LEGALDIGMLEGALDIGM
    ← Canada
    Beta
    SOR-2012-139:en

    SOR-2012-139:en — Wastewater Systems Effluent Regulations

    Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.

    Analyze this law with AI
    1 The following definitions apply in these Regulations. Act means the Fisheries Act. (Loi) acutely lethal, in relation to effluent, means that the effluent at 100% concentration kills, during a 96-hour period, more than 50% of the rainbow trout subjected to it. (létalité aiguë) aquatic species authorization officer, in respect of a province set out in column 1 of Schedule 1 and for each type of owner set out in column 2 of a wastewater system located in the province, means the holder of the position set out in column 3. (agent d’autorisation) authorized representative means (a) in respect of an owner or operator who is an individual, that individual or another individual or an entity that is authorized to act on their behalf; (b) in respect of an owner or operator that is a corporation, an employee of the corporation, or another individual or an entity that is authorized to act on behalf of the corporation; and (c) in respect of an owner or operator that is an entity other than a corporation, an individual or entity that is authorized to act on its behalf. (représentant autorisé) blackwater means used water from sanitary appliances that contains human fecal matter or human urine. (eaux-vannes) bypass, in relation to wastewater, means (a) the diversion of wastewater to an overflow point; or (b) the circumvention or the removal of one or more treatment steps normally applied to the wastewater before it is deposited as effluent, in any water or place referred to in subsection 36(3) of the Act, via a final discharge point. (dérivation) carbonaceous biochemical oxygen demanding matter or CBOD matter means carbonaceous matter that consumes, by biochemical oxidation, oxygen dissolved in water. (matières exerçant une demande biochimique en oxygène de la partie carbonée ou matière exerçant une DBOC) combined sewer means a sewer that is designed to collect surface runoff and stormwater in such a manner that it mixes with wastewater referred to in any of paragraphs (a) to (c) of the definition wastewater or any combination of wastewater referred to in those paragraphs. (égout unitaire) composite sample means (a) a composite sample as defined by the government of the province where the wastewater system is located, or under an Act of Parliament, if the definition applies to the wastewater system; (b) a quantity of effluent consisting of not less than three equal volumes or three volumes proportionate to the rate of flow that have been collected at approximately equal time intervals over (i) the period during which effluent is deposited, if effluent is deposited only during part of the day, or (ii) a sampling period of not less than seven hours and not more than 24 hours, if effluent is deposited throughout the day; or (c) a quantity of effluent collected continuously at a constant rate or at a rate proportionate to the rate of flow of the effluent over (i) the period during which effluent is deposited, if effluent is deposited only during part of the day, or (ii) a sampling period of not less than seven hours and not more than 24 hours, if effluent is deposited throughout the day. (échantillon composite) effluent means wastewater that is deposited from a wastewater system. (effluent) final discharge point means any point of a wastewater system, other than an overflow point, beyond which the owner or operator of the system no longer exercises control over the quality of the wastewater before it is deposited as effluent in water or a place. (point de rejet final) greywater means used water, other than blackwater, from sanitary appliances or from other appliances in a kitchen or laundry. (eaux grises) hydraulic retention time, in relation to a wastewater system, means the average period during which wastewater is retained for treatment and storage prior to release from that system. (temps de rétention hydraulique) influent means wastewater entering a wastewater system. (affluent) licensed professional means a licensed member of an engineering or scientific professional organization who has technical expertise in the field in question. (professionnel agréé) operator means any person who operates, has control or custody of or is in charge of a wastewater system. (exploitant) overflow point means a point of a wastewater system via which excess wastewater may be deposited in water or a place and beyond which its owner or operator no longer exercises control over the quality of wastewater before it is deposited as effluent. (point de débordement) point of entry, in relation to the final discharge point or an overflow point of a wastewater system, means (a) the point where effluent is deposited in water frequented by fish via the final discharge point or the overflow point, as the case may be; or (b) any point where the effluent enters that water from the place where it was deposited via the final discharge point or the overflow point, as the case may be. (point d’entrée) previous calendar year, in respect of a given period and a wastewater system, means the most recent calendar year during which effluent was deposited via the system’s final discharge point that ended before the given period. (année civile précédente) previous month, in respect of a given period and a wastewater system, means the most recent month during which effluent was deposited via the system’s final discharge point that ended before the given period. (mois précédent) previous quarter, in respect of a given period and a wastewater system, means the most recent quarter during which effluent was deposited via the system’s final discharge point that ended before the given period. (trimestre précédent) Procedure for pH Stabilization EPS 1/RM/50 means the Procedure for pH Stabilization During the Testing of Acute Lethality of Wastewater Effluent to Rainbow Trout (EPS 1/RM/50), March 2008, published by the Department of the Environment, as amended from time to time. (Procédure de stabilisation du pH SPE 1/RM/50) protected aquatic species means an aquatic species as defined in subsection 2(1) of the Species at Risk Act that is (a) a species at risk as defined in that subsection or a species that is listed in Schedule 1 to that Act; or (b) a species that is protected — or classified as an endangered species or threatened species as defined in that subsection — under the laws of a province. (espèce aquatique protégée) protected species quarter, in respect of a year, means a period of three months that begins on the first day of January, April, July or October. (trimestre) Reference Method EPS 1/RM/13 means the Biological Test Method: Reference Method for Determining Acute Lethality of Effluents to Rainbow Trout (EPS 1/RM/13 Second Edition), December 2000 with May 2007 amendments, published by the Department of the Environment, as amended from time to time. (Méthode de Référence SPE 1/RM/13) sanitary sewer means a sewer that is designed to collect wastewater referred to in any of paragraphs (a) to (c) of the definition wastewater or any combination of wastewater referred to in those paragraphs. (égout sanitaire) suspended solids or SS means any solid matter contained in effluent that is retained on a filter that has a nominal pore size of 1.5 micrometres or smaller. (matières en suspension ou MES) total residual chlorine means the sum of