Beta
SOR-2014-68:en
SOR-2014-68:en — Northwest Territories Mining Regulations
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.
Analyze this law with AI1 (1) The following definitions apply in these Regulations.
Act means the Territorial Lands Act. (Loi)
boundary post means a legal post, excluding a corner post and a witness post, marking the boundary of a claim or a plot of land that is being staked for the purpose of making it a claim. (borne de délimitation)
business day means a day other than a Saturday or a holiday. (jour ouvrable)
Chief means the Chief of Financial Analysis and Royalties Administration Section of the Department of Indian Affairs and Northern Development. (chef)
contiguous, with reference to two or more claims, includes claims that were staked in a manner to be contiguous. (contigus)
corner post means a legal post marking the northeast, southeast, southwest or northwest corner of a claim or a plot of land that is being staked for the purpose of making it a claim. (borne d’angle)
cost of work means expenses incurred in performing work, but excludes all of the following:
(a) transportation costs outside Canada for persons who performed work or for equipment used in work;
(b) taxes and fees paid to any level of government or any institution of public government;
(c) costs of staking and recording a claim;
(d) legal fees;
(e) administrative costs. (coût des travaux)
depreciable assets means buildings, plant, machinery and equipment. (actif amortissable)
environmental baseline studies means a description of selected environmental attributes that existed before mineral exploration or mining development and that are used to establish a benchmark from which to measure changes to the environment. Selected environmental attributes include meteorologic, hydrologic and hydro-geologic attributes, surface water and groundwater quality, aquatic resources, soil profiling, ecosystems, wildlife and wildlife habitat, cultural heritage and archaeology. (études environnementales de base)
exploration cost means an expense incurred for the purpose of determining the existence, location, extent, quality or economic potential of a mineral deposit in the Northwest Territories, but does not include an expense incurred for the purpose of bringing a mine into production. (frais d’exploration)
fiscal year, in respect of a mine, means the fiscal period of the mine’s operator as that period is defined in section 249.1 of the Income Tax Act. (exercice)
holder of the surface rights means the lessee or registered holder of the surface rights to the land. (titulaire des droits de surface)
legal post means a post, tree or mound of stones set up in accordance with section 26 to serve as a boundary post, corner post or witness post. (borne légale)
licence means a licence to prospect referred to in section 3. (licence)
mine means an undertaking that produces or has produced minerals or processed minerals from lands within the Northwest Territories Mining District, and includes the depreciable assets that are located in the Northwest Territories and used in connection with the undertaking. (mine)
mineral means any naturally occurring inorganic substance found in the Northwest Territories Mining District, including frac sand, but excluding material the taking of which is regulated under the Territorial Quarrying Regulations. (minéral)
mining property means
(a) a recorded claim or a leased claim within the boundaries of which a mine or part of a mine is situated; or
(b) a group of contiguous recorded or leased claims within the boundaries of which a mine or part of a mine is situated and
(i) that belong to the same owner, or
(ii) if the mine is operated as a joint venture, that are owned exclusively by the members of the joint venture or parties related to the members of the joint venture, regardless of the degree of ownership of each recorded claim or leased claim. (propriété minière)
mining reclamation trust means a trust that is established for a mine and that is created
(a) for the purposes of subsection 72.11(1) of the Mackenzie Valley Resource Management Act; or
(b) as a condition of
(i) a lease issued under the Territorial Lands Regulations,
(ii) a contract with the Minister relating to the reclamation or environmental management of a mining property, or
(iii) a permit issued under Part 3 or 4 of the Mackenzie Valley Resource Management Act or under the Territorial Land Use Regulations. (fiducie de restauration minière)
Mining Recorder means the person designated by the Minister as the Mining Recorder. (registraire minier)
mining royalty valuer means a person acting on the Minister’s behalf for the purpose of ascertaining the value of minerals or processed minerals produced from a mine. (évaluateur des redevances minières)
owner, in respect of a recorded claim, leased claim, mine or mining property, means any person with a legal or beneficial interest in the recorded claim, leased claim, mine or mining property. (propriétaire)
precious stone means a diamond, a sapphire, an emerald or a ruby. (pierre précieuse)
prescribed form means a form prescribed by the Minister under section 28 of the Act. (formule prescrite)
processing means crushing, grinding, flotation, beneficiation, concentrating, milling, roasting, smelting, leaching, recrystallization or refining performed on minerals, and if the output of a mine is precious stones, cleaning and sorting that output. (traitement)
processing assets means tailings disposal facilities and depreciable assets that are located in the Northwest Territories and that are used directly and exclusively in processing. (biens utilisés pour le traitement)
related, in respect of two or more persons, means that the persons are
(a) related persons within the meaning of section 251 of the Income Tax Act, read without reference to paragraph 251(5)(b) of that Act;
(b) associated corporations within the meaning of section 256 of the Income Tax Act, read without reference to subsection 256(1.4) of that Act;
(c) affiliated persons within the meaning of section 251.1 of the Income Tax Act; or
(d) other than for the purpose of subsection 74(1), owners or operators of the same mine. (liées)
Supervising Mining Recorder means the person designated by the Minister as the Supervising Mining Recorder. (registraire minier en chef)
undeducted balance means
(a) in respect of a depreciation allowance, the original cost of the depreciable assets in respect of which the depreciation allowance is claimed, less any depreciation allowances previously claimed in respect of those assets;
(b) in respect of a development allowance, the undeducted balance of costs eligible for a development allowance under paragraph 70(1)(i); and
(c) in respect of a mining reclamation trust contribution allowance, the total of all contributions made to the mining reclamation trust, less any allowances previously claimed. (fraction non amortie)
witness post means a legal post set up in accordance with section 29 to provide reference to the corner of a claim or a plot of land that is being staked for the purpose of making it a claim. (borne témoin)
work means
(a) any of the following undertakings that are performed in respect of a recorded claim — including, for the purposes of subsection 39(2), before the recorded claim existed — or within the zone of a prospecting permit, for the purpose of assessing its mineral potential:
(i) examination of outcrops and surficial deposits,
(ii) excavation,
(iii) sampling,
(iv) geochemical study or analysis,
(v) drilling,
(vi) geological mapping,
(vii) geophysical study or analysis,
(viii) remote sensing, if one or more undertakings set out in subparagraphs (i) to (vii) have been performed to evaluate the results of the remote sensing and are reported on, together with the remote sensing, in accordance with subsection 15(2) or 41(1),
(ix) the placing of grid lines in the field for the purpose of performing any of the undertakings referred to in subparagraphs (i) to (vii),
(x) petrography,
(xi) data analysis, map generation and preparation of reports that are submitted under these Regulations in respect of undertakings referred to in subparagraphs (i) to (viii) and (x);
(b) any of the following undertakings that are performed in respect of a recorded claim:
(i) the preparation of a plan of survey under paragraph 57(1)(a),
(ii) the building of roads, airstrips or docks for the purpose of performing any of the undertakings referred to in paragraph (a); and
(c) environmental baseline studies that are conducted in conjunction with undertakings referred to in subparagraphs (a)(i) to (vii) and (ix) or subparagraph (b)(ii), as well as analysis of the data resulting from the studies, map generation and the preparation of an appendix as required in paragraph 4(t) of Schedule 2. (travaux)
(2) For the purposes of these Regulations, a person who is related to another person is considered to be also related to any person to whom the other person is related.
