Fla. Stat. ch. 366
CHAPTER 366
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Always check the official source for the current text.
366.01 Legislative declaration.
The regulation of public utilities as defined herein is declared to be in the public interest and this chapter shall be deemed to be an exercise of the police power of the state for the protection of the public welfare and all the provisions hereof shall be liberally construed for the accomplishment of that purpose.
History. — s. 1, ch. 26545, 1951; s. 3, ch. 76-168; s. 1, ch. 77-457; s. 16, ch. 80-35; s. 2, ch. 81-318; ss. 20, 22, ch. 89-292; s. 4, ch. 91-429.
366.015 Interagency liaison.
The commission is directed to provide for, and assume primary responsibility for, establishing and maintaining continuous liaison with all other appropriate state and federal agencies whose policy decisions and rulemaking authority affect those utilities over which the commission has primary regulatory jurisdiction. This liaison shall be conducted at the policymaking levels as well as the department, division, or bureau levels. Active participation in other agencies’ public hearings is encouraged to transmit the commission’s policy positions and information requirements, in order to provide for more efficient regulation.
History. — s. 6, ch. 74-196; s. 3, ch. 76-168; s. 1, ch. 77-457; ss. 1, 16, ch. 80-35; s. 2, ch. 81-318; ss. 20, 22, ch. 89-292; s. 4, ch. 91-429.
366.02 Definitions.
As used in this chapter:
(1) “Attaching entity” means a person that is a local exchange carrier, a public utility, a communications services provider, a broadband service provider, or a cable television operator that owns or controls pole attachments.
(2) “Commission” means the Florida Public Service Commission.
(3) “Communications services provider” means an entity providing communications services as defined in s. 202.11(1).
(4) “Electric utility” means any municipal electric utility, investor-owned electric utility, or rural electric cooperative which owns, maintains, or operates an electric generation, transmission, or distribution system within the state.
(5) “Pole” means a pole used for electric distribution service, streetlights, communications services, local exchange services, or cable television services which is owned in whole or in part by a pole owner. The term does not include a pole used solely to support wireless communications service facilities or a pole with no electrical facilities attached.
(6) “Pole attachment” means any attachment by a public utility, local exchange carrier communications services provider, broadband provider, or cable television operator to a pole, duct, conduit, or right-of-way owned or controlled by a pole owner.
(7) “Pole owner” means a local exchange carrier, a public utility, a communications services provider, or a cable television operator that owns a pole.
(8) “Public utility” means every person, corporation, partnership, association, or other legal entity and their lessees, trustees, or receivers supplying electricity or gas (natural, manufactured, or similar gaseous substance) to or for the public within this state; but the term “public utility” does not include either a cooperative now or hereafter organized and existing under the Rural Electric Cooperative Law of the state; a municipality or any agency thereof; any dependent or independent special natural gas district; any natural gas transmission pipeline company making only sales or transportation delivery of natural gas at wholesale and to direct industrial consumers; any entity selling or arranging for sales of natural gas which neither owns nor operates natural gas transmission or distribution facilities within the state; or a person supplying liquefied petroleum gas, in either liquid or gaseous form, irrespective of the method of distribution or delivery, or owning or operating facilities beyond the outlet of a meter through which natural gas is supplied for compression and delivery into motor vehicle fuel tanks or other transportation containers, unless such person also supplies electricity or manufactured or natural gas.
(9) “Redundant pole” means a pole owned or controlled by a pole owner which is:
(a) Near or adjacent to a new pole that is intended to replace the old pole from which some or all of the pole attachments have not been removed and transferred to the new pole;
(b) Left standing after the pole owner has relocated its facilities to underground but on which pole attachments of other attaching entities remain; or
(c) Left standing after a pole owner’s attachments have been removed from that route or location to accommodate a new route or design for the delivery of service.
History. — s. 2, ch. 26545, 1951; s. 3, ch. 76-168; s. 1, ch. 77-457; ss. 2, 16, ch. 80-35; s. 2, ch. 81-318; ss. 1, 20, 22, ch. 89-292; s. 4, ch. 91-429; s. 14, ch. 92-284; s. 2, ch. 2021-191; s. 27, ch. 2022-4.
366.03 General duties of public utility.
Each public utility shall furnish to each person applying therefor reasonably sufficient, adequate, and efficient service upon terms as required by the commission. No public utility shall be required to furnish electricity or gas for resale except that a public utility may be required to furnish gas for containerized resale. All rates and charges made, demanded, or received by any public utility for any service rendered, or to be rendered by it, and each rule and regulation of such public utility, shall be fair and reasonable. No public utility shall make or give any undue or unreasonable preference or advantage to any person or locality, or subject the same to any undue or unreasonable prejudice or disadvantage in any respect.
History. — s. 3, ch. 26545, 1951; s. 3, ch. 76-168; s. 1, ch. 77-457; s. 16, ch. 80-35; s. 2, ch. 81-318; ss. 1, 15, ch. 82-25; ss. 20, 22, ch. 89-292; s. 4, ch. 91-429.
366.031 Definitions; preference relating to cable television prohibited; penalties.
(1) As used in this section, the term:
(a) “Affiliate,” when used in relation to any person, means another person who owns or controls, is owned or controlled by, or is under common ownership or control with, such person.
(b) “Cable service” means:
1. The one-way transmission to subscribers of video programming or any other programming service; and
2. Subscriber interaction, if any, which is required for the selection of such video programming or other programming service.