free chlorine and combined chlorine, including inorganic chloramines. (chlore résiduel total) wastewater means (a) blackwater; (b) greywater that is mixed with blackwater; (c) used water — other than blackwater and greywater — from an industrial, commercial or institutional facility that is mixed with blackwater; or (d) surface runoff and stormwater that is mixed with blackwater. (eaux usées) wastewater system means any work or undertaking, at least part of which is located on land, that is used for the collection and deposit of wastewater, whether or not the wastewater is treated, and includes a site that contains a wastewater lagoon. (système d’assainissement) 2 (1) These Regulations apply in respect of a wastewater system that, when it deposits effluent via one or more final discharge points, deposits a deleterious substance prescribed in section 5 in any water or place referred to in subsection 36(3) of the Act and that (a) is designed to collect an average daily volume of 100 m3 or more of influent; or (b) during any calendar year, collects an average daily volume of 100 m3 or more of influent. (2) Despite paragraph (1)(a), these Regulations do not, for the subsequent calendar year, apply in respect of a wastewater system referred to in that paragraph that, during a calendar year, collected an average daily volume of less than 100 m3 of influent. (3) These Regulations do not apply in respect of a wastewater system located (a) in the Northwest Territories; (b) in Nunavut; or (c) north of the 54th parallel in Quebec or Newfoundland and Labrador. (4) These Regulations do not apply in respect of a wastewater system that is located on the site of an industrial, commercial or institutional facility if the wastewater system is designed to collect influent whose volume consists of less than 50% blackwater and greywater combined. (5) These Regulations do not apply in respect of a mill as defined in section 2 of the Pulp and Paper Effluent Regulations. 3 For the purpose of these Regulations, there are two types of wastewater systems, as follows: (a) an intermittent wastewater system, namely, one with a hydraulic retention time of at least 90 days that deposits effluent via its final discharge point during at most four periods per calendar year, each of which is separated from every other period by at least seven clear days during which no deposit occurs; and (b) a continuous wastewater system, namely, any wastewater system other than an intermittent wastewater system. 4 (1) If an owner of at least two original wastewater systems — none of which treats its wastewater in a manner that would permit the deposit of effluent, via its final discharge points, that meets the condition set out in paragraph 6(1)(a) or (b) — plans to consolidate those original wastewater systems into a future consolidated wastewater system, the original wastewater systems that will be consolidated constitute a fictional consolidated wastewater system during the period beginning on the day on which a consolidation plan that meets the requirements of subsection (3) is received by an authorization officer and ending on the day on which the future consolidated wastewater system is put into service. (2) The final discharge point of the fictional consolidated wastewater system is considered to be the final discharge point of the original wastewater systems that is allocated the greatest number of points under the table to Schedule 2. (3) The consolidation plan must contain a description of the modifications to be made to each of the original wastewater systems, including a description of the modifications to be made to their processes, so that the effluent deposited via the final discharge point of the future consolidated wastewater system will not be acutely lethal and will meet the conditions for authorization set out in subsection 6(1), along with a schedule for implementation of the plan. 5 For the purpose of the definition deleterious substance in subsection 34(1) of the Act, the following substances or classes of substances are prescribed as deleterious substances: (a) carbonaceous biochemical oxygen demanding matter; (b) suspended solids; (c) total residual chlorine; and (d) un-ionized ammonia. 6 (1) For the purpose of paragraph 36(4)(b) of the Act, the owner or operator of a wastewater system may — during a given calendar year, quarter or month, as determined in accordance with subsection (2) — deposit or permit the deposit of effluent that contains any of the deleterious substances prescribed in section 5 of these Regulations via each of the system’s final discharge points in any water or place referred to in subsection 36(3) of the Act if the effluent is not acutely lethal as determined in accordance with section 15, the maximum concentration of un-ionized ammonia in the effluent is less than 1.25 mg/L, expressed as nitrogen (N), at 15˚C ± 1˚C, and — during the previous calendar year, previous quarter or previous month, as the case may be — the effluent met the following conditions: (a) the average carbonaceous biochemical oxygen demand due to the quantity of CBOD matter in the effluent did not exceed 25 mg/L; (b) the average concentration of suspended solids in the effluent did not exceed 25 mg/L; and (c) the average concentration of total residual chlorine in the effluent did not exceed 0.02 mg/L, if chlorine, or one of its compounds, was used in the treatment of wastewater. (d) (2) The maximum concentration and the averages referred to in subsection (1) must be determined on the following basis: (a) each calendar year, if the average daily volume of effluent deposited via all of the final discharge points during the previous calendar year was (i) less than or equal to 17 500 m3, for an intermittent wastewater system, and (ii) less than or equal to 2 500 m3, for a continuous wastewater system with a hydraulic retention time of five or more days or for a continuous wastewater system that is the subject of a transitional authorization; (b) each quarter, if the average daily volume of effluent deposited via all of the final discharge points during the previous calendar year was (i) greater than 2 500 m3 and less than or equal to 17 500 m3, for a continuous wastewater system with a hydraulic retention time of five or more days, and (ii) less than or equal to 17 500 m3, for any other continuous wastewater system; and (c) each month, if the average daily volume of effluent deposited via all of the final discharge points during the previous calendar year was greater than 17 500 m3. (3) The averages referred to in paragraphs (1)(a) and (b) must be determined (a) for an intermittent wastewater system, based on samples of effluent referred to in subsection 10(1) and, if applicable, subsection 10(2), in accordance with subsection 10(6); and (b) for a continuous wastewater system, based on samples of effluent referred to in, as the case may be, subsection 10(3) or (4), in accordance with subsection 10(6). (4) The determination of averages made in accordance with subsection (3) must take into account the results of the determination, by a laboratory referred to in section 16, of the elements referred to in subsection 10(6) for any sample in excess of the number of samples required by subsections 10(1) to (4). (5) For an intermittent wastewater system or a continuous wastewater system with a hydraulic retention time of five or more days, the determination of the average referred to in paragraph (1)(b) is not to take into account the