a productive pool and it is within a quarter-section in the case of oil — or a section in the case of gas — that adjoins any spacing unit referred to in paragraphs (1)(a) to (e).
64 (1) An application for the continuation of a subsurface contract may be made to the Minister before the day on which the lease or the intermediate term of the permit expires.
(2) The application must be in the prescribed form and include
(a) a description of the lands, including the zones, with respect to which continuation is sought;
(b) an indication of the basis for continuation under subsection 63(1) along with evidence of that basis; and
(c) the rent for the first year of the continuation.
65 (1) On receiving an application for continuation, the Minister must determine which lands described in the application are in a spacing unit referred to in any of paragraphs 63(1)(a) to (e) and must continue the contract with respect to those lands.
(2) If the Minister determines that lands described in the application are in a spacing unit referred to in paragraph 63(1)(f) or (g), he or she must send the holder an offer to continue the contract with respect to those lands.
(3) The Minister must continue the contract with respect to lands in a spacing unit referred to in paragraph 63(1)(f) or (g) if, within 30 days after the day on which the offer of continuation is received, the holder pays the Minister a bonus equal to the greater of
(a) $2,000, and
(b) $400 for each full or partial legal subdivision or, if the lands have not been divided into legal subdivisions, $400 for each unit of land equivalent to 16 hectares, rounded up to the nearest whole number of units.
(4) The Minister must send the holder and the council a notice of his or her determination and — if the contract is continued — a description of the lands, including the zones, with respect to which it is continued as well as the basis for continuation.
(5) Before notice of the Minister’s determination is received, the holder may continue to produce from any wells in the contract area that are already producing, but must not spud or re-enter any other wells in that area.
(6) If the contract is not continued, the Minister must refund the rent submitted with the application. If the contract is continued only in part, the Minister must refund the rent for the lands with respect to which the contract is not continued.
66 (1) The Minister may continue, for a maximum period of five years, a contract in respect of lands for which continuation was not granted under subsection 65(1) or lands for which continuation was granted under subsection 65(3) if
(a) the council requests the Minister to do so in a written resolution sent to the Minister that describes the lands, including the zones, to which the request relates and the requested period of continuation;
(b) a request for continuation under this subsection has not previously been made in respect of those lands;
(c) the written consent of the holder is sent to the Minister;
(d) the resolution and consent are sent
(i) in the case of a contract in respect of lands for which continuation was not granted under subsection 65(1), within 30 days after the day on which the notice referred to in subsection 65(4) is received, and
(ii) in the case of a contract in respect of lands for which continuation was granted under subsection 65(3), within 30 days after the day on which the continuation expires; and
(e) the holder has paid the rent for the first year of the continuation.
(2) If the Minister determines that an additional bonus must be paid to reflect the fair value, determined in accordance with section 38, of the rights or interests to be continued, the Minister m
The text continues in the official source.