(c) “Cable system” means a facility, consisting of a set of closed transmission paths and associated signal generation, reception, and control equipment that is designed to provide cable service which includes video programming and which is provided to multiple subscribers within a community, but such term does not include:
1. A facility that serves only to retransmit the television signals of one or more television broadcast stations;
2. A facility that serves only subscribers in one or more multiple-unit dwellings under common ownership, control, or management, unless such facility or facilities uses any public right-of-way;
3. A facility of a common carrier, except that such facility shall be considered a cable system to the extent such facility is used in the transmission of video programming directly to subscribers; or
4. Any facilities of any electric utility used solely for operating its electric utility systems.
(d) “Video programming” means programming provided by or generally considered comparable to programming provided by a television broadcast station or cable system.
(2) No electric utility shall make or give any preference or advantage to any person as an accommodation or inducement to that person to contract with or take the services of any entity which is an affiliate of such electric utility and which entity provides video programming to persons within all or any part of the service area of such electric utility.
(3) No electric utility shall make or give any preference or advantage over any entity which is not an affiliate of such electric utility, and which entity provides video programming to persons within all or any part of the service area of such electric utility, to any entity which is an affiliate of such electric utility and which entity provides video programming to persons within all or any part of the service area of such electric utility.
(4) Upon a finding by a court of competent jurisdiction that either any electric utility or its affiliate providing video programming services within all or any part of the service area of the electric utility has violated the provisions of this section, the court:
(a) May award actual damages to any other entity not an affiliate of the electric utility providing video programming services to persons within all or any part of the service area of the electric utility, and may grant injunctive relief.
(b) Shall award costs of any action, together with reasonable attorney’s fees, to the prevailing party.
History. — s. 4, ch. 87-266; s. 22, ch. 89-292; s. 4, ch. 91-429.
366.032 Preemption over utility service restrictions.
(1) A municipality, county, board, agency, commission, or authority of any county, municipal corporation, or political subdivision, special district, community development district created pursuant to chapter 190, or other political subdivision of the state may not enact or enforce a resolution, ordinance, rule, code, or policy or take any action that restricts or prohibits or has the effect of restricting or prohibiting the types or fuel sources of energy production which may be used, delivered, converted, or supplied by the following entities to serve customers that such entities are authorized to serve:
(a) A public utility or an electric utility as defined in this chapter;
(b) An entity formed under s. 163.01 that generates, sells, or transmits electrical energy;
(c) A natural gas utility as defined in s. 366.04(3)(c);
(d) A natural gas transmission company as defined in s. 368.103; or
(e) A Category I liquefied petroleum gas dealer or Category II liquefied petroleum gas dispenser or Category III liquefied petroleum gas cylinder exchange operator as defined in s. 527.01.
(2) Except to the extent necessary to enforce the Florida Building Code adopted pursuant to s. 553.73 or the Florida Fire Prevention Code adopted pursuant to s. 633.202, a municipality, county, board, agency, commission, or authority of any county, municipal corporation, or political subdivision, special district, community development district created pursuant to chapter 190, or other political subdivision of the state may not enact or enforce a resolution, an ordinance, a rule, a code, or a policy or take any action that restricts or prohibits or has the effect of restricting or prohibiting the use of an appliance, including a stove or grill, which uses the types or fuel sources of energy production which may be used, delivered, converted, or supplied by the entities listed in subsection (1). As used in this subsection, the term “appliance” means a device or apparatus manufactured and designed to use energy and for which the Florida Building Code or the Florida Fire Prevention Code provides specific requirements.
(3) Notwithstanding the restrictions of this section, this section does not prevent the board of a municipality or governmental entity which owns or operates and directly controls an electric or natural gas utility from passing rules, regulations, or policies governing the utility.
(4) This section does not expand or alter the jurisdiction of the commission over public utilities or electric utilities.
(5) Any municipality, county, board, agency, commission, or authority of any county, municipal corporation, or political subdivision, special district, community development district created pursuant to chapter 190, or political subdivision charter, resolution, ordinance, rule, code, policy, or action that is preempted by this act that existed before or on July 1, 2021, is void.
(6) For purposes of this section, the term “agency” does not apply to a separate legal entity that is created under s. 163.01, that does not provide utility services to consumers, and the membership of which consists only of electric utilities.
History. — ss. 1, 2, ch. 2021-150; s. 28, ch. 2022-4; s. 10, ch. 2023-155; s. 1, ch. 2023-285; s. 3, ch. 2024-186; s. 1, ch. 2025-42.
366.04 Jurisdiction of commission.
(1) In addition to its existing functions, the commission shall have jurisdiction to regulate and supervise each public utility with respect to its rates and service; assumption by it of liabilities or obligations as guarantor, endorser, or surety; and the issuance and sale of its securities, except a security which is a note or draft maturing not more than 1 year after the date of such issuance and sale and aggregating (together with all other then-outstanding notes and drafts of a maturity of 1 year or less on which such public utility is liable) not more than 5 percent of the par value of the other securities of the public utility then outstanding. In the case of securities having no par value, the par value for the purpose of this section shall be the fair market value as of the date of issue. The commission, upon application by a public utility, may authorize the utility to issue and sell securities of one or more offerings, or of one or more types, over a period of up to 12 months; or, if the securities are notes or drafts maturing not more than 1 year after the date of issuance and sale, the commission, upon such application, may authorize the utility to issue and sell such securities over a period of up to 24 months. The commission may take final action to grant an application by a public utility to issue and sell securities or to assume liabilities or obligations after having given notice in the Florida Administrative Register published at least 7 days in advance of final agency action. In taking final action on such application, the commission may deny authorization for the issuance or sale of a security or assumption of a liability or obligation if the security, liability, or obligation is for nonutility purposes; and shall deny authorization for the issuance or sale of a security or assumption of a liability or obligation if the financial viability of the public utility is adversely affected such that the public utility’s ability to provide reasonable service at reasonable rates is jeopardized. Securities issued by a public utility or liabilities or obligations assumed by a public utility as guarantor, endorser, or surety pursuant to an order of the commission, which order is certified by the clerk of the commission and which order approves or authorizes the issuance and sale of such securities or the assumption of such liabilities or obligations, shall not be invalidated by a modification, repeal, or amendment to that order or by a supplemental order; however, the commission’s approval of the issuance of securities or the assumption of liabilities or obligations shall constitute approval only as to the legality of the issue or assumption, and in no way shall it be considered commission approval of the rates, service, accounts, valuation, estimates, or determinations of cost or any other such matter. The jurisdiction conferred upon the commission shall be exclusive and superior to that of all other boards, agencies, political subdivisions, municipalities, towns, villages, or counties, and, in case of conflict therewith, all lawful acts, orders, rules, and regulations of the commission shall in each instance prevail.