result of any determination of the concentration of suspended solids in a sample of effluent referred to in paragraph 10(6)(b) that was taken during any four months during the period beginning on May 1 and ending on November 30, if that result is greater than 25 mg/L and is caused by a bloom of algae or proliferation of aquatic invertebrates. (6) If subsection (5) applies to every sample referred to in paragraph (3)(a) or (b) that is used to determine the average referred to in paragraph (1)(b), that average is deemed to be 0 mg/L. (7) The authorization granted to an owner or operator under subsection (1) is conditional on the owner or operator (a) determining the average daily volume of effluent deposited annually via the final discharge point in accordance with section 7; (b) for an intermittent wastewater system, either installing, maintaining and calibrating the monitoring equipment referred to in subparagraph 7(2)(a)(i) or establishing a method of estimation referred to in subparagraph 7(2)(a)(ii) and applying and updating it in accordance with subsection 7(4); (c) for a continuous wastewater system, either installing, maintaining and calibrating the monitoring equipment referred to in subparagraph 7(2)(b)(i) or establishing a method of estimation referred to in subparagraph 7(2)(b)(ii) and applying and updating it in accordance with subsection 7(4); (d) monitoring effluent in accordance with sections 10 and 11 and sending a monitoring report in accordance with section 19; (e) keeping the record required under section 17; (f) sending an identification report in accordance with section 18; (g) sending the overflow report, if applicable, required under section 20 in accordance with subsections 19(4) and (5); and (h) installing, operating and maintaining a dechlorination system – if chlorine, or one of its compounds, is being used in the treatment of wastewater – so that the concentration of total residual chlorine in a grab sample of effluent does not exceed 0.10 mg/L when measured using a total residual chlorine instrument or test in accordance with standards of good scientific practice that are generally accepted at the time of the sampling. 7 (1) The owner or operator of a wastewater system must, for each calendar year, calculate the average daily volume of effluent deposited via all of the system’s final discharge points by (a) determining, in accordance with subsection (2), for each day during that calendar year when effluent was deposited, the volume of effluent deposited via each of the final discharge points, expressed in m3; (b) calculating the sum of the daily volumes of effluent of all of the discharge points referred to in paragraph (a); and (c) dividing that sum by the number of days in that calendar year. (2) The volume of effluent during each day referred to in paragraph (1)(a) must be determined (a) for an intermittent wastewater system, (i) by using monitoring equipment referred to in section 9 that provides (A) a continuous measure of the volume of influent, or effluent deposited via the final discharge point, during that day, or (B) a measure of the rate of flow of the influent or that effluent upon which that daily volume may be estimated, or (ii) by using a method of estimation in accordance with subsection (4); (b) for a continuous wastewater system, (i) by using monitoring equipment referred to in section 9 that provides (A) a continuous measure of the volume of influent, or effluent deposited via the final discharge point, during that day, if the average daily volume of effluent deposited via all final discharge points during the previous calendar year was more than 2 500 m3, or (B) a continuous measure of the volume of influent or effluent deposited over this day, or a measure of the rate of flow of that influent or effluent, that allows for the daily volume of effluent to be estimated, if the average daily volume of effluent deposited via all final discharge points during the previous calendar year was 2 500 m3 or less, or (ii) by using a method of estimation in accordance with subsection (4) if (A) a transitional authorization has been issued under subsection 26(1) in respect of the continuous wastewater system, and (B) the average daily volume of effluent deposited via all final discharge points during the previous calendar year was less than 2 500 m3. (3) For the purpose of paragraph (1)(a), if the owner or operator estimates the daily volume of effluent deposited via the final discharge point based on the measured rate of flow referred to in clause (2)(a)(i)(B) or (b)(i)(B), the estimation is to be done as follows: (a) measure the rate of flow of influent, or effluent deposited via the final discharge point, in any chosen unit of volume for any chosen unit of time; and (b) calculate that volume based on that rate of flow for the duration of the deposits of effluent made on that day and, if applicable, convert it to m3. (4) The owner or operator of a wastewater system who has established a method of estimation of the volume of effluent must ensure that it is based on generally accepted engineering practices and use it to estimate the daily volume of effluent deposited via the final discharge point with a margin of error of ±15%. 8 (1) If the average daily volume of effluent deposited via the final discharge point of a wastewater system for a previous calendar year cannot be determined under paragraph 7(2)(a) or (b), as the case may be, that average daily volume must be determined on the basis of the system’s average design rate of flow of influent. (2) If subsection (1) has been applied in respect of a wastewater system for a calendar year, it is not to be applied in respect of the wastewater system for any subsequent calendar year. 9 (1) The owner or operator of a wastewater system must install monitoring equipment that provides a continuous measure of the daily volume or of the rate of flow of the influent or effluent. (2) The owner or operator must maintain the monitoring equipment so that it may be used to determine the volume of effluent deposited via the final discharge point. (3) The owner or operator must calibrate the monitoring equipment in accordance with the recommendations of the manufacturer or licensed professional or, in the absence of such recommendations, must calibrate the equipment at least once in every calendar year and at least five months after the most recent calibration. (4) The monitoring equipment must determine the volume or rate of flow with a margin of error of ±15%. 