SOR-2014-69:en — Nunavut Mining Regulations
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.
Analyze this law with AI1 (1) The following definitions apply in these Regulations.
Act means the Territorial Lands Act. (Loi)
boundary post
business day means a day other than a Saturday or a holiday. (jour ouvrable)
Chief means the Chief of Financial Analysis and Royalties Administration Section of the Department of Indian Affairs and Northern Development. (chef)
contiguous means units, claims or lands that, partly or totally, share a common boundary and not merely a point. (contigu)
corner post
cost of work means expenses incurred in performing work, but excludes all of the following:
(a) transportation costs outside Canada for persons who performed work or for equipment used in work;
(b) taxes and fees paid to any level of government or any institution of public government;
(c) costs of staking and recording a claim;
(d) legal fees;
(e) administrative costs; and
(f) expenses incurred in performing work referred to in paragraph (c) of the definition of work that exceed 10% of the total expenses incurred in performing the undertakings referred to in paragraph (a) and subparagraph (b)(ii) of that definition. (coût des travaux)
depreciable assets means buildings, plant, machinery and equipment. (actif amortissable)
environmental baseline studies means a description of selected environmental attributes that existed before mineral exploration or mining development and that are used to establish a benchmark from which to measure changes to the environment. Selected environmental attributes include meteorologic, hydrologic and hydro-geologic attributes, surface water and groundwater quality, aquatic resources, soil profiling, ecosystems, wildlife and wildlife habitat, cultural heritage and archaeology. (études environnementales de base)
exploration cost means an expense incurred for the purpose of determining the existence, location, extent, quality or economic potential of a mineral deposit in Nunavut, but does not include an expense incurred for the purpose of bringing a mine into production. (frais d’exploration)
fiscal year, in respect of a mine, means the fiscal period of the mine’s operator as that period is defined in section 249.1 of the Income Tax Act. (exercice)
holder of the surface rights means the lessee or registered holder of the surface rights to the land. (titulaire des droits de surface)
legal post
licence means a licence to prospect referred to in section 3. (licence)
mine means an undertaking that produces or has produced minerals or processed minerals from lands within the Nunavut Mining District referred to in section 2, and includes the depreciable assets that are located in Nunavut and used in connection with the undertaking. (mine)
mineral means amber and any naturally occurring inorganic substance, including frac sand, found in the Nunavut Mining District referred to in section 2, excluding material the taking of which is regulated under the Territorial Quarrying Regulations. (minéral)
mining property means
(a) a recorded claim or a leased claim within the boundaries of which a mine or part of a mine is situated; or
(b) a group of contiguous recorded or leased claims within the boundaries of which a mine or part of a mine is situated and
(i) that belong to the same owner, or
(ii) if the mine is operated as a joint venture, that are owned exclusively by the members of the joint venture or parties related to the members of the joint venture, regardless of the degree of ownership of each recorded claim or leased claim. (propriété minière)
mining reclamation trust means a trust that is established for a mine and that is created
(a) for the purposes of subsection 76(1) of the Nunavut Waters and Nunavut Surface Rights Tribunal Act; or
(b) as a condition of
(i) a lease issued under the Territorial Lands Regulations,
(ii) a contract with the Minister relating to the reclamation or environmental management of a mining property, or
(iii) a permit issued under the Territorial Land Use Regulations. (fiducie de restauration minière)
Mining Recorder means the person designated by the Minister as the Mining Recorder. (registraire minier)
mining royalty valuer means a person acting on the Minister’s behalf for the purpose of ascertaining the value of minerals or processed minerals produced from a mine. (évaluateur des redevances minières)
owner, in respect of a recorded claim, leased claim, mine or mining property, means any person with a legal or beneficial interest in the recorded claim, leased claim, mine or mining property. (propriétaire)
precious stone means a diamond, a sapphire, an emerald or a ruby. (pierre précieuse)
prescribed form means a form prescribed by the Minister under section 28 of the Act. (formule prescrite)
processing means crushing, grinding, flotation, beneficiation, concentrating, milling, roasting, smelting, leaching, recrystallization or refining performed on minerals, and if the output of a mine is precious stones, cleaning and sorting that output. (traitement)
processing assets means tailings disposal facilities and depreciable assets that are located in Nunavut and that are used directly and exclusively in processing. (biens utilisés pour le traitement)
prospecting permit means a prospecting permit issued under the Nunavut Mining Regulations as they read immediately before November 1, 2020. (permis de prospection)
related, in respect of two or more persons, means that the persons are
(a) related persons within the meaning of section 251 of the Income Tax Act, read without reference to paragraph 251(5)(b) of that Act;
(b) associated corporations within the meaning of section 256 of the Income Tax Act, read without reference to subsection 256(1.4) of that Act;
(c) affiliated persons within the meaning of section 251.1 of the Income Tax Act; or
(d) other than for the purpose of subsection 74(1), owners or operators of the same mine. (liées)
Supervising Mining Recorder means the person designated by the Minister as the Supervising Mining Recorder. (registraire minier en chef)
undeducted balance means
(a) in respect of a depreciation allowance, the original cost of the depreciable assets in respect of which the depreciation allowance is claimed, less any depreciation allowances previously claimed in respect of those assets;
(b) in respect of a development allowance, the undeducted balance of costs eligible for a development allowance under paragraph 70(1)(i); and
(c) in respect of a mining reclamation trust contribution allowance, the total of all contributions made to the mining reclamation trust, less any allowances previously claimed. (fraction non amortie)
unit means a unit described in section 4 of Schedule 3. (unité)
witness post
work means
(a) any of the following undertakings that are performed in respect of a recorded claim — or, for the purpose of subsection 42(3), in respect of a claim prior to its recording — for the purpose of assessing its mineral potential:
(i) examination of outcrops and surficial deposits,
(ii) excavation,
(iii) sampling,
(iv) geochemical study or analysis,
(v) drilling,
(vi) geological mapping,
(vii) geophysical study or analysis,
(viii) remote sensing, if one or more undertakings set out in subparagraphs (i) to (vii) have been performed to evaluate the results of the remote sensing and are reported on, together with the remote sensing, in accordance with subsection 42(1),
(ix) the placing of grid lines in the field for the purpose of performing any of the undertakings referred to in subparagraphs (i) to (vii),
(x) petrography,
(xi) data analysis, map generation and preparation of reports that are submitted under these Regulations in respect of undertakings referred to in subparagraphs (i) to (viii) and (x);
(b) any of the following undertakings that are performed in respect of a recorded claim:
(i) the preparation of a plan of survey under paragraph 57(1)(a);
(ii) the building of roads, airstrips or docks for the purpose of performing any of the undertakings referred to in paragraph (a); and
(c) environmental baseline studies that are conducted in conjunction with undertakings referred to in subparagraphs (a)(i) to (vii) and (ix) or subparagraph (b)(ii), as well as analysis of the data resulting from the studies, map generation and the preparation of an appendix as required in paragraph 4(t) of Schedule 2. (travaux)
(2) For the purposes of these Regulations, a person who is related to another person is considered to be also related to any person to whom the other person is related.