2 These Regulations apply in respect of the Northwest Territories Mining District, the area of which is described in Schedule 1 to the Northwest Territories Mining District and Nunavut Mining District Order.
3 (1) The Mining Recorder must issue a licence to prospect to a person who has applied for one and paid the applicable fee set out in Schedule 1 if the person is
(a) an individual who is 18 years of age or older; or
(b) a company that is incorporated or registered under the Business Corporations Act, S.N.W.T. 1996, c. 19, or that is incorporated under the Canada Business Corporations Act.
(2) A licence is not transferable.
(3) A licence is valid from the date of its issue until March 31 following the date of its issue or, if renewed before March 31, for a period of one year beginning on April 1 following the date of its renewal.
(4) A licensee may, on request and payment of the applicable fee set out in Schedule 1, obtain from the Mining Recorder a copy of their licence.
4 (1) Only a licensee or a person authorized to act on behalf of a licensee may
(a) prospect for the purpose of staking a claim; or
(b) undertake the staking of a claim.
(2) Only a licensee may
(a) make an application to record a claim;
(b) make an application for a prospecting permit;
(c) be issued a written confirmation under subsection 15(11), a certificate of extension under subsection 42(2) or a certificate of work under subsection 47(1);
(d) be issued a lease of a recorded claim or a renewal of such a lease; and
(e) acquire, by themself or with another licensee, a prospecting permit, recorded claim or lease of a recorded claim.
5 It is prohibited to prospect or stake a claim on any of the following lands:
(a) lands used as a cemetery;
(b) lands covered by a prospecting permit, a recorded claim or a lease of a recorded claim, unless the prospecting or staking is done by the permittee, claim holder or lessee;
(c) lands for which the minerals have been granted by the Crown;
(d) lands subject to a prohibition on prospecting or staking a claim under a land use plan that has been approved under federal legislation or under a land claims agreement;
(e) lands that have been withdrawn from disposal or set apart and appropriated by the Governor in Council under paragraphs 23(a) to (e) of the Act;
(f) lands that are mentioned in subsections 22(1) and 52(5), section 56, subsection 67(2) and section 85 that are not open for prospecting or staking.
6 If the surface rights to lands have been granted or leased by the Crown, it is prohibited to go on the surface of those lands to prospect or stake a claim unless
(a) the holder of the surface rights has consented to entry for the prospecting or staking; or
(b) a tribunal competent to deal with surface rights in the Northwest Territories has made an order that authorizes entry on those lands and that sets the compensation, if any, to the surface holder.
7 (1) It is prohibited to remove minerals or processed minerals from, or develop a mine within, the area of a recorded claim or a leased claim, except in the case of the holder of the recorded claim or the lessee.
(2) It is prohibited to remove minerals or processed minerals whose gross value exceeds $100,000 from a recorded claim that is not subject to a lease issued under subsection 60(5) or a renewal issued under subsection 62(4), except if the removal is for the purposes of assay and testing to determine the existence, location, extent, quality or economic potential of a mineral deposit within the claim.
(3) It is prohibited to erect on a recorded claim any building to be used as a dwelling or any mill, concentrator or other mine building, or to create any tailings or waste disposal area for the purpose of the commencement of production from a mine, unless the claim holder has been issued a lease of the surface rights to, or a grant of, the land covered by the claim.
8 (1) The mining district is divided into prospecting permit zones based on the National Topographic System of Canada. Each zone consists of one quarter of the area shown on a claim staking sheet and is designated as the northeast, southeast, southwest or northwest quarter.
(2) In this section, claim staking sheet means
(a) south of 68° north latitude, a map of zones bounded on the north and south by 15-minute intervals of latitude and on the east and west by 30-minute intervals of longitude; and
(b) north of 68° north latitude, a map of zones bounded on the north and south by 15-minute intervals of latitude and on the east and west by one-degree intervals of longitude.
9 (1) A licensee may apply to the Mining Recorder for a prospecting permit for the exclusive right to prospect and stake claims in a prospecting permit zone specified in the application.
(2) An application for a prospecting permit must
(a) be in the prescribed form;
(b) be received by the Mining Recorder between February 1 and close of business on the last business day of November before the year in which it is to commence;
(c) be accompanied by payment of the applicable fee set out in Schedule 1; and
(d) include a description of the work proposed to be carried out.
(3) In addition, the licensee must pay to the Mining Recorder the charge referred to in subparagraph 14(a)(i) or (b)(i), as the case may be.
(4) If a charge has been paid under subsection (3) but no prospecting permit is issued with respect to the application, the charge is remitted.