10 (1) The owner or operator of an intermittent wastewater system must, during each period referred to in paragraph 3(a), take at each of the system’s final discharge points a grab or composite sample of effluent at the following minimum frequencies: (a) if the period is more than 30 days, every two weeks, at least seven days after the previous sample; and (b) if the period is 30 days or less, once. (2) Despite subsection (1), if a grab or composite sample of effluent has been collected at a sampling location referred to in subsection (5) within two weeks of the period referred to in paragraph 3(a) for the government of the province where the wastewater system is located or under an Act of Parliament, and if the determinations referred to in subsection (6) and, if applicable, paragraph 38(b) were made, the owner or operator of a system is not required to take a sample during the first 30 days of deposit and may use the results of the determinations made on the sample of effluent collected prior to deposit. (3) The owner or operator of a continuous wastewater system must take at each of the system’s final discharge points, during each calendar year, a sample of effluent of the type set out in column 2 of the table to this subsection that corresponds to the average daily volume of effluent set out in column 1 that is deposited via all final discharge points during the previous calendar year and must do so at the frequency set out in column 3. (4) Despite subsection (3), the owner or operator of a continuous wastewater system with a hydraulic retention time of five or more days, or of a continuous wastewater system that is the subject of a transitional authorization, may (a) take a grab or composite sample at each of the system’s final discharge points; and (b) reduce the minimum sampling frequency to quarterly, with each sample taken at least 60 days after the previous sample, if the system deposited via all of its final discharge points an average daily volume of less than or equal to 2 500 m3 of effluent during the previous calendar year. (5) Despite subsections (1) and (4), the owner or operator of an intermittent wastewater system, or of a continuous wastewater system with a hydraulic retention time of five or more days, may take a grab or composite sample of effluent at a sampling location other than the final discharge point if the sampling location yields a representative sample as if the sample had been collected at the final discharge point and if the sampling location and sampling procedure are determined by a licensed professional. (6) The owner or operator must, for each sample referred to in subsection (1) to (4), determine or cause the determination of the following elements: (a) the carbonaceous biochemical oxygen demand due to the quantity of CBOD matter in the effluent, in accordance with section 12; and (b) the concentration of suspended solids in the effluent, in accordance with section 13. 11 (1) The owner or operator of an intermittent wastewater system must take at each of the system’s final discharge points, for each period referred to in paragraph 3(a) during each calendar year, a grab sample of effluent on the day a deposit begins if the average daily volume of effluent deposited via all of the final discharge points during the previous calendar year was more than 2 500 m3. (2) The owner or operator of a continuous wastewater system must take at each of the system’s final discharge points, during each calendar year, a grab sample of effluent at the minimum sampling frequency set out in column 2 of the table to this subsection that corresponds to the average daily volume of effluent set out in column 1 deposited via all of the system’s final discharge points during the previous calendar year. (3) For each sample taken under subsection (1) or (2), the owner or operator must determine or cause the determination of whether it is acutely lethal in accordance with section 15. (4) If a sample is determined to be acutely lethal, the owner or operator must take a grab sample without delay, and then subsequently once every two weeks, but at least seven days after the previous sample, and determine or cause the determination of whether it is acutely lethal in accordance with section 15. (5) If three consecutive samples taken in accordance with subsection (4) are determined not to be acutely lethal, subsections (1) to (3) apply to subsequent samples. (6) For greater certainty, subsection (4) applies to any subsequent sample referred to in subsection (5) that is determined to be acutely lethal when tested under subsection (3). (7) The minimum sampling frequency set out in column 2 of the table to subsection (2) is reduced (a) for item 1, to yearly, but at least six months after any other sample, if samples were taken under subsection (2) for each of four consecutive quarters and those samples were tested under subsection (3) and determined not to be acutely lethal; and (b) for item 2, to quarterly, but at least 60 days after any other sample, if samples were taken under subsection (2) for each of 12 consecutive months and those samples were tested under subsection (3) and determined not to be acutely lethal. 12 The demand due to the quantity of carbonaceous biochemical oxygen demanding matter in the effluent must be determined in accordance with a five-day biochemical oxygen demand test with nitrification inhibition. 13 The concentration of suspended solids in the effluent must be determined in accordance with a total suspended solids test. 14 (1) The concentration of un-ionized ammonia in the effluent must be determined in accordance with the following formula: is the concentration of total ammonia determined in accordance with subsection (2), expressed in mg/L as nitrogen (N); and is the pH of the effluent adjusted to 15°C ± 1°C and determined in accordance with subsection (3). (2) The concentration of total ammonia in the effluent must be determined by using an aliquot of the same sample of effluent from which the pH of the effluent was determined and testing it in accordance with a total ammonia test. (3) The pH of the effluent must be determined by using an aliquot of the same sample of effluent from which the concentration of total ammonia of the effluent was determined and testing it in accordance with a pH test. 15 The acute lethality of the effluent must be determined in accordance with (a) Reference Method EPS 1/RM/13 using the procedure set out in section 5 or 6 of that Method; or (b) paragraph (a) using the Procedure for pH Stabilization EPS 1/RM/50. 16 Any determination referred to in subsection 10(6) or 11(3) or (4) or paragraph 34(1)(a) or (b) or subsection 34(4) and any other determination necessary to make any of those determinations — other than the determination of the pH of water necessary to make the determination referred to in subsection 34(3) — must be performed by a laboratory that meets the following conditions at the time of the determination: (a) the laboratory is accredited (i) under the International Organization for Standardization standard ISO/IEC 17025, entitled General requirements for the competence of testing and calibration laboratories, by an accrediting body that is a signatory to the International Laboratory Accreditation Cooperation Mutual Recognition Arrangement, or (ii) under the Environment Quality Act, CQLR, c. Q-2; and (b) the scope of the accreditation of the laboratory includes the parameters that are determined. 