(2) In the exercise of its jurisdiction, the commission shall have power over electric utilities for the following purposes:
(a) To prescribe uniform systems and classifications of accounts.
(b) To prescribe a rate structure for all electric utilities.
(c) To require electric power conservation and reliability within a coordinated grid, for operational as well as emergency purposes.
(d) To approve territorial agreements between and among rural electric cooperatives, municipal electric utilities, and other electric utilities under its jurisdiction. However, nothing in this chapter shall be construed to alter existing territorial agreements as between the parties to such agreements.
(e) To resolve, upon petition of a utility or on its own motion, any territorial dispute involving service areas between and among rural electric cooperatives, municipal electric utilities, and other electric utilities under its jurisdiction. In resolving territorial disputes, the commission may consider, but not be limited to consideration of, the ability of the utilities to expand services within their own capabilities and the nature of the area involved, including population, the degree of urbanization of the area, its proximity to other urban areas, and the present and reasonably foreseeable future requirements of the area for other utility services.
(f) To prescribe and require the filing of periodic reports and other data as may be reasonably available and as necessary to exercise its jurisdiction hereunder.
No provision of this chapter shall be construed or applied to impede, prevent, or prohibit any municipally owned electric utility system from distributing at retail electrical energy within its corporate limits, as such corporate limits exist on July 1, 1974; however, existing territorial agreements shall not be altered or abridged hereby.
(3) In the exercise of its jurisdiction, the commission shall have the authority over natural gas utilities for the following purposes:
(a) To approve territorial agreements between and among natural gas utilities. However, nothing in this chapter shall be construed to alter existing territorial agreements between the parties to such agreements.
(b) To resolve, upon petition of a utility or on its own motion, any territorial dispute involving service areas between and among natural gas utilities. In resolving territorial disputes, the commission may consider, but not be limited to consideration of, the ability of the utilities to expand services within their own capabilities and the nature of the area involved, including population, the degree of urbanization of the area, its proximity to other urban areas, and the present and reasonably foreseeable future requirements of the area for other utility services.
(c) For purposes of this subsection, “natural gas utility” means any utility which supplies natural gas or manufactured gas or liquefied gas with air admixture, or similar gaseous substance by pipeline, to or for the public and includes gas public utilities, gas districts, and natural gas utilities or municipalities or agencies thereof.
(4) Any customer shall be given an opportunity to present oral or written communications in commission proceedings to approve territorial agreements or resolve territorial disputes. If the commission proposes to consider such material, then all parties shall be given an opportunity to cross-examine or challenge or rebut it. Any substantially affected customer shall have the right to intervene in such proceedings.
(5) The commission shall further have jurisdiction over the planning, development, and maintenance of a coordinated electric power grid throughout Florida to assure an adequate and reliable source of energy for operational and emergency purposes in Florida and the avoidance of further uneconomic duplication of generation, transmission, and distribution facilities.
(6) The commission shall further have exclusive jurisdiction to prescribe and enforce safety standards for transmission and distribution facilities of all public electric utilities, cooperatives organized under the Rural Electric Cooperative Law, and electric utilities owned and operated by municipalities. In adopting safety standards, the commission shall, at a minimum:
(a) Adopt the 1984 edition of the National Electrical Safety Code (ANSI C2) as initial standards; and
(b) Adopt, after review, any new edition of the National Electrical Safety Code (ANSI C2).
The standards prescribed by the current 1984 edition of the National Electrical Safety Code (ANSI C2) shall constitute acceptable and adequate requirements for the protection of the safety of the public, and compliance with the minimum requirements of that code shall constitute good engineering practice by the utilities. The administrative authority referred to in the 1984 edition of the National Electrical Safety Code is the commission. However, nothing herein shall be construed as superseding, repealing, or amending the provisions of s. 403.523(1) and (10).
(7)(a) As used in this subsection, the term “affected municipal electric utility” means a municipality that operates an electric utility that:
1. Serves two cities in the same county;
2. Is located in a noncharter county;
3. Has between 30,000 and 35,000 retail electric customers as of September 30, 2007; and
4. Does not have a service territory that extends beyond its home county as of September 30, 2007.
(b) Each affected municipal electric utility shall conduct a referendum election of all of its retail electric customers, with each named retail electric customer having one vote, concurrent with the next regularly scheduled general election following the effective date of this act.
(c) The ballot for the referendum election required under paragraph (b) shall contain the following question: “Should a separate electric utility authority be created to operate the business of the electric utility in the affected municipal electric utility?” The statement shall be followed by the word “yes” and the word “no.”
(d) The provisions of the Election Code relating to notice and conduct of the election shall be followed to the extent practicable. Costs of the referendum election shall be borne by the affected municipal electric utility.
(8)(a) The commission shall regulate and enforce rates, charges, terms, and conditions of pole attachments, including the types of attachments regulated under 47 U.S.C. s. 224(a)(4), attachments to streetlight fixtures, attachments to poles owned by a public utility, or attachments to poles owned by a communications services provider, to ensure that such rates, charges, terms, and conditions are just and reasonable. The commission’s authority under this subsection includes, but is not limited to, the state regulatory authority referenced in 47 U.S.C. s. 224(c).