2 These Regulations apply in respect of the Nunavut Mining District, the area of which is described in Schedule 2 to the Northwest Territories Mining District and Nunavut Mining District Order.
3 (1) The Mining Recorder must issue a licence to prospect to a person who has applied for one and paid the applicable fee set out in Schedule 1 if the person is
(a) an individual who is 18 years of age or older; or
(b) a company that is incorporated or registered under the Business Corporations Act (Nunavut), S.N.W.T. 1996, c. 19, or that is incorporated under the Canada Business Corporations Act.
(2) An application for a licence must include
(a) the applicant’s name, address, telephone number and email address;
(b) the name, address, telephone number and email address of every person who is authorized to act on behalf of the applicant;
(c) in the case of an applicant who is an individual, proof that they are 18 years of age or older; and
(d) in the case of an applicant that is a corporation, the title of the Act referred to in paragraph (1)(b) under which the corporation is incorporated or registered under.
(3) A licence is valid from the date of its issuance or renewal until March 31 of the following calendar year.
(4) A licence may be renewed by making an application to the Mining Recorder containing the information set out in paragraphs (2)(a) and (b) and, in the case of an applicant that is a corporation, the information set out in paragraph 2(d). The application must be made not earlier than January 1 preceding the end of the period of validity of the licence.
(5) If, after the issuance or renewal of the licence, there is any change in information referred to in paragraph (2)(a) or (b) or, in the case of an applicant that is a corporation, any change in the information referred to in paragraph 2(d), the licensee must provide the new information to the Mining Recorder within 10 business days after the day on which the information was changed.
(6) A licence is not transferable.
4 Only a licensee or a person authorized to act on behalf of a licensee may
(a) prospect for the purpose of recording a claim;
(b) make an application for the recording of a claim, for a lease of a recorded claim or for the renewal of that lease;
(c) acquire, by themselves or with another licensee, a recorded claim, a lease of a recorded claim or an interest in either of them; and
(d) be issued a certificate of work under section 47 or a certificate of extension under subsection 49.2(1).
5 (1) It is prohibited to prospect on
(a) lands covered by a prospecting permit;
(b) lands covered by a recorded claim or a leased claim;
(c) lands mentioned in any of subsections 52(5) and (6), 56(1) and (2), 62.1(5) and (6) and 67(2), section 85 and subsections 93(4) to (6) that are not open for prospecting;
(d) lands that have been withdrawn from disposal under paragraph 23(a) of the Act or set apart and appropriated under any of paragraphs 23(b) to (e) of the Act by the Governor in Council;
(e) lands for which the minerals have been granted by the Crown;
(f) lands subject to a prohibition on prospecting under a land use plan that has been approved under federal legislation or under a land claims agreement; and
(g) lands used as a cemetery.
(2) The prohibition under paragraph (1)(a) does not apply to the permittee and the prohibition under paragraph (1)(b) does not apply to the claim holder or the lessee.
6 If the surface rights to lands have been granted or leased by the Crown, it is prohibited to enter on the surface of those lands to prospect unless
(a) the holder of the surface rights has consented to entry for the prospecting; or
(b) the Nunavut Surface Rights Tribunal has made an order that authorizes entry on those lands and that sets the compensation, if any, to the surface holder.
7 (1) It is prohibited to remove minerals or processed minerals from, or develop a mine within, the area of a recorded claim or a leased claim, except in the case of the holder of the recorded claim or the lessee.
(2) It is prohibited to remove minerals or processed minerals whose gross value exceeds $100,000 from a recorded claim that is not subject to a lease, except if the removal is for the purposes of assay and testing to determine the existence, location, extent, quality or economic potential of a mineral deposit within the claim.
(3) It is prohibited to erect on a recorded claim any building to be used as a dwelling or any mill, concentrator or other mine building, or to create any tailings or waste disposal area for the purpose of the commencement of production from a mine, unless the claim holder has been issued a lease of the surface rights to, or a grant of, the land covered by the claim.
8 (1) The Minister must establish and maintain an online mining rights administration system that
(a) allows for the making and processing of applications under these Regulations, other than a request referred to in section 84, to be done electronically;
(b) allows access by the public to documents relating to those applications; and
(c) represents the lands of Nunavut, as divided into grid areas, sections and units in accordance with Schedule 3, including the territorial lands of Nunavut described as the Nunavut Mining District referred to in section 2.
(2) An application, other than a request referred to in section 84, must be made in the prescribed form, if any, and submitted to the Minister or Mining Recorder by using the online mining rights administration system.
9 The Mining Recorder must ensure that the online mining rights administration system represents the lands that are open for prospecting and that are included in a unit for which an application to record a claim may be made.