17 The owner or operator of a wastewater system must keep the report on each determination made by an accredited laboratory referred to in section 16 and a record that contains the following information: (a) for any final discharge point, (i) the date of each day on which effluent was not deposited via the final discharge point, (ii) the date of each day on which effluent was deposited via the final discharge point, and (iii) for each of the days referred to in subparagraph (ii) (A) for a wastewater system whose daily volume of effluent referred to in paragraph 7(1)(a) was determined using monitoring equipment referred to in section 9 (I) the daily volume of the effluent, expressed in m3, if that volume is yielded by a continuous measure, and (II) the estimated daily volume, expressed in m3, as determined in accordance with subsection 7(3) and the results of the measurement and the calculation referred to in paragraphs 7(3)(a) and (b), in any other case, and (B) for a wastewater system whose daily volume of effluent referred to in paragraph 7(1)(a) was determined using a method of estimation in accordance with subsection 7(4), the estimated daily volume, expressed in m3 and the method of estimation that was used, and (iv) the average daily volume of effluent deposited annually, expressed in m3, determined in accordance with subsection 8(1), if applicable; (b) for each combined sewer overflow point via which effluent is deposited because of precipitation, including the melting of snow or ice, that resulted in excess wastewater in the wastewater system, (i) the date of each day on which effluent was deposited via the overflow point, (ii) for each of those days, the duration or estimated duration, expressed in hours, of the deposit, along with an indication of whether it is the duration or an estimated duration and (A) the daily volume of the effluent deposited, expressed in m3, if that volume is yielded by a continuous measure, and (B) the estimated daily volume of the effluent deposited, expressed in m3, in any other case, (iii) the volume or estimated volume, expressed in m3, of effluent for each month during which effluent was deposited via the overflow point, and (iv) the number of days in each of those months during which effluent was deposited via the overflow point; (c) for any monitoring equipment referred to in section 9, (i) a description, including its type, (ii) if applicable, the manufacturer’s specifications, the year of manufacture and the model number, (iii) each date on which the equipment was calibrated and its degree of accuracy after each calibration, (iv) the date on which the equipment was installed and, if applicable, the date on which it ceased to be used for monitoring and on which it was replaced, (v) the manufacturer’s recommendations for its operation, maintenance and calibration, with supporting documents if they are available, and (vi) a document setting out the calibration procedure that is prepared, signed and certified by a licensed professional, if the monitoring equipment is calibrated in accordance with the recommendations of the licensed professional; (d) for each sample referred to in subsection 10(1) to (4), as the case may be, and, if applicable, subsection 6(4), (i) the results of the determinations referred to in subsection 10(6), (ii) a statement as to whether the sample is a grab sample or a composite sample and the date on which the sample was taken, (iii) a document setting out the sampling location and sampling procedure that is signed and certified by the licensed professional, if the sample is taken at a sampling location other than the final discharge point, and (iv) a statement as to whether the result of the determination of the concentration of suspended solids was not taken into account in the average referred to in paragraph 6(1)(b), in accordance with subsection 6(5); (e) for any dechlorination system referred to in paragraph 6(7)(h), (i) a description of the system, including the manufacturer’s specifications, the year of manufacture and the model number, if any, and (ii) any results of the determination of the concentration of total residual chlorine in the effluent and a description of how that determination was made; (f) for each sample referred to in section 11 whose acute lethality was determined in accordance with section 15, the information referred to in section 8 of Reference Method EPS 1/RM/13 and, if the acute lethality of the effluent was determined in accordance with that method used with the Procedure for pH Stabilization EPS 1/RM/50, section 3 of that procedure; (g) if the owner or operator holds of a temporary authorization issued under subsection 36(1), (i) for each sample referred to in paragraph (d), (A) the result of the determination referred to in paragraph 38(b), (B) the results of the determination of the concentration of total ammonia in the effluent and of the pH of the effluent referred to in subsections 14(2) and (3), respectively, that were used to make the determination referred to in clause (A), (C) a statement as to whether the sample is a grab sample or a composite sample and the date on which the sample was taken, and (ii) the result of the determination referred to in paragraph 38(c) for each August and a description of how that determination was made. 18 (1) The owner or operator of a wastewater system must send to the authorization officer an identification report that contains the following information: (a) the owner’s and the operator’s name, civic and postal addresses, telephone number and, if any, email address and fax number; (b) the name, title, civic and postal addresses, telephone number and, if any, email address and fax number, of a contact person; (c) if any, the wastewater system’s name and civic address; (d) with respect to the wastewater system: (i) a statement indicating whether it is an intermittent or continuous wastewater system, (ii) for a continuous wastewater system, a statement indicating whether its hydraulic retention time is five days or more, (iii) a statement indicating whether the system is owned or operated, or both, by one or several of the following: (A) His Majesty in right of Canada or another federal body, (B) His Majesty in right of a province or another provincial body, (C) a municipality or another local authority, (D) an Indigenous governing body, or (E) an entity other than one referred to in clauses (A) to (D), (iv) a description of the type of wastewater treatment used, if any, and (v) if chlorine or one of its compounds is used, a statement indicating whether a dechlorination system that meets the requirements of paragraph 6(7)(h) is in use; (e) the latitude and longitude of the final discharge point; (f) for a point of entry in relation to the final discharge point, (i) its latitude and longitude, (ii) a description of the water frequented by fish into which effluent is deposited, including (A) a description of its use, if any, and (B) its name, if any, and the name, if any, of the body of water that includes that water, and (iii) a statement as to whether the effluent is deposited in water frequented by fish via the final discharge point or from a place where it was deposited via the final discharge point; (g) the number of overflow points for each of the combined sewers and sanitary sewers of the wastewater system and the latitude and longitude of each of those overflow points; (h) for a point of entry in relation to each overflow point, a description of the water frequented by fish into which effluent is deposited, including (i) a description of its use, if any, and (ii) its name, if any, and the name, if any, of the body of water that includes that water; and (i) for the calendar year before the calendar year in which the identification report is sent, the average daily volume, expressed in m3, of effluent deposited via all of the wastewater system’s final discharge points — calculated in accordance with subsection 7(1) or by using another method based on measurements or, if not so calculated, determined on the basis of the system’s average design rate of flow of influent — and a statement of the method of calculation or determination used and, in the case of a method of calculation based on measurements, a brief description of that method. (2) Despite subsection (1), the owner or operator of a fictional consolidated wastewater system must send an identification report, for each of the original wastewater systems that constitute the fictional