(5) Any charge referred to in subparagraph 14(a)(i) or (b)(i) that has been paid to the Mining Recorder and that is remitted under this section must be repaid by the Minister to the person entitled to it.
10 A prospecting permit must not be issued in respect of a prospecting permit zone if, at close of business on the last business day of January in the year the permit is to be issued, either of the following situations exists:
(a) there are recorded claims or leased claims or applications to record claims in that zone and the total area covered by those claims exceeds 1250 hectares;
(b) there are recorded claims or leased claims in that zone and the total area covered by those claims is 1250 hectares or less and, in the five years preceding that day, either of the following has happened with respect to any of those recorded claims or leased claims:
(i) work has been done with respect to any of the recorded claims and has been reported on under section 41 of these Regulations or under section 41 of the Northwest Territories and Nunavut Mining Regulations,
(ii) there has been a transfer recorded under section 66 of a majority of the interest in the recorded claim or lease to a person who was not, immediately before the transfer, recorded as a holder of the claim or lease and who is not related to anyone who was, immediately before the transfer, a holder of the claim or lease.
11 (1) If two or more applications for a prospecting permit are made in respect of a prospecting permit zone, the Mining Recorder must, in issuing a prospecting permit, give priority to
(a) firstly, applications presented in person at the office of the Mining Recorder on the first business day of November, in the order of their receipt;
(b) secondly, applications — other than those dealt with in paragraph (a) — received by the Mining Recorder before the second business day of November, in the order of their drawing from a lottery of those applications; and
(c) lastly, all other applications received after the first business day of November, in the order of their receipt by the Mining Recorder, or, if the order of receipt of applications cannot be determined, then in the order of their drawing from a lottery of those applications.
(2) The Mining Recorder must issue the prospecting permit as soon as possible after January 31 in the year following the receipt of the application.
(3) The Mining Recorder must assign an identification number to each prospecting permit.
(4) The area covered by a prospecting permit must be modified by removing the area covered by a recorded claim within that zone if
(a) the claim was staked within the zone before the permit was issued; and
(b) the application to record the claim was made after the permit was issued.
12 A prospecting permit takes effect on the first day of February in the year it is issued and expires at the end of January
(a) three years later, in the case of a permit in respect of a zone located south of 68° north latitude; or
(b) five years later, in the case of a permit in respect of a zone located north of 68° north latitude.
13 On or before the fifth business day in February, a notice must be posted in the Mining Recorder’s office identifying the zones in respect of which prospecting permits were issued that year in the mining district.
14 The following charges must be paid for a prospecting permit:
(a) for a prospecting permit zone located south of 68° north latitude,
(i) before the close of business on the last business day of November in the year in which the application for the permit is made, an amount equal to the number of hectares in the permit zone multiplied by $0.25,
(ii) before the start of the second year of the permit, an amount equal to the number of hectares in the permit zone multiplied by $0.50, and
(iii) before the start of the third year of the permit, an amount equal to the number of hectares in the permit zone multiplied by $1.00; and
(b) for a prospecting permit zone north of 68° north latitude,
(i) before the close of business on the last business day of November of the year in which the application for the permit is made, an amount equal to the number of hectares in the permit zone multiplied by $0.25,
(ii) before the start of the third year of the permit, an amount equal to the number of hectares in the permit zone multiplied by $0.50, and
(iii) before the start of the fifth year of the permit, an amount equal to the number of hectares in the permit zone multiplied by $1.00.
15 (1) A permittee who has done work in respect of a zone for which they have a prospecting permit may request remission of the charges the permittee has paid or is obligated to pay for that permit under section 14 by submitting a report on the work to the Mining Recorder no later than 60 days after the expiry of the permit.
(2) The report must be prepared in accordance with Part 1 of Schedule 2, but if the report deals only with excavation, sampling or the examination of outcrops and surficial deposits — or any combination of them — and the cost of work is less than $10,000, the report may be a simplified report prepared in accordance with Part 2 of Schedule 2.
(3) The report must be prepared and signed
(a) in the case of a simplified report, by the individual who performed or supervised the work; or
(b) in all other cases, by a professional geoscientist or a professional engineer as those terms are defined in subsection 1(1) of the Engineering and Geoscience Professions Act, S.N.W.T. 2006, c. 16.
(4) The following must be submitted with the report:
(a) a statement of work in the prescribed form;
(b) a table setting out the cost of work by type of work, together with, for each type of work, details of the costs sufficient to enable evaluation of the report in accordance with subsection (8); and
(c) a table setting out the cost of work that is attributable to each permit.
(5) In respect of the details of the costs,
(a) if a permittee uses their own equipment to perform work, the cost claimed in relation to that equipment must not be more than the cost of leasing similar equipment for the period that the equipment was used in performing the work; and
(b) if a permittee personally performs work, the cost claimed in relation to that work must not be more than an amount equal to the cost of engaging another person to do that work.
(6) The permittee must keep all supporting documents used to justify the cost of work and make them available on request by the Mining Recorder until the permittee has received a confirmation under subsection (11).
(7) Work reported in one report must not be reported in any other report.
(8) The Mining Recorder must evaluate the report to determine its compliance with Schedule 2 and the cost of work to be entered in a written confirmation of the cost of work under subsection (11).
(9) If the Mining Recorder requests supporting documents that justify the cost of work reported, the Mining Recorder must notify the permittee in writing and must specify the cost of work for which such documents are requested.
(10) If the permittee does not, within four months after the day the notification is sent, provide the supporting documents requested, the cost of work to which they relate must be considered to be unjustified.
(11) After completing the evaluation of a report, the Mining Recorder must provide to the permittee a written confirmation of the cost of work that has been justified in the report and, if a request for allocation of the cost has been made under subsection 17(5), of the amounts allocated in accordance with the request.
16 (1) If a permittee is unable to do work with respect to a prospecting permit zone because the permittee is, for reasons beyond the permittee’s control, waiting for a public authority to give an authorization or decision without which the work cannot proceed, the permittee may request an extension of one year for the payment of the charge under section 14 and the duration of the permit.