10 (1) The Mining Recorder must record
(a) in respect of the recorded claims or leased claims that constitute a mining property or an interest in that property, a notice of any mining royalties payable that have not been paid within 30 days after
(i) the day on which a mining royalty return in respect of that property or interest is delivered to the Chief, or
(ii) the date of any notice of assessment or reassessment sent under subsection 75(1) or (2), unless a request for review of the assessment or reassessment has been made under section 84;
(b) every judgment or order made by a court of competent jurisdiction relating to the ownership of a recorded claim or a lease of a recorded claim and every decision made by the Minister, the Supervising Mining Recorder or the Mining Recorder; and
(c) on the payment of the applicable fee set out in Schedule 1, every other document filed in respect of a recorded claim or a lease of a recorded claim.
(2) Notice of the recording of a document under subsection (1) is considered to have been received as of the date of the recording of the document.
(3) A transfer of a recorded claim or a lease of a recorded claim, or any interest in either of them, is subject to all judgments, orders, liens and other encumbrances that were recorded against the claim or lease, or any interest in them, as of the date of the recording of the transfer.
11 (1) Subject to subsection (2), a person may
(a) consult the documents relating to a prospecting permit, recorded claim or lease of a recorded claim filed with the Mining Recorder, free of charge; and
(b) obtain a copy of any of those documents on payment of the applicable fee set out in Schedule 1.
(2) A person is not permitted to consult or obtain a copy of a report referred to in subsection 42(1), nor any accompanying or supporting document referred to in subsection 42(5) or (7), until the earlier of
(a) the day on which the recording of the claim is cancelled under section 50, subsection 53(3) or section 54 or 55 or, if a new claim has not been recorded under paragraph 67(3)(a), subsection 67(1), and
(b) the day after the third anniversary of the day on which the report was received by the Mining Recorder.
12 (1) A licensee may make an application to the Mining Recorder to record a claim.
(2) The application may be made in respect of not less than one unit and not more than 100 units.
(3) An application may be made in respect of a unit that is covered by lands referred to in subsection 5(1) or lands of Nunavut to which these Regulations do not apply to the extent that the unit is not entirely covered by those lands.
(4) If an application is made in respect of more than one unit,
(a) each unit must be contiguous to another unit in the claim; and
(b) the units in the claim must not enclose a unit that is not included in the claim.
(5) Despite subsection (3), the holder of a prospecting permit may make an application in respect of any unit that is, partly or totally, within their prospecting permit zone.
13 (1) If an application to record a claim satisfies the requirements set out in section 12, the Mining Recorder must record the claim on payment of the charge referred to in paragraph 40(1)(a).
(2) The lands referred to in subsection 5(1) may not be included in a claim.
(3) Despite subsection (2), if an application to record a claim is made by a holder of a prospecting permit, the recorded claim includes the lands for which the application is made that are within the prospecting permit zone and that are open for prospecting. Those lands subsequently no longer form part of the permit zone.
(4) A claim holder may, not later than the day that precedes the first anniversary date of the recording of the claim, make an application to the Mining Recorder to change the date of the recording to the date specified in the application. That date must not be earlier than the recording date of the claim and must precede the first anniversary date of the recording of the claim.
(5) The date of the recording of the claim may only be changed once.
(6) The Mining Recorder must change the date of the recording of the claim in accordance with the application. The change of date takes effect on the day on which the application is received by the Mining Recorder or, if a later day is set out in the application, on that day.
(7) Subsections (4) to (6) do not apply if a certificate of work has been issued under subsection 47(1) in respect of the claim.
14 (1) In this section, a recorded claim means any recorded claim other than a leased claim.
(2) If a unit contains, partly or totally, only one recorded claim and a land referred to in subsection 5(1) or a land of Nunavut to which these Regulations do not apply and that land is no longer referred to in subsection 5(1) or becomes subject to these Regulations, that land subsequently becomes part of that recorded claim.
(3) If a unit contains, partly or totally, more than one recorded claim and a land referred to in subsection 5(1) or a land of Nunavut to which these Regulations do not apply and that land is no longer referred to in subsection 5(1) or becomes subject to these Regulations, that land subsequently becomes part of one of those recorded claims, in accordance with the following order of priority:
(a) if at least one recorded claim is contiguous to that land,
(i) the claim that is contiguous to it and that was recorded under subsection 96(2) or, if two or more are contiguous to it, the claim that encompasses the claim that was staked first, or
(ii) the claim that is contiguous to it and that was recorded under subsection 13(1) or, if two or more are contiguous to it, the claim that was recorded first; and
(b) if there is no recorded claim that is contiguous to that land,
(i) the claim recorded under subsection 96(2) that encompasses the claim that was staked first, or
(ii) the claim that was recorded first under subsection 13(1).
15 The duration of a recorded claim is 30 years, beginning on its recording date, plus any extensions referred to in paragraphs 51(6)(a) and 67(4)(c), unless the recorded claim is leased under subsection 60(3) or its recording is cancelled under section 50, subsection 53(3) or section 54 or 55 or under subsection 67(1) without a new claim being recorded under paragraph 67(3)(a).
39 (1) A holder of a recorded claim must do work that incurs a cost of work annually beginning on the day on which the claim is recorded for each unit included in the recorded claim of at least
(a) $45 in respect of the first year;
(b) $90 in respect of the second, third and fourth years;
(c) $135 in respect of the fifth, sixth and seventh years;
(d) $180 in respect of the 8th, 9th and 10th years;
(e) $225 in respect of each of the 11th to 20th years; and
(f) $270 in respect of each of the 21st to 30th years.
(2) A cost of work that is set out in a certificate of work issued under subsection 47(1) for a year is, for the purpose of subsection (1), a cost of work done for that year.
(3) For the purposes of subsection (1), a unit is considered to be a unit that is entirely covered, either by a claim, or partly by a claim and partly by lands referred to in subsection 5(1) or lands of Nunavut to which these Regulations do not apply.