system, containing a statement as to whether the final discharge point of that original wastewater system is, in accordance with subsection 4(2), considered to be the final discharge point of the fictional consolidated wastewater system. (3) The latitude and longitude of a point referred to in paragraph (1)(e), subparagraph (1)(f)(i) and paragraph (1)(g) are to be expressed in decimal degrees to four decimal places rounded to the nearest ten-thousandth of a degree and, if the latitude or longitude is equidistant between two ten-thousandths of a degree, to the higher of them. (4) The identification report must be sent electronically, within 45 days after the day on which the wastewater system is put into service, in the form and format specified by the Minister of the Environment and must bear the electronic signature of the owner or operator or their authorized representative. (5) If the Minister of the Environment has not specified an electronic form and format or if it is not feasible to send the report electronically in accordance with subsection (4) because of circumstances beyond the control of the owner or operator, the report must be sent on paper, signed by the owner or operator, or their authorized representative, and in the form and format specified by the Minister of the Environment, if applicable. (6) If the information provided in the identification report changes, the owner or operator or authorized representative must update the identification report no later than 45 days after the day on which the change is made. (7) An owner or operator of a wastewater system must, at least 45 days before the planned decommissioning of the wastewater system, send a notice to the authorization officer setting out the planned date of the decommissioning and information specifying the place, including the civic address, if any, of that place, where the identification report is to be kept. 19 (1) The owner or operator of a wastewater system must send, within 45 days after the end of the period referred to in subsection (2), to the authorization officer, for each final discharge point, a monitoring report containing the following information: (a) if applicable, a statement that indicates that effluent was not deposited during that period; and (b) in any other case, (i) if applicable, a statement that indicates any month in that period during which effluent was not deposited, (ii) the number of days during which effluent was deposited, (iii) the volume of effluent that was deposited, expressed in m3, determined in accordance with subsection 7(1), (iv) the average carbonaceous biochemical oxygen demand due to the quantity of CBOD matter in the effluent, (v) the average concentration of suspended solids in the effluent and a statement as to whether, in accordance with subsection 6(5), the determination of the average concentration referred to in paragraph 6(1)(b) did not take into account the result of any concentration of suspended solids greater than 25 mg/L, (vi) (vii) if the owner or operator holds a temporary authorization issued under subsection 36(1), (A) the result of each determination referred to in clause 17(g)(i)(A) and the date on which the sample used to make that determination was taken, and (B) if the period includes an August, the result of the determination referred to in subparagraph 17(g)(ii) for that August, and (viii) for each sample for which a determination of acute lethality was made in accordance with section 15, a statement that indicates (A) the date on which the sample was taken, (B) each procedure referred to in section 15 that was used to determine the sample’s acute lethality, and (C) whether the sample was acutely lethal or not. (2) For the purpose of subsection (1), the period is (a) a calendar year, if the wastewater system deposited an average daily volume of effluent via all of the final discharge points during the previous calendar year in respect of that calendar year of (i) less than or equal to 17 500 m3, for an intermittent wastewater system, or (ii) less than or equal to 2 500 m3, for a continuous wastewater system with a hydraulic retention time of five or more days or for a continuous wastewater system that is the subject of a transitional authorization; and (b) a quarter, in any other case. (3) The information referred to in subsection (1) is to be reported (a) for the period referred to in subsection (2), if that period is a calendar year or a quarter; and (b) for each month during that period, if that period is a quarter and the average daily volume of effluent deposited via all of the final discharge points during the previous calendar year in respect of that quarter was greater than 17 500 m3. (4) The report must be sent electronically in the form and format specified by the Minister of the Environment and must bear the electronic signature of the owner or operator or their authorized representative. (5) If the Minister of the Environment has not specified an electronic form and format or if it is not feasible to send the report electronically in accordance with subsection (4) because of circumstances beyond the control of the owner or operator, the report must be sent on paper, signed by the owner or operator or their authorized representative, and in the form and format specified by the Minister of the Environment, if applicable. 19.1 The owner or operator of a wastewater system must notify an inspector, fishery officer, or authority prescribed by any regulations made under the Act without delay if a test carried out on a sample of effluent indicates that (a) the concentration of total residual chlorine in the effluent exceeds the maximum concentration set out in paragraph 6(7)(h); (b) the concentration of un-ionized ammonia in the effluent, as determined in accordance with section 14, exceeds the limit set out in subsection 6(1); or (c) the effluent is acutely lethal, as determined in accordance with section 15. 20 The owner or operator of a wastewater system that includes at least one combined sewer overflow point must, in accordance with subsections 19(4) and (5), send to the authorization officer a combined sewer overflow report in respect of each calendar year by February 15 of the following calendar year and the report must contain the following information: (a) for each month of the calendar year during which effluent was deposited via a combined sewer overflow point, the information referred to in subparagraphs 17(b)(iii) and (iv); and (b) for each month of the calendar year during which effluent was not deposited via a combined sewer overflow point, a statement indicating that no effluent was deposited via an overflow point during the month. 21 Records must be made without delay after the information to be recorded becomes available. 22 (1) An owner or operator of a wastewater system must keep a report referred to in section 17, as well as a record and a copy of a report required to be sent under these Regulations — along with any supporting documents — for at least five years after the day on which the record or report, as the case may be, was made. (2) The report referred to in section 17, the record and the copy must be kept at the wastewater system or at any other place in Canada where it can be inspected. If that report, record or copy is kept at one of those other places, the owner or operator must provide the authorization officer with information specifying that other place, including its civic address, if any. (3) Despite subsection (1), the information referred to in paragraph 17(c) must be kept for at least five years after the day on which the monitoring equipment ceased to be used, and the identification report, as it may be updated from time to time, referred to in section 18 must be kept for at least five years after the wastewater system is decommissioned. 