(2) The request must be made in writing to the Supervising Mining Recorder before the next charge under section 14 is payable and must be accompanied by documents showing that the permittee is waiting for the authorization or decision.
(3) If the requirements of subsection (2) have been met, the Supervising Mining Recorder must record the extension.
17 (1) Prospecting permits may be grouped for the purpose of allocating the cost of work done with respect to them if
(a) there are no more than four permits in the group; and
(b) the zones of the grouped permits are wholly or partly within a circle having a radius of 32 kilometres.
(2) A request to group prospecting permits must be submitted in writing to the Mining Recorder. It must be signed by each of the permittees and be accompanied by the applicable fee set out in Schedule 1.
(3) If the requirements of subsections (1) and (2) are met, the Mining Recorder must issue a grouping certificate to each of the permittees.
(4) A grouping certificate takes effect on the day on which the fee is submitted under subsection (2) and ceases to have effect on the earlier of
(a) the 120th day after the day that any permit in the group expires or is cancelled, and
(b) the day on which a new grouping certificate in respect of any permit in the group takes effect.
(5) On request by any of the permittees referred to in a grouping certificate, the Mining Recorder must allocate, in accordance with the request, the cost of work that has been justified in a report in respect of any of the prospecting permits referred to in the grouping certificate to those permits.
(6) The cost of work allocated under subsection (5) must not be reallocated to any prospecting permit referred to in another grouping certificate.
(7) The cost of work set out in a confirmation under subsection 15(11) with respect to a prospecting permit that was not, when the confirmation was provided, referred to in a grouping certificate must not be allocated to any other prospecting permit.
18 (1) A permittee may apply to record a claim wholly or partially within the permittee’s prospecting permit zone only if a confirmation under subsection 15(11) respecting that zone has been provided setting out a cost of work equal to or greater than the number of hectares in the permit zone multiplied by $0.25.
(2) When a claim referred to in subsection (1) has been recorded, the area covered by the claim no longer forms part of the permit zone.
(3) If the cost of work that has been justified in a report with respect to a prospecting permit exceeds the charges remitted under subsection 19(2), the permittee may request the Mining Recorder to allocate the excess cost of work to work required under subsection 39(1) on a claim referred to in subsection (1). The request must be in the prescribed form and be accompanied by the fee for a certificate of work set out in Schedule 1.
19 (1) If a confirmation in respect of a prospecting permit is provided under subsection 15(11), the portion of the charges paid or payable under section 14 that does not exceed the cost of work set out in the confirmation is remitted.
(2) Any charge referred to under section 14 that has been paid to the Mining Recorder and that is remitted under this section must be repaid by the Minister to the person entitled to it.
20 A permittee may submit to the Mining Recorder a written request for cancellation of their prospecting permit. The cancellation takes effect at the end of January after it is requested.
21 If any charge payable under section 14 is not paid when due, the prospecting permit is cancelled.
22 (1) The lands that were covered by a prospecting permit that has expired or has been cancelled are open for prospecting and staking at noon on the day following the first business day after the day on which the permit expired or was cancelled.
(2) For one year after a prospecting permit expires or is cancelled, the former permittee and any person related to the former permittee are not permitted to
(a) apply for a prospecting permit for a zone, or apply to record a claim, that covers any part of the area that was covered by the expired or cancelled permit; or
(b) acquire a legal or beneficial interest in a prospecting permit or claim referred to in paragraph (a).
23 (1) The area of a claim must not exceed 1250 hectares and must not include any lands referred to in section 5.
(2) Every claim must, as nearly as possible, meet all of the following specifications:
(a) it is rectangular in shape;
(b) its boundaries run north, south, east and west astronomically;
(c) the length of each boundary is 500 metres or a multiple of 500 metres;
(d) the length of the longest boundary is not more than five times the length of the shortest.
24 (1) On payment of the applicable fee set out in Schedule 1, the Mining Recorder must issue a set of four identification tags, with the following inscriptions, for use in identifying the corners of a claim — “NE 1” for the northeast corner, “SE 2” for the southeast corner, “SW 3” for the southwest corner and “NW 4” for the northwest corner.
(2) On payment of the applicable fee set out in Schedule 1, the Mining Recorder must issue a set of four reduced-area tags for use in marking the corners of a reduced-area claim referred to in section 52.
(3) Each identification tag in a set must contain a unique identification number for the set.
25 (1) The boundaries and corners of a claim must be marked by legal posts in accordance with sections 26 to 30.
(2) In a treed area, the boundaries of a claim must be marked along as much of the length as it is possible to mark by cutting underbrush and flagging or blazing trees.
26 (1) A legal post must be one of the following:
(a) in a treed area,
(i) a post of sound wood planted firmly in an upright position and standing not less than one metre above the ground, with at least the upper 30 centimetres squared off so that each face of the squared portion is not less than four centimetres in width, or
(ii) a tree found in position and cut off not less than one metre above the ground, with at least the upper 30 centimetres squared off so that each face of the squared portion is not less than four centimetres in width;
(b) in a treeless area, a post described in subparagraph (a)(i) or a mound of stones that is not less than one metre in diameter at the base and not less than 50 centimetres in height.
(2) If a legal post is a mound of stones, then
(a) a reference to a tag being secured to that post is to be read as a reference to a tag being inserted in a shatterproof and waterproof container secured in the apex of the mound; and
(b) a reference to information being inscribed on that post is to be read as a reference to information being clearly and indelibly written on paper or inscribed on durable material and inserted in a shatterproof and waterproof container secured in the apex of the mound.
27 (1) Subject to subsection (2), boundary posts must be erected at intervals of not more than 500 metres along the boundaries of a claim.
(2) If, because of the presence of a body of water or other natural obstruction or lands on which entry for staking has not been authorized by the holder of the surface rights, it is not practicable to erect a boundary post on the boundary line of the claim, a boundary post must be erected on the boundary line on each side of the body of water or natural obstruction or lands.