40 (1) The following per unit charges apply, annually beginning on the day on which the claim is recorded, to the right to hold a recorded claim and assess its mineral potential:
(a) $45 in respect of the first year beginning on the day on which the claim is recorded;
(b) $90 in respect of the second, third and fourth years;
(c) $135 in respect of the fifth, sixth and seventh years;
(d) $180 in respect of the 8th, 9th and 10th years;
(e) $225 in respect of each of the 11th to 20th years; and
(f) $270 in respect of each of the 21st to 30th years.
(2) The claim holder must pay the charges referred to in subsection 13(1), 49(1) or 49.1(2), as the case may be.
(3) For the purposes of subsection (1), a unit is considered to be a unit that is entirely covered, either by a claim, or partly by a claim and partly by lands referred to in subsection 5(1) or lands of Nunavut to which these Regulations do not apply.
41 Subject to subsection 97(1), a holder of a recorded claim must, in respect of the work required to be done under subsection 39(1), submit to the Mining Recorder
(a) within a period of 120 days beginning on the second anniversary date of the recording of the claim, a report of work referred to in section 42 in respect of the first and second years; and
(b) within a period of 120 days beginning on each subsequent anniversary date,
(i) a report of work referred to in section 42 in respect of the year preceding that date, or
(ii) an application for a one-year extension to do the work referred to in section 49.1.
42 (1) A report of work that has been done in respect of a claim must be prepared in accordance with Part 1 of Schedule 2, but if the report deals only with excavation, sampling or the examination of outcrops and surficial deposits — or any combination of them — and the cost of the work is less than $20,000, the report may be a simplified report prepared in accordance with Part 2 of Schedule 2.
(2) Work reported in one report must have been performed within a period of not more than 12 consecutive months during the four years immediately preceding the day on which the report was submitted and after the day on which the claim was recorded.
(3) Despite subsection (2), work that is done during the two years immediately preceding the day on which a claim is recorded is considered to have been done during the first year following the day on which it is recorded.
(4) The report must be prepared and signed
(a) in the case of a simplified report, by the individual who performed or supervised the work; and
(b) in all other cases, by a professional engineer or a professional geoscientist as those terms are defined in subsection 1(1) of the Engineers and Geoscientists Act, S Nu 2008, c. 2.
(5) The report must be accompanied by the following documents:
(a) a statement of work in the prescribed form;
(b) a table setting out the cost of work by type of work, together with, for each type of work, details of the costs sufficient to enable evaluation of the report in accordance with subsection 43(1); and
(c) a table setting out the cost of work that is allocated to each claim.
(6) If a holder of a recorded claim uses their own equipment to do work or personally does work,
(a) the cost claimed in relation to that equipment must not be more than the cost of leasing similar equipment for the period that the equipment is used in performing the work; and
(b) the cost claimed in relation to that work must not be more than the cost of engaging another person to do that work.
(7) The holder of a recorded claim must keep all supporting documents used to justify the cost of work and make them available on request to the Mining Recorder until the holder has received a certificate of work under section 47.
(8) Work reported must not be reported in any other report.
43 (1) The Mining Recorder must evaluate the reports referred to in section 41 and subsection 97(1) to assess their compliance with Schedule 2 and determine the cost of work to be set out in a certificate of work under subsection 47(2).
(2) The Mining Recorder may request, in writing, from the holder of the recorded claim, supporting documents that justify the cost of work that is specified in the request.
(3) If the holder of the recorded claim does not, within 120 days after the day on which the request is sent, provide the supporting documents that are requested, the cost of work to which they relate must be considered to be unjustified.
44 (1) Subject to subsection (2), if a recorded claim is not grouped under section 45 and the cost of work that has been justified in a report in respect of that claim exceeds the cost of work required to be done on it under subsection 39(1) at the time the certificate of work respecting the report is ready to be issued under subsection 47(1), the Mining Recorder must allocate the excess cost of work to the next year or years for which work is still required to be done on the claim under subsection 39(1).
(2) At any time before the evaluation of the report has been completed, the holder of a recorded claim may make an application to the Mining Recorder not to allocate the excess cost of work or to allocate it to fewer years for which work is still required to be done under subsection 39(1).
(3) The Mining Recorder must comply with the application.
(4) The holder of a recorded claim may make an application to the Mining Recorder for the allocation of any unallocated excess cost of work as specified in the application.
(5) If the unallocated excess cost of work is sufficient, the Mining Recorder must allocate it as specified in the application.
45 (1) Recorded claims may be grouped for the purpose of allocating the cost of work done with respect to them if
(a) the claims are contiguous;
(b) the grouping does not result in the enclosing of a unit that is not included in one of the claims;
(c) the total number of units in the group does not exceed 400; and
(d) none of the claims is leased.
(2) An application to group recorded claims must be made to the Mining Recorder and must be accompanied by the applicable fee set out in Schedule 1.
(3) If the requirements set out in subsections (1) and (2) are met, the Mining Recorder must issue a grouping certificate respecting the claims to each of the claim holders.
(4) A grouping certificate takes effect on the day on which the fee referred to in subsection (2) is received and ceases to have effect on the earliest of
(a) the day on which the recording of any claim in the group is cancelled under section 50, subsection 53(3), section 54 or 55 or subsection 67(1),
(b) the day on which a lease of any claim in the group takes effect, and
(c) the day on which a new grouping certificate in respect of any claim in the group takes effect.
46 (1) On application by one of the holders of a recorded claim listed in a grouping certificate, the Mining Recorder must allocate, in accordance with the application, the cost of work that has been justified in a report, for any year referred to in ss. 39(1), in respect of any of the claims listed in the grouping certificate to any of the other claims listed in the certificate.
(2) The cost of work allocated to a recorded claim referred to in a grouping certificate must not be reallocated to any recorded claim referred to in another grouping certificate.
47 (1) Subject to subsection 97(5), the Mining Recorder must issue a certificate of work if
(a) the evaluation of a report respecting a recorded claim has been completed; or
(b) an allocation of the excess cost of work has been done under subsection 44(1), (3) or (5) or 46(1).
(2) A certificate of work respecting a claim must set out the cost of work and the allocation of the cost of work.