(b) In the development of rules pursuant to paragraph (g), the commission shall consider the interests of the subscribers and users of the services offered through such pole attachments, as well as the interests of the consumers of any pole owner providing such attachments.
(c) It is the intent of the Legislature to encourage parties to enter into voluntary pole attachment agreements, and this subsection may not be construed to prevent parties from voluntarily entering into pole attachment agreements without commission approval.
(d) A party’s right to nondiscriminatory access to a pole under this subsection is identical to the rights afforded under 47 U.S.C. s. 224(f)(1). A pole owner may deny access to its poles on a nondiscriminatory basis when there is insufficient capacity, for reasons of safety and reliability, and when required by generally applicable engineering purposes. A pole owner’s evaluation of capacity, safety, reliability, and engineering requirements must consider relevant construction and reliability standards approved by the commission.
(e) The commission shall hear and resolve complaints concerning rates, charges, terms, conditions, voluntary agreements, or any denial of access relative to pole attachments. Federal Communications Commission precedent is not binding upon the commission in the exercise of its authority under this subsection. When taking action upon such complaints, the commission shall establish just and reasonable cost-based rates, terms, and conditions for pole attachments and shall apply the decisions and orders of the Federal Communications Commission and any appellate court decisions reviewing an order of the Federal Communications Commission regarding pole attachment rates, terms, or conditions in determining just and reasonable pole attachment rates, terms, and conditions unless a pole owner or attaching entity establishes by competent substantial evidence pursuant to proceedings conducted pursuant to ss. 120.569 and 120.57 that an alternative cost-based pole attachment rate is just and reasonable and in the public interest.
(f) In the administration and implementation of this subsection, the commission shall authorize any petitioning pole owner or attaching entity to participate as an intervenor with full party rights under chapter 120 in the first four formal administrative proceedings conducted to determine pole attachment rates under this section. These initial four proceedings are intended to provide commission precedent on the establishment of pole attachment rates by the commission and help guide negotiations toward voluntary pole attachment agreements. After the fourth such formal administrative proceeding is concluded by final order, parties to subsequent pole attachment rate proceedings are limited to the specific pole owner and pole attaching entities involved in and directly affected by the specific pole attachment rate.
(g) The commission shall propose procedural rules to administer and implement this subsection. The rules must be proposed for adoption no later than January 1, 2022, and, upon adoption of such rules, shall provide its certification to the Federal Communications Commission pursuant to 47 U.S.C. s. 224(c)(2).
(9)(a) The commission shall regulate the safety, vegetation management, repair, replacement, maintenance, relocation, emergency response, and storm restoration requirements for poles of communication services providers. This subsection does not apply to a communications services provider that owns no poles.
(b) The commission shall adopt rules to administer and implement this subsection. The rules must be proposed for adoption no later than April 1, 2022, and must address at least the following:
1. Mandatory pole inspections, including repair or replacement;
2. Vegetation management requirements for poles owned by providers of communications services; and
3. Monetary penalties to be imposed upon any communications services provider that fails to comply with any such rule of the commission. Monetary penalties imposed by the commission must be consistent with s. 366.095.
(c) The commission may access the books and records of communications services providers to the limited extent necessary to perform its functions and to exercise its authority under subsection (8), this subsection, and s. 366.97(4). Upon request by a communications services provider, any records that are received by the commission under this paragraph which are proprietary confidential business information under s. 364.183 or s. 366.093 shall retain their status as confidential or exempt from disclosure under s. 119.07(1) and s. 24(a), Art. I of the State Constitution.
History. — s. 4, ch. 26545, 1951; s. 1, ch. 63-288; s. 1, ch. 63-279; s. 1, ch. 65-52; s. 1, ch. 74-196; s. 3, ch. 76-168; s. 1, ch. 77-457; ss. 3, 16, ch. 80-35; s. 2, ch. 81-318; s. 4, ch. 86-173; ss. 2, 20, 22, ch. 89-292; s. 50, ch. 90-331; s. 4, ch. 91-429; s. 13, ch. 95-146; s. 16, ch. 2006-230; s. 37, ch. 2008-227; s. 32, ch. 2013-14; s. 66, ch. 2014-17; s. 3, ch. 2021-191; s. 29, ch. 2022-4.
366.041 Rate fixing; adequacy of facilities as criterion.
(1) In fixing the just, reasonable, and compensatory rates, charges, fares, tolls, or rentals to be observed and charged for service within the state by any and all public utilities under its jurisdiction, the commission is authorized to give consideration, among other things, to the efficiency, sufficiency, and adequacy of the facilities provided and the services rendered; the cost of providing such service and the value of such service to the public; the ability of the utility to improve such service and facilities; and energy conservation and the efficient use of alternative energy resources; provided that no public utility shall be denied a reasonable rate of return upon its rate base in any order entered pursuant to such proceedings. In its consideration thereof, the commission shall have authority, and it shall be the commission’s duty, to hear service complaints, if any, that may be presented by subscribers and the public during any proceedings involving such rates, charges, fares, tolls, or rentals; however, no service complaints shall be taken up or considered by the commission at any proceedings involving rates, charges, fares, tolls, or rentals unless the utility has been given at least 30 days’ written notice thereof, and any proceeding may be extended, prior to final determination, for such period; further, no order hereunder shall be made effective until a reasonable time has been given the utility involved to correct the cause of service complaints, considering the factor of growth in the community and availability of necessary equipment.
(2) The power and authority herein conferred upon the commission shall not cancel or amend any existing punitive powers of the commission but shall be supplementary thereto and shall be construed liberally to further the legislative intent that adequate service be rendered by public utilities in the state in consideration for the rates, charges, fares, tolls, and rentals fixed by said commission and observed by said utilities under its jurisdiction.