(3) When two or more claims are staked at the same time by or on behalf of the same licensee and have a common boundary, a single boundary post may be erected to mark any common interval along the boundary.
(4) Boundary posts must be numbered consecutively in a clockwise direction, commencing at “1” after the northeast corner post, and recommencing at “1” after each subsequent corner post.
(5) The name of the claim, the number referred to in subsection (4) and the following information must be inscribed on each boundary post:
(a) on the northern boundary, the letters “NBP” or “BLN”;
(b) on the eastern boundary, the letters “EBP” or “BLE”;
(c) on the southern boundary, the letters “SBP” or “BLS”; and
(d) on the western boundary, the letters “WBP” or “BLO”.
28 (1) Subject to section 29, corner posts must be erected at the four corners of a claim, and an identification tag marked with the required inscription must be secured to each corner post.
(2) When two or more claims are staked at the same time by or on behalf of the same licensee and have a common corner, a single corner post may be used to mark the common corner. The identification tag for each claim, marked with the required inscription, must be secured to the common corner post.
(3) The following information is to be clearly and indelibly inscribed on the identification tag of each corner post or, if there is insufficient room on the tag, on the post itself:
(a) the name of the licensee for whom the claim is staked;
(b) the name of the person who erected that post, if that person is not the licensee;
(c) the name of the claim; and
(d) the date and time that the post was erected.
29 (1) If, because of the presence of a body of water or other natural obstruction or lands on which entry for staking has not been authorized by the holder of the surface rights, it is not practicable to erect a corner post, a witness post must be erected at one of the following locations:
(a) on a boundary or an extension of a boundary of the claim and as near as practicable to the corner;
(b) if it is not practicable to erect it at a location specified in paragraph (a), at a location as near as practicable to the corner.
(2) The identification tag for the corner post must be attached to the witness post.
(3) In addition to the information referred to in subsection 28(3), the following information must be inscribed on the identification tag after the letters “WP”: the compass bearing and distance in metres, measured in a straight line, from the witness post to the location where the corner post would have been erected had it been practicable to do so.
30 When the boundaries and corners of a claim have been marked in accordance with sections 23 to 29, the date and time of completion of the requirements of those sections and the licence number of the licensee referred to in paragraph 28(3)(a) must be inscribed on the identification tag of the northeast corner post or of the witness post designating the northeast corner, as the case may be. The claim is then staked.
31 Compliance with the requirements set out in sections 23 to 30 may be verified by a person authorized by the Minister to perform any function related to the administration and enforcement of these Regulations.
32 (1) Except as provided in subsections (2) and (3), it is prohibited
(a) to remove, displace or destroy a legal post; and
(b) to remove, deface or alter an identification tag secured to a legal post or an inscription on a legal post.
(2) The claim holder, the holder of the surface rights or a public authority may remove a legal post if the post is interfering with their use of the lands.
(3) If the holder of the surface rights or a public authority removes a legal post, they must, within 30 days after the removal, notify the claim holder and the Mining Recorder of the removal.
33 (1) Only the licensee for whom a claim has been staked may submit an application to the Mining Recorder to record the claim.
(2) The application must be made in the prescribed form within 60 days after the date on which the staking of the claim is completed.
(3) The application must be accompanied by the applicable fee set out in Schedule 1 and a map or sketch at the scale of 1:50 000 showing all of the following:
(a) the location of the claim in relation to permanent topographical features in the vicinity of the claim;
(b) any nearby prospecting permit zones, recorded claims and leased claims;
(c) the positions of the corner posts;
(d) the positions and numbers of the boundary posts;
(e) the positions of any witness posts.
(4) If the requirements of subsections (1) to (3) are met, the Mining Recorder must record the claim as soon as practicable after the 60th day following the day on which the staking is completed. The recording date is considered to be the date that the application is received at the Mining Recorder’s office.
(5) Unless a recorded claim is leased under subsection 60(5) or its recording is cancelled under subsection 50(2) or 53(3) or section 54 or 55, the duration of a recorded claim is 10 years, beginning on its recording date, plus any suspensions recorded under section 51 and any extension under subsection 60(4).
34 If applications have been submitted to record two or more claims that overlap, the claim that is staked first in compliance with the staking requirements is the one that must be recorded.
35 (1) If it is determined that lands covered by a mining claim that is recorded or otherwise recognized under the law regulating the disposition of mining interests in another province are wholly or partly in the Northwest Territories Mining District, and if the portion in the Northwest Territories does not contain lands referred to in section 5, the claim holder may, within 90 days after the determination, apply to the Mining Recorder to have the portion of the claim within the Northwest Territories recorded as a separate claim.
(2) If an application to record the claim is not made within the period set out in subsection (1), the lands that were covered by the claim and that are within the Northwest Territories are considered to never have been covered by a claim.
(3) On receipt of an application made under subsection (1) and the applicable fee set out in Schedule 1, the Mining Recorder must record the claim as soon as practicable, using the date and time when the claim was recorded or otherwise recognized under the law regulating the disposition of mining interests in the other province.
36 If a plan of survey recorded under section 59 and prepared with respect to a recorded claim shows that part of the claim is in another province, the Mining Recorder must reduce the boundaries of the claim in accordance with the plan, and must, as soon as practicable, notify the claim holder of the reduction.
37 (1) If a person wants to dispute the recording of a claim, they must
(a) within one year after the day the disputed claim was recorded, file with the Supervising Mining Recorder a notice of protest in the prescribed form; and
(b) attest that they believe that they have, before the staking of the disputed claim, staked a claim on all or part of the area covered by the disputed claim.
(2) When the recording of a claim is disputed, the recording of the area of the claim in dispute must be accorded to the person who first staked the claim in accordance with these Regulations.
38 (1) When a notice of protest is filed, the Supervising Mining Recorder must
(a) send a copy of the notice by registered mail to the holder of the disputed claim; and
(b) inquire into the allegations contained in the notice of protest.