48 (1) Remission of the charges paid or payable in respect of a year referred to in subsection 40(1) is granted in an amount equal to the cost of work allocated to a recorded claim during that year in the certificate of work.
(2) Any charge referred to in subsection 40(1) that has been paid to the Mining Recorder and that is remitted under this section must be repaid by the Minister to the person entitled to it.
49 (1) Subject to paragraph 50(c), if a certificate of work sets out an allocated cost of work that is less than the amount required by subsection 39(1), the holder of the recorded claim must pay a charge that is equal to the difference between the charges referred to in subsection 40(1) and the allocated cost of work set out in the certificate.
(2) Subsection (1) does not apply in respect of the year beginning on the day on which a claim is recorded under subsection 13(1).
(3) The claim holder must pay the charge within 120 days after the day on which the certificate is issued.
49.1 (1) The claim holder may make an application to the Mining Recorder for an extension for a one-year period to do the work as required under subsection 39(1).
(2) The application must be accompanied by an amount equal to the charge set out in any of paragraphs 40(1)(b) to (f) that is payable for the year in respect of which the extension is sought.
49.2 (1) The Mining Recorder must issue to the holder of a recorded claim a certificate of extension for a one-year period to do the work if
(a) in the case of a certificate of work setting out that the allocated cost of work is less than the amount required by subsection 39(1), the requirements set out in subsections 49(1) and (3) are met; and
(b) in the case where an application for an extension for a one-year period to do the work is made to the Mining Recorder, the requirement set out in subsection 49.1(2) is met.
(2) Subsection (1) does not apply if five certificates of extension have already been issued in respect of the claim under that subsection.
50 The recording of a claim is cancelled on
(a) the day after the last day on which a report must be submitted under section 41 or subsection 97(1), if a report in respect of the claim has not been submitted before that day in accordance with section 42 and
(i) a certificate of extension has not been issued in respect of the claim under paragraph 49.2(1)(b), or
(ii) a suspension in respect of the claim has not been recorded under section 51,
(b) subject to section 84, the day that is 121 days after the day on which a certificate of work setting out that the allocated cost of work is less than the amount required by subsection 39(1) has been issued in respect of the claim unless a certificate of extension has been issued to the claim holder under paragraph 49.2(1)(a), and
(c) if five certificates of extension have already been issued in respect of the claim under section 49.2, the day on which any subsequent certificate of work setting out that the allocated cost of work is less than the amount required by subsection 39(1) is issued.
51 (1) If a holder of a recorded claim is unable to do the work as required under subsection 39(1) because the claim holder is, for reasons beyond the claim holder’s control, waiting for a public authority to give an authorization or decision without which the work cannot proceed, the claim holder may make an application for a suspension of one year with respect to the claim — beginning on the anniversary date of the recording of the claim — of the work requirements set out in subsection 39(1) and the charges under subsection 40(1).
(2) The application must be made to the Supervising Mining Recorder not later than 120 days after the end of the year for which the suspension is applied for and must be accompanied by documents showing that the claim holder is waiting for the authorization or decision.
(3) If an order under section 11.02 of the Companies’ Creditors Arrangement Act has been made with respect to a claim holder, the holder of a recorded claim may make an application for a suspension, with respect to that claim, of the work requirements set out in subsection 39(1) and the charges under subsection 40(1) until the first anniversary date of the recording of the claim that is at least 12 months after the day on which the order has ceased to have effect.
(4) The application must be made to the Supervising Mining Recorder not later than 120 days after the day on which the order was made and must be accompanied by a copy of the order.
(5) If the requirements set out in subsections (1) and (2) or (3) and (4) are met, the Supervising Mining Recorder must record the suspension.
(6) When a suspension of the work requirements set out in subsection 39(1) and the charges under subsection 40(1) is recorded,
(a) the duration of the claim is extended by the duration of the suspension; and
(b) for the purpose of determining a year referred to in subsections 39(1) and 40(1), any year included in a suspension is to be excluded.
52 (1) The holder of a recorded claim (in this section referred to as the “original claim”) may make an application to the Mining Recorder to reduce the number of units included in the claim if
(a) a certificate of work in respect of the claim sets out a cost of work of at least $135 per unit;
(b) each unit included in the reduced-area claim is contiguous to another unit in that claim; and
(c) the units included in the reduced-area claim do not enclose a unit that is not included in that claim.
(2) Not more than one application for a reduced-area claim may be made per year beginning on the date of the recording of the original claim.
(3) The Mining Recorder must record the reduced-area claim if the conditions set out in subsections (1) and (2) are met.
(4) When a reduced-area claim is recorded,
(a) the recording date of the original claim is considered to be its recording date;
(b) the information recorded, including the applications and the documents filed with respect to the original claim, is considered to have been recorded or presented with respect to the reduced-area claim; and
(c) the recording of the original claim is cancelled.
(5) Subject to subsection (6) and section 14, the lands in the original claim that are not within the reduced-area claim are open for prospecting, and the units containing those lands are available for recording as a claim, beginning on the 31st day after the day on which the recording of the original claim is cancelled.
(6) If the Minister has reasonable grounds to believe that there is unremedied environmental damage to the lands referred to in subsection (5), the Minister may delay opening the lands for prospecting and making available the units containing those lands for recording as a claim.
(7) For one year after the recording of the original claim is cancelled under paragraph (4)(c), the former claim holder and any person related to the former claim holder are not permitted to apply to record a claim that includes any unit that was included in the original claim but does not form part of the reduced-area claim or to acquire a legal or beneficial interest in respect of that claim.
(8) For the application of subsections 39(1) and 40(1), the number of units included in the claim is considered to be reduced on the first anniversary date of the recording of the claim following the reduction.
53 (1) If the Mining Recorder has information that either of the following circumstances apply in respect of a recorded claim, the Mining Recorder must immediately send the claim holder a notice that the recording of the claim will be cancelled unless, within 120 days after the day on which the notice is sent, the holder can show that the information is not correct:
(a) the claim holder or the person authorized to act on their behalf was not authorized under these Regulations to acquire the claim or an interest in it, or
(b) the claim holder has contravened subsection 7(2).