(3) The term “public utility” as used herein means all persons or corporations which the commission has the authority, power, and duty to regulate for the purpose of fixing rates and charges for services rendered and requiring the rendition of adequate service.
(4) No electric utility may collect impact fees designed to recover capital costs in initiating new service unless the utility can demonstrate and the commission finds that such fees are fair, just, and reasonable and are collected from the ultimate utility customer of record at such time as or after permanent electric service is provided. This prohibition shall not apply to underground electric distribution lines or line extension charges collected pursuant to approved tariffs.
History. — ss. 1, 2, 3, 4, ch. 67-326; s. 3, ch. 76-168; s. 1, ch. 77-457; s. 53, ch. 78-95; ss. 4, 16, ch. 80-35; s. 2, ch. 81-318; ss. 3, 20, 22, ch. 89-292; s. 4, ch. 91-429.
366.042 Mutual aid agreements of rural electric cooperatives and municipal electric utilities.
(1) For the purposes of restoring power following a natural disaster that is subject to a state of emergency declared by the Governor, all rural electric cooperatives and municipal electric utilities shall enter into and maintain, at a minimum, one of the following:
(a) A mutual aid agreement with a municipal electric utility;
(b) A mutual aid agreement with a rural electric cooperative;
(c) A mutual aid agreement with a public utility; or
(d) A pre-event agreement with a private contractor.
(2) All rural electric cooperatives and municipal electric utilities operating in this state shall annually submit to the commission an attestation, in conformity with s. 92.525, stating that the organization has complied with the requirements of this section on or before May 15. Nothing in this section shall be construed to give the commission jurisdiction over the terms and conditions of a mutual aid agreement or agreement with a private contractor entered into by a rural electric cooperative or a municipal electric utility.
(3) The commission shall compile the attestations and annually submit a copy to the Division of Emergency Management no later than May 30.
(4) A rural electric cooperative or municipal electric utility that submits the attestation required by this section is eligible to receive state financial assistance, if such funding is available, for power restoration efforts following a natural disaster that is subject to a state of emergency declared by the Governor.
(5) A rural electric cooperative or municipal electric utility that does not submit an attestation required by this section is ineligible to receive state financial assistance for power restoration efforts following a natural disaster that is subject to a state of emergency declared by the Governor, until such time as the attestation is submitted.
(6) Nothing in this section shall be construed to prohibit, limit, or disqualify a rural electric cooperative or municipal electric utility from receiving funding under the Stafford Act, 42 U.S.C. ss. 5121 et seq., or any other federal program, including programs administered by the state.
(7) This section does not expand or alter the jurisdiction of the commission over public utilities or electric utilities.
History. — s. 4, ch. 2024-186.
366.043 Large load tariffs for public electric utilities.
(1) The Legislature finds that the provision of safe and reliable electric services, provided at fair, just, and reasonable rates, is essential to the welfare of the ratepayers of this state. The Legislature further finds that when one class of electric service customer requires uniquely large electrical loads at a single location, it imposes a disproportionate risk on the other ratepayers of this state and makes it necessary for the commission to develop and enforce rate structures and other policies for such customers which ensure such risk is mitigated as much as possible and prevent shifting the costs of serving large load customers to the general body of ratepayers.
(2) As used in this section, the term:
(a) “Controlled by” means having the power to direct or cause the direction of the management or policies of a company, whether through ownership of securities, by contract, or otherwise. A person or an entity that directly or indirectly has the right to vote 25 percent or more of the voting interests of the company or that is entitled to 25 percent or more of its profits is presumed to control the entity.
(b) “Foreign country of concern” has the same meaning as in s. 692.201.
(c) “Foreign entity” means an entity that is:
1. Owned or controlled by the government of a foreign country of concern; or
2. A partnership, an association, a corporation, an organization, or other combination of persons organized under the laws of or having its principal place of business in a foreign country of concern, or a subsidiary of such entity.
(d) “Large load customer” means a customer with an anticipated monthly peak load of 50 megawatts or more, calculated as the highest average load over a 15-minute interval at a single location. The term does not include a load aggregated across multiple locations owned by the same customer. However, the term includes all customers or other entities that have entered into a colocation or similar agreement at a single location that otherwise meets the anticipated monthly peak load provided in this paragraph.
(e) “Public utility” has the same meaning as in s. 366.02, except that the term does not include a gas utility.
(3) The following minimum tariff and service requirements for large load customers are required in public utility tariffs:
(a) The minimum tariff and service requirements must reasonably ensure that each large load customer bears its own full cost of service and that such cost is not shifted to the general body of ratepayers. Such cost of service includes, but is not limited to, connection, incremental transmission, incremental generation, and other infrastructure costs; operations and maintenance expenses; and any other costs required to serve a large load customer. The risk of nonpayment of such costs may not be borne by the general body of ratepayers.
(b) The minimum tariff and service requirements must include provisions reasonably designed to prevent a public utility from providing electric service to a customer that would otherwise qualify as a large load customer if that customer is a foreign entity.
(4) A customer may not separate an electrical load at a single location into multiple smaller connections to avoid being classified as a large load customer.
(5) To effectuate the requirements of subsection (3), the commission may approve public utility tariffs that include utility industry-accepted ratemaking and other financial tools, including, but not limited to, the following:
(a) Contributions in aid of construction or other required customer infrastructure investments that may be returned, in whole or in part, to such customers over time.
(b) Demand charges, including minimum demand charges.
(c) Incremental generation charges.
(d) Financial guarantees.
(e) Minimum load factors.
(f) Take-or-pay provisions or similar provisions requiring payment for contracted capacity, regardless of a large load customer’s actual electricity use or demand.
(g) Minimum period of service contract requirements, including early termination fees or other fees for violation of such contracts.