(2) For the purposes of the inquiry, the Supervising Mining Recorder may
(a) summon and examine under oath any person whose attendance is considered necessary to the inquiry;
(b) compel the production of documents by witnesses; and
(c) do all things necessary to provide a full and proper inquiry.
(3) After making the inquiry, the Supervising Mining Recorder must determine which claim was staked first and must provide the parties and the Mining Recorder with written reasons for the determination.
39 (1) The holder of a recorded claim must do work that incurs a cost of work that is equal to or greater than
(a) $10 per full or partial hectare in the claim during the two-year period following the day on which the claim is recorded; and
(b) $5 per full or partial hectare in the claim during each subsequent one-year period.
(2) Work that was done during the two years before the claim was recorded is considered to be work done on the claim during the period referred to in paragraph (1)(a).
40 The claim holder must, no later than 90 days after the end of the period during which the work referred to in subsection 39(1) must be done, submit to the Mining Recorder
(a) a report of the work that has been done in respect of the claim; or
(b) an application for a one-year extension to do the work.
41 (1) A report of the work that has been done in respect of a claim must be prepared in accordance with Part 1 of Schedule 2, but if the report deals only with excavation, sampling or the examination of outcrops and surficial deposits — or any combination of them — and the cost of work is less than $10,000, the report may be a simplified report prepared in accordance with Part 2 of Schedule 2.
(2) The report must be prepared and signed
(a) in the case of a simplified report, by the individual who performed or supervised the work; or
(b) in all other cases, by a professional geoscientist or a professional engineer as those terms are defined in subsection 1(1) of the Engineering and Geoscience Professions Act, S.N.W.T. 2006, c. 16.
(3) The report must be accompanied by the fee for a certificate of work set out in Schedule 1 and the following documents:
(a) a statement of work in the prescribed form;
(b) a table setting out the cost of work by type of work, together with, for each type of work, details of the costs sufficient to enable evaluation of the report in accordance with subsection 44(1); and
(c) a table setting out the cost of work that is attributable to each claim.
(4) If a holder of a recorded claim uses their own equipment to perform work or personally performs work,
(a) the cost claimed in relation to that equipment must not be more than the cost of leasing similar equipment for the period that the equipment is used in performing the work; and
(b) the cost claimed in relation to that work must not be more than an amount equal to the cost of engaging another person to do that work.
(5) The holder of a recorded claim must keep all supporting documents used to justify the cost of work and make them available on request by the Mining Recorder until the holder has received a certificate of work under paragraph 47(1)(a).
(6) Work reported in one report must not be reported in any other report.
42 (1) The application for a one-year extension referred to in paragraph 40(b) must be in the prescribed form and be accompanied by the applicable fee set out in Schedule 1 and the charge payable for that period under subsection 43(1).
(2) If the requirements of subsection (1) are met, the Mining Recorder must issue to the claim holder a certificate of extension for a one-year period to do the work, except that not more than three certificates of extension are to be issued with respect to a claim.
43 (1) The following charges apply to the right to hold a recorded claim and assess its mineral potential:
(a) $10 per full or partial hectare in the claim during the two-year period following the day on which the claim is recorded; and
(b) $5 per full or partial hectare in the claim for each subsequent one-year period.
(2) The claim holder must pay the charges in accordance with subsection 42(1) or 49(1), as the case may be.
44 (1) The Mining Recorder must evaluate the report of work that is referred to in paragraph 40(a) to determine its compliance with Schedule 2 and the cost of work to be entered in a certificate of work under subsection 47(2).
(2) If the Mining Recorder requests supporting documents that justify the cost of work reported, the Mining Recorder must notify the holder of the recorded claim in writing and must specify the cost of work for which the documents are requested.
(3) If the holder of the recorded claim does not, within four months after the day the notification is sent, provide the supporting documents requested, the cost of work to which they relate must be considered to be unjustified.
45 (1) Subject to subsection (2), if a recorded claim is not grouped under section 46 and the cost of work that has been justified in a report in respect of that claim exceeds the cost of work required to be done on it under subsection 39(1) at the time the certificate of work respecting the report is ready to be issued, the Mining Recorder must allocate the excess cost of work to the next period or periods for which work is still required to be done on the claim under subsection 39(1).
(2) At any time before the evaluation of the report has been completed, the claim holder may submit a written request to the Mining Recorder to not allocate the excess cost of work or to allocate it to fewer periods than would be required under subsection (1) and the Mining Recorder must comply with the request.
(3) A claim holder who has paid a charge in respect of a period under subsection 43(1) or 49(1) may submit a written request to the Mining Recorder that remission be granted of the charge in an amount equal to the excess cost of work.
(4) If an unallocated excess cost of work is recorded with respect to a recorded claim, the claim holder may submit a request to the Mining Recorder to allocate that cost as specified in the request. The request must be in the prescribed form and be accompanied by the fee for a certificate of work set out in Schedule 1.
(5) If the unallocated excess cost of work is sufficient to comply with the request, the Mining Recorder must allocate it in accordance with the request.
46 (1) Recorded claims may be grouped for the purpose of allocating the cost of work done with respect to them if
(a) the claims are contiguous;
(b) the total area of the group does not exceed 5000 hectares; and
(c) none of the claims is leased.
(2) A request to group recorded claims must be submitted in the prescribed form to the Mining Recorder. It must be signed by each of the claim holders and be accompanied by the applicable fee set out in Schedule 1.
(3) If the requirements of subsections (1) and (2) are met, the Mining Recorder must issue a grouping certificate respecting the claims to each of the claim holders.
(4) A grouping certificate takes effect on the day on which the fee under subsection (2) is received and ceases to have effect on the earliest of
(a) the day on which the recording of any claim in the group is cancelled,
(b) the day on which a lease of any claim in the group takes effect, and
(c) the day on which a new grouping certificate in respect of any claim in the group takes effect.