(2) The notice must set out the reason for the impending cancellation and a summary of the evidence to support the cancellation.
(3) If the claim holder does not show the Mining Recorder that the information is not correct within 120 days after the day on which the notice is sent, the recording of the claim is cancelled.
(4)
53.1 (1) The Mining Recorder must cancel the recording of a claim in respect of which it is determined, on the recording date of the claim, that any land or unit was erroneously included in that claim (in this section referred to as the “original claim”).
(2) On the day on which the recording of the original claim is cancelled, the Mining Recorder must
(a) record a corrected claim without including the land or unit referred to in subsection (1) if it is possible to exclude that land or unit from the claim and to amend the boundaries of the claim; and
(b) notify the claim holder of the cancellation of the recording of the original claim and of the recording of any corrected claim.
(3) When a corrected claim is recorded, the information recorded, including the applications and documents filed with respect to the original claim, is considered to have been recorded or presented with respect to the corrected claim.
54 The recording of a claim is cancelled if the claim holder makes an application to the Mining Recorder to cancel it. The cancellation takes effect on the day on which the application is received by the Mining Recorder or, if a later day is set out in the application, on that day.
55 The recording of a claim is cancelled
(a) at the end of the 29-year period that begins on its recording date, plus any extensions referred to in paragraphs 51(6)(a) and 67(4)(c), if no application for a lease has been received by the Mining Recorder before the end of that period;
(b) at the end of the 30-year period that begins on its recording date, plus any extensions referred to in paragraphs 51(6)(a) and 67(4)(c), if an application for a lease has been received by the Mining Recorder and no lease has been issued on the claim under subsection 60(3) before the end of that period; or
(c) on the day on which a lease on the claim has terminated without being renewed under subsection 62(2) or has been cancelled under subsection 63(2) or section 64.
56 (1) Subject to subsection (2) and sections 14 and 85, the lands that were covered by a claim the recording of which has been cancelled under section 50, subsection 53(3) or section 54 or 55 are open for prospecting, and the units containing those lands are available for recording as a claim, beginning on the 31st day after the day on which the recording of the claim is cancelled.
(2) If the Minister has reasonable grounds to believe that there is unremedied environmental damage to the lands that were covered by a claim the recording of which has been cancelled under a provision set out in subsection (1), the Minister may delay opening the lands for prospecting and making available the units containing those lands for recording as a claim.
(3) For one year after the recording of the claim is cancelled under a provision set out in subsection (1), the former holder of the claim or leased claim and any person related to them are not permitted to make an application to record a claim that includes any unit that was included in the claim the recording of which has been cancelled or to acquire a legal or beneficial interest in respect of that claim.
57 (1) A holder of a recorded claim who wants to obtain a lease of the recorded claim must
(a) obtain a plan of survey of the claim made under section 31 of the Canada Lands Surveys Act;
(b) send a copy of the plan of survey and a notice in the prescribed form, by registered mail or courier, to the holders of
(i) all contiguous recorded claims and leased claims at their addresses provided to the Mining Recorder, and
(ii) the surface rights if the surveyed claim is located, partly or totally, on their lands or contiguous to those lands; and
(c) send to the Mining Recorder a copy of the plan of survey, the notice and evidence that the holders referred to in paragraph (b) have received those documents.
(2) On receipt of the documents referred to in paragraph (1)(c), the Mining Recorder must post the notice on the online mining rights administration system for a period of 21 days.
58 The Mining Recorder must record the plan of survey if
(a) 30 days have elapsed after the end of the period for the posting of a notice under subsection 57(2) and the Mining Recorder has not received any protest with respect to the survey;
(b) the applicable fee set out in Schedule 1 has been paid; and
(c) the requirements set out in section 57 have been met.
60 (1) A holder of a recorded claim who wants to obtain a lease of the claim must make an application to the Mining Recorder.
(2) The application must be made at least one year before the end of the duration of the recorded claim referred to in section 15 and must be accompanied by the applicable fee set out in Schedule 1.
(3) If the following requirements are met, the Minister must issue the lease to the claim holder for a term of 21 years:
(a) before the day on which the application to obtain the lease is made, a certificate of work has been issued in respect of the claim that allocates to the claim a cost of work of at least $1,260 per unit, of which the total of the costs of the plan of survey, of the construction of any roads, airstrips and docks and of environmental baseline studies does not exceed $250 per unit; and
(b) before the end of the duration of the recorded claim,
(i) a plan of survey of the claim has been recorded under section 58, and
(ii) the rent for the first year of the lease has been paid to the Mining Recorder.
(4) In respect of any year for which the recorded claim is leased, the work requirements set out in subsection 39(1) and the charges referred to in subsection 40(1) do not apply.
61 (1) The annual rent for a lease that was issued before November 1, 2020 is $2.50 per hectare during the first term and $5 per hectare during each renewed term before that date. The annual rent for a lease that is issued under subsection 60(3) on or after November 1, 2020 and for any lease that is renewed under subsection 62(2) on or after that date is $10 per hectare.
(2) The rent must be paid to the Mining Recorder before the anniversary date of the lease.
(3) Due to the COVID-19 pandemic, the Minister must waive the payment of the annual rent for a lease that becomes due under subsection (2) during the year beginning on March 13, 2020, if the Supervising Mining Recorder receives a written request for a waiver from the lessee before March 13, 2021.
(4) However, if the annual rent for a lease has already been paid to the Mining Recorder under subsection (2) during the year beginning on March 13, 2020, the Minister must waive the payment of rent for the following year, but the amount waived by the Minister must not exceed the rent paid to the Mining Recorder during the year beginning on March 13, 2020.
62 (1) A lease may be renewed by the lessee by making an application to the Mining Recorder at least 120 days before the day on which the lease expires but not earlier than two years before that day. The application must be accompanied by the applicable fee set out in Schedule 1 and the rent for the first year of the renewed lease.