(6) Any tariff, contractual provision, service requirement, or other public utility policy relating to large load customers may not prevent or otherwise hinder the curtailment or interruption of electric service to a large load customer where such curtailment or interruption is intended to ensure grid stability, reduce the likelihood or breadth of wider service outages, or ensure public safety during an emergency or other exceptional circumstance.
(7) A public utility may not knowingly provide electric service to a customer that would otherwise qualify as a large load customer if that customer is a foreign entity.
(8) No later than October 1, 2026, each public utility shall file, for commission approval, a tariff that complies with this section.
History. — s. 3, ch. 2026-65.
366.05 Powers.
(1)(a) In the exercise of such jurisdiction, the commission shall have power to prescribe fair and reasonable rates and charges, classifications, standards of quality and measurements, including the ability to adopt construction standards that exceed the National Electrical Safety Code, for purposes of ensuring the reliable provision of service, and service rules and regulations to be observed by each public utility; to require repairs, improvements, additions, replacements, and extensions to the plant and equipment of any public utility when reasonably necessary to promote the convenience and welfare of the public and secure adequate service or facilities for those reasonably entitled thereto; to employ and fix the compensation for such examiners and technical, legal, and clerical employees as it deems necessary to carry out the provisions of this chapter; and to adopt rules pursuant to ss. 120.536(1) and 120.54 to implement and enforce the provisions of this chapter.
(b) If the commission authorizes a public utility to charge tiered rates based upon levels of usage and to vary its regular billing period, the utility may not charge a customer a higher rate because of an increase in usage attributable to an extension of the billing period; however, the regular meter reading date may not be advanced or postponed more than 5 days for routine operating reasons without prorating the billing for the period.
(c) Effective January 1, 2016, a utility may not charge or receive a deposit in excess of the following amounts:
1. For an existing account, the total deposit may not exceed 2 months of average actual charges, calculated by adding the monthly charges from the 12-month period immediately before the date any change in the deposit amount is sought, dividing this total by 12, and multiplying the result by 2. If the account has less than 12 months of actual charges, the deposit shall be calculated by adding the available monthly charges, dividing this total by the number of months available, and multiplying the result by 2.
2. For a new service request, the total deposit may not exceed 2 months of projected charges, calculated by adding the 12 months of projected charges, dividing this total by 12, and multiplying the result by 2. Once a new customer has had continuous service for a 12-month period, the amount of the deposit shall be recalculated using actual data. Any difference between the projected and actual amounts must be resolved by the customer paying any additional amount that may be billed by the utility or the utility returning any overcharge.
(d) If a utility has more than one rate for any customer class, it must notify each customer in that class of the available rates and explain how the rate is charged to the customer. If a customer contacts the utility seeking assistance in selecting the most advantageous rate, the utility must provide good faith assistance to the customer. The customer is responsible for charges for service provided under the selected rate.
(e) New tariffs and changes to an existing tariff, other than an administrative change that does not substantially change the meaning or operation of the tariff, must be approved by majority vote of the commission, except as otherwise specifically provided by law.
(2) Every public utility, as defined in s. 366.02, which in addition to the production, transmission, delivery or furnishing of heat, light, or power also sells appliances or other merchandise shall keep separate and individual accounts for the sale and profit deriving from such sales. No profit or loss shall be taken into consideration by the commission from the sale of such items in arriving at any rate to be charged for service by any public utility.
(3) The commission shall provide for the examination and testing of all meters used for measuring any product or service of a public utility.
(4) Any consumer or user may have any such meter tested upon payment of the fees fixed by the commission.
(5) The commission shall establish reasonable fees to be paid for testing such meters on the request of the consumers or users, the fee to be paid by the consumer or user at the time of his or her request, but to be paid by the public utility and repaid to the consumer or user if the meter is found defective or incorrect to the disadvantage of the consumer or user, in excess of the degree or amount of tolerance customarily allowed for such meters, or as may be provided for in rules and regulations of the commission.
(6) The commission may purchase materials, apparatus, and standard measuring instruments for such examination and tests.
(7) The commission shall have the power to require reports from all electric utilities to assure the development of adequate and reliable energy grids.
(8) If the commission determines that there is probable cause to believe that inadequacies exist with respect to the energy grids developed by the electric utility industry, including inadequacies in fuel diversity or fuel supply reliability, it shall have the power, after proceedings as provided by law, and after a finding that mutual benefits will accrue to the electric utilities involved, to require installation or repair of necessary facilities, including generating plants and transmission facilities, with the costs to be distributed in proportion to the benefits received, and to take all necessary steps to ensure compliance. The electric utilities involved in any action taken or orders issued pursuant to this subsection shall have full power and authority, notwithstanding any general or special laws to the contrary, to jointly plan, finance, build, operate, or lease generating and transmission facilities and shall be further authorized to exercise the powers granted to corporations in chapter 361. This subsection shall not supersede or control any provision of the Florida Electrical Power Plant Siting Act, ss. 403.501-403.518.
(9) The commission may require the filing of reports and other data by a public utility or its affiliated companies, including its parent company, regarding transactions, or allocations of common costs, among the utility and such affiliated companies. The commission may also require such reports or other data necessary to ensure that a utility’s ratepayers do not subsidize nonutility activities.
(10) The Legislature finds that violations of commission orders or rules, in connection with the impairment of a public utility’s operations or service, constitute irreparable harm for which there is no adequate remedy at law. The commission is authorized to seek relief in circuit court including temporary and permanent injunctions, restraining orders, or any other appropriate order. Such remedies shall be in addition to and supplementary to any other remedies available for enforcement of agency action under s. 120.69 or the provisions of this chapter. The commission shall establish procedures implementing this section by rule.
(11) The commission has the authority to assess a public utility for reasonable travel costs associated with reviewing the records of the public utility and its affiliates when such records are kept out of state. The public utility may bring the records back into the state for review.