(5) On request by a holder of a recorded claim listed in a grouping certificate, the Mining Recorder must allocate, in accordance with the request, the cost of work that has been justified in a report in respect of any of the claims listed in the grouping certificate to any of the other claims listed in the certificate, for any of the periods referred to in subsection 39(1).
(6) A request must be in the prescribed form and, if it is not submitted with the report referred to in section 41, it must be accompanied by the fee for a certificate of work set out in Schedule 1.
(7) The cost of work allocated to a recorded claim referred to in a grouping certificate must not be reallocated to any recorded claim referred to in another grouping certificate.
47 (1) The Mining Recorder must issue a certificate of work in the following circumstances:
(a) when evaluation of a report respecting a recorded claim has been completed; and
(b) when allocation of the cost of work under subsection 18(3), 45(1), (2) or (4) or 46(5) has been done.
(2) A certificate of work respecting a claim must set out
(a) the cost of work; and
(b) the allocation of the cost of work.
48 (1) Remission is granted of the charges paid or payable in respect of a period referred to in section 43 in an amount equal to the cost of work allocated to the recorded claim during that period in the certificate of work.
(2) If a holder of a recorded claim pays a charge in respect of a period under subsection 43(1) or 49(1), remission is granted of the portion of the charge that is equal to the cost of work allocated to the claim during any subsequent period that exceeds the cost of work required to be done under subsection 39(1).
(3) Any charge referred to in section 43 that has been paid to the Mining Recorder and that is remitted under this section must be repaid by the Minister to the person entitled to it.
49 (1) Subject to subsection (3), if a certificate of work indicates that the cost of work is less than the amount required by subsection 39(1), the holder of the recorded claim must pay a charge that is equal to the difference between the charge referred to in subsection 43(1) and the cost of work indicated in the certificate.
(2) The claim holder must pay the charge within 60 days after the day on which the certificate is issued.
(3) If three certificates of work are issued in respect of a claim that indicate that the cost of work is less than the amount required by subsection 39(1), the recording of the claim is cancelled on the day that the third certificate of work is issued.
50 (1) The requirements set out in section 39 and subsection 43(1) apply for the duration of a recorded claim.
(2) The recording of a claim is cancelled on one of the following days, as the case may be:
(a) the day after the last day on which a report must be submitted under section 40, if a report with respect to that claim has not been submitted in accordance with section 41 and
(i) the claim holder has not been issued a certificate of extension with respect to that claim under section 42, and
(ii) a suspension with respect to that claim has not been granted under section 51;
(b) subject to section 84, the day that is 61 days after the day on which a certificate of work with respect to that claim is issued under section 47, if the cost of work allocated to that claim in the certificate of work is less than the cost of work required to be done under subsection 39(1) and the claim holder has not paid the difference between the charge referred to in subsection 43(1) and the cost of work indicated in the certificate.
51 (1) If a holder of a recorded claim is unable to do work as required under subsection 39(1) because the claim holder is, for reasons beyond the claim holder’s control, waiting for a public authority to give an authorization or decision without which the work cannot proceed, the claim holder may request a suspension of one year — beginning on the anniversary date of the recording of the claim — of the work requirements under section 39 and the charges under subsection 43(1).
(2) The request must be made in writing to the Supervising Mining Recorder no later than 90 days after the end of the applicable period under section 39 and subsection 43(1) for which the suspension is requested, and must be accompanied by documents showing that the claim holder is waiting for the authorization or decision.
(3) If an order under section 11.02 of the Companies’ Creditors Arrangement Act has been made with respect to a claim holder, the holder of a recorded claim may request a suspension of the payment and work requirements under section 39 and subsection 43(1) until the anniversary date of the recording of the claim that is at least 12 months after the day on which the order has ceased to have effect with respect to the claim holder.
(4) The request must be made in writing to the Supervising Mining Recorder no later than 90 days after the day on which the order was made, and must be accompanied by a certified copy of the order.
(5) If the requirements of subsections (1) and (2) or (3) and (4) are met, the Supervising Mining Recorder must record the suspension with respect to the claim.
(6) A suspension extends the duration of the claim by the duration of the suspension.
52 (1) The holder of a recorded claim (the original claim) may make an application to the Mining Recorder to record, within the area of the original claim, a reduced-area claim if
(a) the cost of work set out in a certificate of work with respect to the original claim is at least $10 per full or partial hectare; and
(b) the reduced-area claim has been staked in accordance with sections 23 to 30, using reduced-area tags issued under subsection 24(2).
(2) The application must be made in the prescribed form no later than 60 days after the staking of the reduced-area claim, and must be accompanied by the applicable fee set out in Schedule 1 and the map or sketch referred to in subsection 33(3).
(3) If the requirements set out in this section are met, the Mining Recorder must record the reduced-area claim, effective on the next anniversary date of the recording of the original claim.
(4) When the recording of a reduced-area claim takes effect,
(a) the recording date for it is considered to be the recording date of the original claim;
(b) the information recorded by the Mining Recorder, including the requests and the documents filed with respect to the original claim, are considered to have been recorded or presented with respect to the reduced-area claim; and
(c) the recording of the original claim is cancelled.
(5) Subject to subsection 56(3), the lands in the original claim that are not within the reduced-area claim are open for prospecting and staking at noon on the day following the first business day after the day on which the recording of the original claim was cancelled.
(6) On the day the recording of the reduced-area claim takes effect — or if that day is not a business day, on the first business day that follows — the Mining Recorder must post a notice in the Mining Recorder’s office specifying when the lands in the original claim that are not within the reduced-area claim are open for prospecting and staking, and setting out the boundaries of the reduced-area claim.
53 (1) If the Mining Recorder has information that either of the following circumstances apply in respect of a recorded claim, the Mining Recorder must immediately send the claim holder a notice that the recording of the claim will be cancelled unless, within 60 days, the holder can show that the information is not correct:
(a) the claim holder knowingly made a false or misleading statement on the application to record the claim;
(b) the claim holder has contravened subsection 7(2).