23 (1) For the purposes of paragraph 36(4)(b) of the Act, an owner or operator of a wastewater system may deposit or permit the deposit of effluent that contains any of the deleterious substances prescribed in section 5 of these Regulations via one or more final discharge points or overflow points in any water or place referred to in subsection 36(3) of the Act, if the deposit is made in accordance with an authorization issued under this Part. (2) For the purposes of sections 24 to 49, deposit, in relation to effluent, includes to permit the deposit of the effluent. 24 (1) The owner or operator of a wastewater system may apply to an authorization officer for a transitional authorization to deposit, via a final discharge point, effluent that contains any of the deleterious substances prescribed in section 5, if the respective averages of the substances prescribed in paragraphs 5(a) and (b), determined in accordance with subsection (1.1), exceed 25 mg/L. (1.1) The owner or operator of a wastewater system must determine the averages referred to in subsection (1) by averaging, for each substance, the concentrations reported under subparagraphs 19(1)(b)(iv) and (v) (a) if the applicable reporting period under subsection 19(2) is a calendar year, (i) in the first completed monitoring report sent in accordance with subsection 19(1) and in which a deposit is reported; or (ii) in the second monitoring report in which a deposit is reported, if completed and sent consecutively to the first report; (b) if the applicable reporting period under subsection 19(2) is a quarter, in four consecutive monitoring reports of the first four to eight completed and consecutive monitoring reports sent in accordance with subsection 19(1). (1.2) An owner or operator of a wastewater system to whom a transitional authorization was issued in 2014 under section 26, as it read before the day on which this subsection comes into force, is not permitted to reapply for a transitional authorization. (1.3) Sections 24 to 26, 28 and 30, as they read before the day on which this subsection comes into force, continue to apply with respect to any authorization referred to in subsection (1.2). (2) The duration, set out in subsection 26(2), of a transitional authorization is based on the system for the allocation of points related to the final discharge point set out in the table to Schedule 2 and, if applicable, related to the system’s combined sewer overflow points set out in Schedule 3. 25 (1) An application for a transitional authorization in respect of a wastewater system must contain the following information: (a) the owner’s and the operator’s name, civic and postal addresses, telephone number and, if any, email address and fax number; (b) the name, title, civic and postal addresses, telephone number and, if any, email address and fax number of a contact person; (c) if any, the wastewater system’s name and civic address; (d) the period of 12 consecutive months referred to in subsection 24(1) upon which the application is based; (e) information that establishes that at the time of the application (i) half or more of the monitoring reports sent in respect of the two most recent calendar years during which a deposit occurred indicate that one of the conditions set out in paragraphs 6(1)(a) and (b) was not met, (ii) the condition was not met because of the design characteristics of the wastewater system, (iii) it was not technically or economically feasible before the time of the application to have modified the wastewater system, including its processes, in order to meet that condition, and (iv) the requirement set out in section 24 is met; (f) a plan for the modifications to be made to the wastewater system, including a description of the modifications to be made to its processes, so that the effluent deposited via its final discharge point is not acutely lethal and meets the conditions for authorization set out in paragraphs 6(1)(a) and (b), along with a schedule for implementation of the plan; (g) the latitude and longitude of the final discharge point expressed in decimal degrees in accordance with subsection 18(3); (h) the number of points allocated under the table to Schedule 2; (i) a statement as to which of the waters set out in paragraphs 5(a) to (g), column 2, of the table to Schedule 2 describes the water where the effluent is deposited, or may enter from the place where the effluent is deposited, via the final discharge point and, among the points set out in column 3 for those waters, the highest number of points; (j) the average daily volume of effluent deposited via the final discharge point, as determined in accordance with section 7, for the period of 12 consecutive months referred to in subsection 24(1) upon which the application is based, and the number of points set out in item 1, column 3, of the table to Schedule 2 that applies to that volume based on the ranges of volume set out in column 2; (k) the averages referred to in paragraphs 6(1)(a) and (b) on which the application is based, as determined in accordance with subsection 24(1.1); (l) the number of points determined in accordance with the formula set out in item 2, column 2, of the table to Schedule 2 when using in that formula the averages set out in paragraph (k); (m) (n) where chlorine, or one of its compounds, was used in the treatment of wastewater in the wastewater system, the number of points set out in item 3, column 3, of the table to Schedule 2 if (i) the average concentration of total residual chlorine in the effluent deposited via the final discharge point — for the period of 12 consecutive months referred to in subsection 24(1) upon which the application is based — exceeded 0.02 mg/L, or (ii) the wastewater system’s effluent is not dechlorinated before it is deposited via the final discharge point; (o) the maximum concentration of un-ionized ammonia in the effluent, expressed in mg/L as nitrogen (N), at 15°C ± 1°C, over the earliest period of 12 consecutive months since the coming into force of these Regulations, when (i) for a continuous wastewater system, at least four samples have been collected, each at least 60 days after the previous sample was taken, and the concentrations determined in accordance with section 14, and (ii) for an intermittent wastewater system, at least one sample has been collected during each period referred to in paragraph 3(a) and the concentration determined in accordance with section 14; (p) if the maximum concentration referred to in paragraph (o) is greater than or equal to 1.25 mg/L, expressed as nitrogen (N), at 15°C ± 1°C, the number of points set out in item 4, column 3, of the table to Schedule 2; (q) if the duration of the transitional authorization sought in the application relies on an allocation of points under Schedule 3, in addition to points allocated under the table to Schedule 2, for any combined sewer overflow point that is, under Schedule 3, allocated a number of points greater than or equal to the number of points allocated under the table to Schedule 2 to the final discharge point (i) the percentage referred to in item 1, column 1, of Schedule 3 that is described