History. — s. 5, ch. 26545, 1951; s. 2, ch. 74-196; s. 3, ch. 76-168; s. 1, ch. 77-457; s. 53, ch. 78-95; ss. 5, 16, ch. 80-35; s. 1, ch. 81-131; s. 2, ch. 81-318; ss. 4, 20, 22, ch. 89-292; s. 51, ch. 90-331; s. 4, ch. 91-429; s. 3, ch. 93-35; s. 552, ch. 95-148; s. 72, ch. 98-200; s. 17, ch. 2006-230; s. 5, ch. 2015-129.
366.051 Cogeneration; small power production; commission jurisdiction.
Electricity produced by cogeneration and small power production is of benefit to the public when included as part of the total energy supply of the entire electric grid of the state or consumed by a cogenerator or small power producer. The electric utility in whose service area a cogenerator or small power producer is located shall purchase, in accordance with applicable law, all electricity offered for sale by such cogenerator or small power producer; or the cogenerator or small power producer may sell such electricity to any other electric utility in the state. The commission shall establish guidelines relating to the purchase of power or energy by public utilities from cogenerators or small power producers and may set rates at which a public utility must purchase power or energy from a cogenerator or small power producer. In fixing rates for power purchased by public utilities from cogenerators or small power producers, the commission shall authorize a rate equal to the purchasing utility’s full avoided costs. A utility’s “full avoided costs” are the incremental costs to the utility of the electric energy or capacity, or both, which, but for the purchase from cogenerators or small power producers, such utility would generate itself or purchase from another source. The commission may use a statewide avoided unit when setting full avoided capacity costs. If the cogenerator or small power producer provides adequate security, based on its financial stability, and no costs in excess of full avoided costs are likely to be incurred by the electric utility over the term during which electricity is to be provided, the commission shall authorize the levelization of payments and the elimination of discounts due to risk factors in determining the rates. Public utilities shall provide transmission or distribution service to enable a retail customer to transmit electrical power generated by the customer at one location to the customer’s facilities at another location, if the commission finds that the provision of this service, and the charges, terms, and other conditions associated with the provision of this service, are not likely to result in higher cost electric service to the utility’s general body of retail and wholesale customers or adversely affect the adequacy or reliability of electric service to all customers. Notwithstanding any other provision of law, power generated by the customer and provided by the utility to the customers’ facility at another location is subject to the gross receipts tax imposed under s. 203.01 and the use tax imposed under s. 212.06. Such taxes shall apply at the time the power is provided at such other location and shall be based upon the cost price of such power as provided in s. 212.06(1)(b).
History. — ss. 5, 22, ch. 89-292; s. 4, ch. 91-429.
366.055 Availability of, and payment for, energy reserves.
(1) Energy reserves of all utilities in the Florida energy grid shall be available at all times to ensure that grid reliability and integrity are maintained. The commission is authorized to take such action as is necessary to assure compliance. However, prior commitments as to energy use:
(a) In interstate commerce, as approved by the Federal Energy Regulatory Commission;
(b) Between one electric utility and another, which have been approved by the Federal Energy Regulatory Commission; or
(c) Between an electric utility which is a part of the energy grid created herein and another energy grid
shall not be abridged or altered except during an energy emergency as declared by the Governor and Cabinet.
(2)(a) When the energy produced by one electric utility is transferred to another or others through the energy grid and under the powers granted by this section, the commission shall direct the appropriate recipient utility or utilities to reimburse the producing utility in accordance with the latest wholesale electric rates approved for the producing utility by the Federal Energy Regulatory Commission for such purposes.
(b) Any utility which provides a portion of those transmission facilities involved in the transfer of energy from a producing utility to a recipient utility or utilities shall be entitled to receive an appropriate reimbursement commensurate with the transmission facilities and services provided. However, no utility shall be required to sell purchased power to a recipient utility or utilities at a rate lower than the rate at which the power is purchased from a producing utility.
(3) To assure efficient and reliable operation of a state energy grid, the commission shall have the power to require any electric utility to transmit electrical energy over its transmission lines from one utility to another or as a part of the total energy supply of the entire grid, subject to the provisions hereof.
History. — s. 3, ch. 74-196; s. 3, ch. 76-168; s. 1, ch. 77-457; ss. 6, 16, ch. 80-35; s. 2, ch. 81-318; ss. 20, 22, ch. 89-292; s. 4, ch. 91-429.
366.057 Retirement of electrical power plants.
A public utility shall provide notice to the commission at least 90 days before the full retirement of an electrical power plant if the date of such retirement does not coincide with the retirement date in the public utility’s most recently approved depreciation study. No later than 90 days after such notice, the commission may schedule a hearing to determine whether retirement of the plant is prudent and consistent with the state’s energy policy goals in s. 377.601(2). At a hearing scheduled under this section, the utility shall present its proposed retirement date for the plant, remaining depreciation expense on the plant, any other costs to be recovered in relation to the plant, and any planned replacement capacity.
History. — s. 5, ch. 2024-186.
366.06 Rates; procedure for fixing and changing.
(1) A public utility shall not, directly or indirectly, charge or receive any rate not on file with the commission for the particular class of service involved, and no change shall be made in any schedule. All applications for changes in rates shall be made to the commission in writing under rules and regulations prescribed, and the commission shall have the authority to determine and fix fair, just, and reasonable rates that may be requested, demanded, charged, or collected by any public utility for its service. The commission shall investigate and determine the actual legitimate costs of the property of each utility company, actually used and useful in the public service, and shall keep a current record of the net investment of each public utility company in such property which value, as determined by the commission, shall be used for ratemaking purposes and shall be the money honestly and prudently invested by the public utility company in such property used and useful in serving the public, less accrued depreciation, and shall not include any goodwill or going-concern value or franchise value in excess of payment made therefor. In fixing fair, just, and reasonable rates for each customer class, the commission shall, to the extent practicable, consider the cost of providing service to the class, as well as the rate history, value of service, and experience of the public utility; the consumption and load characteristics of the various classes of customers; and public acceptance of rate structures.