(2) If the requirements set out in subsection (1) are met, the Minister must renew the lease for a period of 21 years.
62.1 (1) The lessee may, not later than one year before the day on which the lease expires, make an application to the Mining Recorder to reduce the number of units included in the recorded claim (in this section referred to as the “original claim”) that is leased if
(a) an application for renewal has already been made by the lessee to the Mining Recorder in accordance with subsection 62(1) or the application for reduction in area of the leased claim is accompanied by the application for the renewal;
(b) the application for reduction in area is accompanied by a plan of survey of the reduced claim made under section 31 of the Canada Lands Surveys Act;
(c) each unit included in the reduced-area claim is contiguous to another unit in that claim; and
(d) the units included in the reduced-area claim do not enclose a unit that is not included in that claim.
(2) Despite subsection (1), no application for reduction in area of a leased claim may be made in respect of a lease that was issued before November 1, 2020 or in respect of a claim for which an application to obtain a lease submitted to the Mining Recorder was pending on that date.
(3) The Mining Recorder must record the reduced-area leased claim when the lease is renewed if the conditions set out in paragraphs (1)(a) to (c) are met.
(4) When a reduced-area claim is recorded,
(a) the recording date of the original claim is considered to be its recording date;
(b) the information recorded, including the applications and documents filed with respect to the original claim, is considered to have been recorded or presented with respect to the reduced-area claim; and
(c) the recording of the original claim is cancelled.
(5) Subject to subsection (6) and section 14, the lands included in the original claim that are not included in the reduced claim are open for prospecting, and the units containing those lands are available for recording as a claim, beginning on the 31st day after the day on which the recording of the original claim is cancelled.
(6) If the Minister has reasonable grounds to believe that there is unremedied environmental damage to the lands referred to in subsection (5), the Minister may delay opening the lands for prospecting and making available the units containing those lands for recording as a claim.
(7) For one year after the recording of the original claim is cancelled under paragraph 4(c), the former lessee and any person related to the former lessee are not permitted to make an application to record a claim that includes any unit that was included in the original claim but does not form part of the reduced claim, or to acquire a legal or beneficial interest in respect of that claim.
63 (1) If rent is not paid within 30 days after the day it is due, the Mining Recorder must send the lessee a notice stating the amount of rent due and the rate of interest payable on that amount.
(2) If the rent due, together with interest from the date on which the rent was due, is not paid within 60 days after the day the notice was sent, the lease is cancelled on the 61st day after the notice was sent.
64 A lease is cancelled on the day on which an application by the lessee to cancel the lease is received by the Mining Recorder or, if a later day is set out in the application, on that day.
66 (1) The transfer of a recorded claim or a lease of a recorded claim or an interest in either of them may be recorded only if
(a) the transfer is made to a licensee;
(b) in the case of the transfer of a recorded claim or an interest in a recorded claim, an application for the transfer is made by the claim holder to the Mining Recorder; and
(c) in the case of the transfer of a lease, or an interest in a lease,
(i) an application for the recording of the transfer is made by the lessee to the Mining Recorder,
(ii) the rent and any interest on the lease is paid, and
(iii) the applicable fee set out in Schedule 1 is paid to the Mining Recorder.
(2) The transfer of a lease, or an interest in a lease, includes, as the case may be, the transfer of the recorded claim to which the lease applies or of that same interest in the recorded claim to which the lease applies.
(3) If a recorded claim or a lease of a recorded claim or an interest in either of them is part of a mining property, its transfer may be recorded only if security in the amount of any unpaid royalties in relation to the mining property has been deposited with the Minister.
67 (1) The recording of a claim, or a lease and the recorded claim to which the lease applies, are cancelled on the day on which any of the following events occurs:
(a) the Minister has realized on a charge or security on the real property of the claim holder or the lessee for the costs of remedying any environmental condition or environmental damage under subsection 11.8(8) of the Companies’ Creditors Arrangement Act or subsection 14.06(7) of the Bankruptcy and Insolvency Act;
(b) the interests in territorial lands represented by the claim or lease have reverted to the Crown as a result of a court order made under the Companies’ Creditors Arrangement Act or the Bankruptcy and Insolvency Act; or
(c) the Minister has accepted the claim or lease as a security in respect of a debt or other obligation owed to the Crown and the Minister has realized on the security under section 156 of the Financial Administration Act.
(2) Subject to subsection (3) and section 14, the lands that were covered by a claim the recording of which has been cancelled under subsection (1), or by a lease that has been cancelled under that subsection, are not open for prospecting and the units containing those lands are not available for recording as a claim until the Minister opens them for prospecting.
(3) If it is in the financial interest of the Crown or will aid in remedying environmental damage on territorial lands, the Minister may
(a) instruct the Mining Recorder to record, in the name of a specified person, a claim that covers the lands that were covered by the claim the recording of which has been cancelled; and
(b) if a lease has been cancelled, issue a lease that covers the claim recorded under paragraph (a) to the holder of the claim.
(4) When a claim is recorded under paragraph (3)(a),
(a) the recording of the claim is considered to be a transfer of the claim the recording of which has been cancelled;
(b) the recording date of the claim is considered to be the recording date of the claim the recording of which has been cancelled;
(c) the duration of the claim is extended by a period that is equivalent to the period beginning on the anniversary date of the claim that precedes the cancellation referred to in subsection (1) and ending on the anniversary date following the transfer; and
(d) for the purpose of determining any year referred to in subsections 39(1) and 40(1), any year included in the period beginning on the anniversary date of the recording of the claim that precedes the cancellation referred to in subsection (1) and ending on the anniversary date following the transfer is to be excluded.
(5) A lease issued under paragraph (3)(b) is considered to be a transfer of the cancelled lease on the same lands, with the same duration as was left on the previous lease at the time the previous lease was cancelled.