in whichever of paragraphs 1(a) to (d), column 2, of that Schedule that applies, (ii) the number of deposits referred to in item 2, column 1, of Schedule 3 that are described in whichever of paragraphs 2(a) to (d), column 2, of that Schedule that applies, for the period of 12 consecutive months referred to in subsection 24(1) upon which the application is based, (iii) a statement as to which of the waters set out in paragraphs 3(a) to (c), column 2, of Schedule 3 describes the water where the effluent is deposited, or may enter from the place where the effluent is deposited, via that combined sewer overflow point, and (iv) the number of points set out in column 3 of Schedule 3 for the applicable paragraph set out in column 2 of that Schedule as determined for the purposes of subparagraphs (i) and (ii) and the number of those points that applies for each statement referred to in subparagraph (iii); (r) the information set out in paragraph 18(1)(g) for the combined sewer overflow point referred to in paragraph (q); (s) for an application referred to in paragraph (q), a plan that describes the modifications to be made to the wastewater system, and any other measure to be taken, to reduce, after the expiry of the period for which the transitional authorization is sought, the quantity of deleterious substances prescribed in section 5 in the effluent deposited via overflow points of a combined sewer and a schedule for implementation of the plan; and (t) a statement signed and dated by the owner or operator or their authorized representative that certifies that information provided in the application is true, accurate and complete (i) in the case of information that was prepared by the owner or operator, to the best of the owner’s or operator’s information and belief, and (ii) in the case of information that was prepared by other persons with sufficient knowledge to evaluate that information, to the best of the owner’s or operator’s information and belief, based on representations made to them by those persons. (2) Despite subsection (1), an application for a transitional authorization made by an owner or operator of a fictional consolidated wastewater system referred to in section 4 must contain the latitude and longitude of the final discharge point considered in accordance with subsection 4(2) and a copy of the consolidation plan referred to in subsection 4(3) instead of the plan referred to in paragraph (1)(f). 26 (1) Subject to subsection (3), the authorization officer must issue the transitional authorization if (a) the application contains the information required by subsection 25(1) or (2), as the case may be; (b) the information referred to in paragraph 25(1)(e) can reasonably be regarded as establishing that at the time of the application (i) half or more of the monitoring reports sent in respect of the two most recent calendar years during which a deposit occurred indicate that one of the conditions set out in paragraphs 6(1)(a) and (b) was not met, (ii) that condition was not met because of the design of the wastewater system, (iii) it was not technically or economically feasible before the time of the application to have modified the wastewater system, including its processes, in order to meet that condition, and (iv) the requirement set out in section 24 is met; and (c) the schedule to implement the plan referred to in paragraph 25(1)(f) or subsection 4(1), and, if applicable, paragraph 25(1)(s) can reasonably be regarded as feasible for the purpose of meeting the requirements referred to in paragraph 25(1)(f) or subsection 4(3) and, if applicable, achieve the reduction referred to in paragraph 25(1)(s). (2) The transitional authorization must be issued for the following period: (a) the period beginning on the day on which the transitional authorization is issued and ending on December 31, 2030, if the final discharge point is, under the table to Schedule 2, allocated 50 or more points but less than 70 points and, in the case of a wastewater system that has combined sewer overflow points for which points are allocated under Schedule 3, each combined sewer overflow point of the wastewater system is allocated fewer points than the number of points allocated under the table to Schedule 2 to the final discharge point; and (b) (c) the period beginning on the day on which the transitional authorization is issued and ending on December 31, 2040, (i) if the final discharge point is, under the table to Schedule 2, allocated less than 50 points, or (ii) if the final discharge point is, under the table to Schedule 2, allocated 50 or more points and the wastewater system has combined sewer overflow points for which points are allocated under Schedule 3, there is at least one combined sewer overflow point that is, under Schedule 3, allocated a number of points that is greater than or equal to the number of points allocated under the table to Schedule 2 to the final discharge point. (3) The authorization officer must refuse to issue the transitional authorization if they have reasonable grounds to believe that the information contained in, or provided in support of, the application is false or misleading in a material respect. (4) The authorization officer must refuse to issue the transitional authorization if the final discharge point is, under the table to Schedule 2, allocated 70 or more points and, in the case of a wastewater system that has combined sewer overflow points for which points are allocated under Schedule 3, each combined sewer overflow point of the wastewater system is allocated fewer points than the number of points allocated to the final discharge point under Schedule 2. 28 (1) A holder of a transitional authorization in respect of a wastewater system is authorized — during a given calendar year, quarter or month, determined in accordance with subsection 6(2), in the period of authorization — to deposit effluent that contains any of the deleterious substances prescribed in section 5 via the final discharge point if — during the previous calendar year, previous quarter or previous month — the effluent met the following conditions: (a) the average carbonaceous biochemical oxygen demand due to the quantity of CBOD matter in the effluent referred to in paragraph 6(1)(a), determined in accordance with subsections 6(2) and (3), did not exceed (i) 1.25 times the average determined for the carbonaceous biochemical oxygen demand due to the quantity of CBOD matter referred to in paragraph 25(1)(k), if the product of that multiplication is greater than 25 mg/L, and (ii) 25 mg/L, in any other case; (b) the average concentration of suspended solids in the effluent referred to in paragraph 6(1)(b), determined in accordance with subsections 6(2) and (3), did not exceed (i) 1.25 times the average concentration of suspended solids referred to in paragraph 25(1)(k), if the product of that multiplication is greater than 25 mg/L, and (ii) 25 mg/L, in any other case; (c) the average concentration of total residual chlorine in the effluent referred to in paragraph 6(1)(c) did not exceed 0.02 mg/L, if chlorine, or one of its compounds, was used in the treatment of wastewater; and (d) the maximum concentration of un-ionized ammonia in the effluent referred to in subsection 6(1) was less than (i) 1.25 times the maximum concentration referred to in paragraph 25(1)(o), if the product of that multiplication is great

    The text continues in the official source.

    Related guides, FAQ and contract templates