(2) The notice must set out the reason for the impending cancellation and a summary of the evidence to support the cancellation.
(3) If the claim holder has not shown the Mining Recorder that the information is not correct within 60 days after the day on which the notice was sent, the recording of the claim is cancelled.
(4) If it is determined that a recorded claim includes any of the following lands, the Mining Recorder must cancel the recording of the claim or, if it is possible to exclude those lands from the claim, must amend the boundaries of the recorded claim to do so and must notify the claim holder accordingly:
(a) lands referred to in section 5;
(b) lands that were staked in contravention of section 6;
(c) lands to which these Regulations do not apply.
54 The holder of a recorded claim may request the cancellation of the recording of the claim by submitting to the Mining Recorder a written request for cancellation accompanied by the applicable fee set out in Schedule 1.
55 (1) The recording of a claim is cancelled on the day that
(a) the Mining Recorder receives the request for its cancellation and payment of the fee under section 54;
(b) the time specified in paragraph 60(2)(b) has ended and no application for a lease on the claim has been received; or
(c) a lease on the claim has terminated without being renewed or was cancelled under subsection 63(2) or section 64.
(2) For one year after the recording of a claim is cancelled, the former claim holder and any person related to the former claim holder are not permitted to
(a) apply for a prospecting permit for a zone, or apply to record a claim, that covers any part of the area that was covered by the claim the recording of which has been cancelled; or
(b) acquire a legal or beneficial interest in a prospecting permit or claim referred to in paragraph (a).
56 (1) The lands that were covered by a claim the recording of which has been cancelled under subsection 50(2), section 55 or subsection 62(3) are open for prospecting and staking at noon on the day following the first business day after the day on which the recording of the claim was cancelled.
(2) Subject to section 84, the lands that were covered by a claim the recording of which has been cancelled under subsection 49(3) or 53(3) or paragraph 53(4)(b) are open for prospecting and staking at noon on the day that is 30 days after the day on which the recording of the claim was cancelled.
(3) If the Minister has reasonable grounds to believe that there is unremedied environmental damage to the lands that were covered by a claim the recording of which has been cancelled under a provision set out in subsection (1) or (2), or the lands referred to in subsection 52(5), the Minister may delay the opening of the lands for prospecting and staking.
57 (1) A holder of a recorded claim who wants to obtain a lease of a recorded claim must
(a) obtain a plan of survey of the claim prepared in accordance with the Canada Lands Surveys Act;
(b) provide a report of any overlap with a boundary of any other claim;
(c) send a copy of the plan of survey, the report and a notice in the prescribed form, by registered mail or courier, to the holders of adjacent recorded claims and leased claims at their addresses on record with the Mining Recorder; and
(d) send to the Mining Recorder a copy of the plan of survey, the report, the notice and evidence that the holders of the adjacent claims have received copies of those documents.
(2) If two or more contiguous recorded claims are to be included in one lease and their aggregate area, as stated in the applications to record them, does not exceed 1250 hectares, one plan of survey may be prepared that shows only the perimeter of the collection of contiguous claims.
(3) On receipt of the documents referred to in paragraph (1)(d), the Mining Recorder must post a copy of the notice in the office of the Mining Recorder for a period of 21 days.
58 (1) If the surveyed area of one claim exceeds the area stated in the application to record that claim, the claim holder must pay to the Mining Recorder the charge determined by the formula
is the excess area in hectares of the claim;
is $5; and
is the number of years from the date of recording of the claim.
(2) If the surveyed area of contiguous recorded claims that are shown in a plan of survey of their perimeter prepared in accordance with subsection 57(2) exceeds their aggregate area as stated in the applications to record those claims, the claim holder must pay to the Mining Recorder for each claim the charge determined by the formula
is the total excess area in hectares of all of the claims;
is the number of claims in the survey;
is $5; and
is the number of years from the recording date of the claim.
(3) Remission is granted of the portion of the charge paid or payable under subsection (1) or (2), as the case may be, that does not exceed the cost of work set out in certificates of work issued with respect to the claim or contiguous claims and that has not been remitted under these Regulations.
59 The Mining Recorder must record the plan of survey if
(a) 30 days have elapsed after the end of the period for posting of a notice under subsection 57(3) and the Mining Recorder has not received any protest with respect to the survey;
(b) the plan of survey has been made by the Surveyor General under section 31 of the Canada Lands Surveys Act;
(c) the applicable fee set out in Schedule 1 has been paid;
(d) the requirements of section 57 have been met; and
(e) any charge payable under subsection 58(1) or (2) has been paid.
60 (1) A holder of a recorded claim who wants to obtain a lease of a recorded claim or a collection of contiguous recorded claims must apply for the lease in the prescribed form.
(2) The application must
(a) be accompanied by the applicable fee set out in Schedule 1; and
(b) be received by the Mining Recorder at least one year before the end of the duration of the claim or of the claim that has the earliest recording date of any of the claims in the collection of contiguous claims.
(3) Before a lease is issued,
(a) an official plan of survey of the claim, or the collection of contiguous claims, must have been recorded under section 59;
(b) certificates of work must have been recorded with respect to the claim, or with respect to each claim in the collection of contiguous recorded claims, that allocate to the claim, or to each claim, a cost of work of at least $25 per hectare, of which the total of the costs of the official plan of survey and of the construction of any roads, airstrips or docks does not exceed $5 per hectare; and
(c) the rent for the first year of the lease must have been paid to the Mining Recorder.
(4) If a claim holder who has applied for a lease advises the Mining Recorder in writing that they cannot, for reasons beyond their control, obtain an official plan of survey and record it before the end of the duration of the claim to be leased,
(a) the duration of the recorded claim is extended for one year;
(b) the requirements under section 39 and subsection 43(1) do not apply for that year; and
(c) the application for a lease on the claim remains valid for that year.
(5) If, before the end of the duration of the recorded claim or of the claim that has the earliest recording date of any of the claims in the coll
The text continues in the official source.