68 (1) For the purposes of these Regulations, the date on which a mine commences production is
(a) if the mine includes a mill or concentrator, the first day of the first 90-day period during which the mill or concentrator operates at an average of at least 60% of its rated capacity; or
(b) otherwise, the day the mine begins to produce minerals in reasonable commercial quantities.
(2) For the purposes of these Regulations, a mineral or processed mineral is considered to
(a) be produced and be part of the output of a mine if the mineral or processed mineral is in a saleable form or has been removed from the mine; and
(b) form part of the output of the mine if it is produced from the reprocessing of tailings from a mine.
(3) For the purposes of these Regulations,
(a) if minerals or processed minerals that have been sold by an operator to a person not related to the operator are later sold to a person related to the operator, those minerals or processed minerals are considered to have been sold by the operator to a related person; and
(b) if minerals or processed minerals that have been sold by an operator to a person related to the operator are later sold to a person not related to the operator and proof of that sale is provided, those minerals or processed minerals are considered to have been sold by the operator to a person not related to the operator.
69 (1) Each fiscal year, the owner or operator of a mine must pay to the Crown royalties on the value of the mine’s output during that fiscal year in an amount equal to the lesser of
(a) 13% of the value of the output of the mine, and
(b) the sum of the royalties payable set out in Column 2 of the table to this paragraph for the dollar value of the output set out in Column 1.
(2) The royalties payable to the Receiver General of Canada under subsection (1) in respect of a mine accrue during a fiscal year as the output of a mine is produced and must be remitted to the Chief not later than the last day of the fourth month after the end of that fiscal year.
(3) Subject to paragraph 74(1)(b), any person who was an owner or operator of a mine during the fiscal year in respect of which the royalties were payable is jointly and severally liable for the entire amount of the royalties payable in respect of the period during which that person was an owner or operator.
(4) For the purposes of this section, the value of the output of a mine for a fiscal year must be calculated in accordance with the formula
is the total of
the proceeds from sales, during the fiscal year, of minerals or processed minerals produced from the mine to persons not related to the operator, if proof of those sales is provided,
the market value of any minerals or processed minerals produced from the mine that were sold or transferred to a person related to the operator, or to any other person if the proof of that disposition is not provided, and
if the minerals or processed minerals produced from the mine are precious stones that have been cut or polished before their sale or transfer, the market value of those precious stones before they were cut or polished;
is the market value of any inventories of minerals and processed minerals produced from the mine, as at the end of the fiscal year, determined under subsection (9);
is the market value of any inventories of minerals and processed minerals produced from the mine, as at the beginning of the fiscal year, determined under subsection (9);
is the lesser of
the amount of any payment received during the fiscal year that is related to a cost that has been claimed as a deduction or allowance under this section, and
that cost;
is any excess amount referred to in paragraph 70(5)(b);
is any amount withdrawn, during the fiscal year, from a mining reclamation trust established in respect of lands to which these Regulations apply, up to the maximum of the total of the amounts contributed to the trust;
is the amount of any proceeds received, during the fiscal year, from insurance on minerals or processed minerals produced from the mine;
is the amount of any grants in respect of the mine that were made to the operator, or of any loans to the operator in respect of the mine that were forgiven, by the federal government during the fiscal year;
is the total of the deductions and allowances claimed under subsection 70(1); and
is the total of
the amount by which the sum of the amounts referred to in paragraphs 70(8)(d) and (9)(e) exceeds the undeducted balance of the depreciable assets eligible for a depreciation allowance at the end of the fiscal year, and
the amount by which the sum of the amounts referred to in paragraphs 70(9)(c) and (d) exceeds the undeducted balance of the development allowance at the end of the fiscal year.
(5) For the purpose of determining the value of A in subsection (4), if a mine is operated as a joint venture whose members deliver separate mining royalty returns under subsection 74(1),
(a) a diversion of any or all of the production of the mine from one member of the joint venture to another does not constitute a sale or transfer for the purposes of subsection 77(2), even if consideration is paid for the diversion; and
(b) any consideration paid to the member from whom the production was diverted must be included by that member as proceeds of sale of minerals or processed minerals produced from the mine.
(6) Costs related to the production of or value for minerals or processed minerals from lands other than lands to which these Regulations apply must not be taken into account for the purposes of determining the values of A to D, G and I in subsection (4).
(7) In the case of a mining royalty return for the last fiscal year of production of a mine, the operator may, for the purpose of determining the value of B in subsection (4), elect to use the actual proceeds from the sale to a party not related to the operator of minerals or processed minerals in inventory at the end of the fiscal year, if proof of that sale is provided, rather than the market value of the inventory of minerals or processed minerals at the end of that fiscal year as required under subsection (4).
(8) An election made under subsection (7) is irrevocable.
(9) If the minerals or processed minerals referred to in paragraphs (b) and (c) of the description of A, and in the descriptions of B and C, in subsection (4) are precious stones, the market value of the precious stones is as follows:
(a) if the mining royalty valuer and the operator agree on a value for the stones, that value; or
(b) if the mining royalty valuer and the operator cannot agree on a value for the stones, the maximum amount that could be realized from the sale of the stones on the open market after they are sorted into market assortments.
(10) For the purpose of subsection (9), the market value must be determined
(a) when the value is calculated for inventory purposes, at the beginning or end of the fiscal year; and
(b) when the value is calculated for any other purpose, as of the last time the precious stones were valued by the mining royalty valuer.
(11) If the minerals or processed minerals referred to in paragraphs (b) and (c) of the description of A, and in the descriptions of B and C, in subsection (4) are not precious stones, their market value is the price that could be obtained from their sale to a person who is not related to the operator.
(12) For the purpose of subsection (11), the market value must be determined
(a) when the value is calculated for inventory purposes, at the beginning or end of the fiscal year; and
(b) when the value is calculated for any other purpose, at the time the minerals or processed minerals are shipped from the mine.
(13) Gains and losses from hedging transactions must not be included in calculating the value of the mine’s output.
(14) For the purpose of these Regulations, the Bank of Canada’s exchange rate must be used to convert foreign currencies into Canadian doll