(2) Whenever the commission finds, upon request made or upon its own motion, that the rates demanded, charged, or collected by any public utility for public utility service, or that the rules, regulations, or practices of any public utility affecting such rates, are unjust, unreasonable, unjustly discriminatory, or in violation of law; that such rates are insufficient to yield reasonable compensation for the services rendered; that such rates yield excessive compensation for services rendered; or that such service is inadequate or cannot be obtained, the commission shall order and hold a public hearing, giving notice to the public and to the public utility, and shall thereafter determine just and reasonable rates to be thereafter charged for such service and promulgate rules and regulations affecting equipment, facilities, and service to be thereafter installed, furnished, and used.
(3) Pending a final order by the commission in any rate proceeding under this section, the commission may withhold consent to the operation of all or any portion of the new rate schedules, delivering to the utility requesting such increase, within 60 days, a reason or written statement of good cause for withholding its consent. Such consent shall not be withheld for a period longer than 8 months from the date of filing the new schedules. The new rates or any portion not consented to shall go into effect under bond or corporate undertaking at the end of such period, but the commission shall, by order, require such public utility to keep accurate account in detail of all amounts received by reason of such increase, specifying by whom and in whose behalf such amounts were paid and, upon completion of hearing and final decision in such proceeding, shall by further order require such public utility to refund with interest at a fair rate, to be determined by the commission in such manner as it may direct, such portion of the increased rate or charge as by its decision shall be found not justified. Any portion of such refund not thus refunded to patrons or customers of the public utility shall be refunded or disposed of by the public utility as the commission may direct; however, no such funds shall accrue to the benefit of the public utility. The commission shall take final commission action in the docket and enter its final order within 12 months of the commencement date for final agency action. As used in this subsection, the “commencement date for final agency action” means the date upon which it has been determined by the commission or its designee that the utility has filed with the clerk the minimum filing requirements as established by rule of the commission. Within 30 days after receipt of the application, rate request, or other written document for which the commencement date for final agency action is to be established, the commission or its designee shall either determine the commencement date for final agency action or issue a statement of deficiencies to the applicant, specifically listing why said applicant has failed to meet the minimum filing requirements. Such statement of deficiencies shall be binding upon the commission to the extent that, once the deficiencies in the statement are satisfied, the commencement date for final agency action shall be promptly established as provided herein. Thereafter, within 15 days after the applicant indicates to the commission that it believes that it has met the minimum filing requirements, the commission or its designee shall either determine the commencement date for final agency action or specifically enumerate in writing why the requirements have not been met, in which case this procedure shall be repeated until the commencement date for final agency action is established. When the commission initiates a proceeding, the commencement date for final agency action shall be the date upon which the order initiating the proceeding is issued.
(4) A natural gas utility or a public electric utility whose annual sales to end-use customers amount to less than 1,000 gigawatt hours may specifically request the commission to process its petition for rate relief using the agency’s proposed agency action procedure, as prescribed by commission rule. The commission shall enter its vote on the proposed agency action within 5 months of the commencement date for final agency action. If the commission’s proposed action is protested, the final decision must be rendered by the commission within 8 months after the date the protest is filed. At the expiration of 5 months following the commencement date for final agency action, if the commission has not taken action or if the commission’s action is protested by a party other than the utility, the utility may place its requested rates into effect under bond, escrow, or corporate undertaking subject to refund, upon notice to the commission and upon filing the appropriate tariffs. The utility must keep accurate records of amounts received as provided by subsection (3).
History. — s. 6, ch. 26545, 1951; s. 4, ch. 74-195; s. 3, ch. 76-168; s. 1, ch. 77-457; ss. 7, 16, ch. 80-35; s. 2, ch. 81-318; ss. 8, 20, 22, ch. 89-292; s. 4, ch. 91-429; s. 5, ch. 93-35; s. 5, ch. 95-328; s. 1, ch. 2022-74.
366.07 Rates; adjustment.
Whenever the commission, after public hearing either upon its own motion or upon complaint, shall find the rates, rentals, charges or classifications, or any of them, proposed, demanded, observed, charged or collected by any public utility for any service, or in connection therewith, or the rules, regulations, measurements, practices or contracts, or any of them, relating thereto, are unjust, unreasonable, insufficient, excessive, or unjustly discriminatory or preferential, or in anywise in violation of law, or any service is inadequate or cannot be obtained, the commission shall determine and by order fix the fair and reasonable rates, rentals, charges or classifications, and reasonable rules, regulations, measurements, practices, contracts or service, to be imposed, observed, furnished or followed in the future.
History. — s. 7, ch. 26545, 1951; s. 24, ch. 57-1; s. 3, ch. 76-168; s. 1, ch. 77-457; s. 16, ch. 80-35; s. 2, ch. 81-318; ss. 9, 20, 22, ch. 89-292; s. 4, ch. 91-429.
366.071 Interim rates; procedure.
(1) The commission may, during any proceeding for a change of rates, upon its own motion, or upon petition from any party, or by a tariff filing of a public utility, authorize the collection of interim rates until the effective date of the final order. Such interim rates may be based upon a test period different from the test period used in the request for permanent rate relief. To establish a prima facie entitlement for interim relief, the commission, the petitioning party, or the public utility shall demonstrate that the public utility is earning outside the range of reasonableness on rate of return calculated in accordance with subsection (5).
(2)(a) In a proceeding for an interim increase in rates, the commission shall authorize, within 60 days of the filing for such relief, the collection of rates sufficient to earn the minimum of the range of rate of return calculated in accordance with subparagraph (5)(b)2. The difference between