LEGALDIGMLEGALDIGM
    ← Florida statutes
    Beta
    Fla. Stat. ch. 161

    CHAPTER 161

    Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Always check the official source for the current text.

    161.011 Short title. Parts I and II of this chapter may be known and cited as the “Dennis L. Jones Beach and Shore Preservation Act.” History. — s. 1, ch. 65-408; s. 1, ch. 2012-65. 161.021 Definitions. In construing these statutes, where the context does not clearly indicate otherwise, the word, phrase, or term: (1) “Access” or “public access” as used in ss. 161.041, 161.052, and 161.053 means the public’s right to laterally traverse the sandy beaches of this state where such access exists on or after July 1, 1987, or where the public has established an accessway through private lands to lands seaward of the mean high tide or water line by prescription, prescriptive easement, or any other legal means, development or construction shall not interfere with such right of public access unless a comparable alternative accessway is provided. (2) “Beach and shore preservation,” “erosion control, beach preservation and hurricane protection,” “beach erosion control” and “erosion control” includes, but is not limited to, erosion control, hurricane protection, coastal flood control, shoreline and offshore rehabilitation, and regulation of work and activities likely to affect the physical condition of the beach or shore. (3) “Beach nourishment” means the maintenance of a restored beach by the replacement of sand. (4) “Beach restoration” means the placement of sand on an eroded beach for the purposes of restoring it as a recreational beach and providing storm protection for upland properties. (5) “Board of trustees” means the Board of Trustees of the Internal Improvement Trust Fund. (6) “Coastal construction” includes any work or activity which is likely to have a material physical effect on existing coastal conditions or natural shore and inlet processes. (7) “Department” means the Department of Environmental Protection. (8) “Emergency” means any unusual incident resulting from natural or unnatural causes which endangers the health, safety, or resources of the residents of the state, including damages or erosion to any shoreline resulting from a hurricane, storm, or other such violent disturbance. (9) “Inlet sediment bypassing” includes any transfer of sediment from an inlet or beach to another stretch of beach for the purpose of nourishment and beach erosion control. (10) “Local government” means a county, municipality, community development district, or independent special taxing district. History. — s. 1, ch. 65-408; ss. 25, 35, ch. 69-106; s. 43, ch. 71-377; s. 1, ch. 78-257; s. 1, ch. 86-138; s. 11, ch. 87-97; s. 17, ch. 94-356; s. 2, ch. 2000-346; s. 1, ch. 2007-99. 161.031 Personnel and facilities. The Department of Environmental Protection may call to its assistance temporarily, any engineer or other employee in any state agency or department or in the University of Florida or other educational institution financed wholly or in part by the state, for the purpose of devising the most effective and economical method of averting and preventing erosion, hurricane, and storm damages. These employees shall not receive additional compensation, except for actual necessary expenses incurred while working under the direction of the department. History. — s. 1, ch. 65-408; ss. 25, 35, ch. 69-106; s. 18, ch. 94-356; s. 4, ch. 2000-197. 161.041 Permits required. (1) If a person, firm, corporation, county, municipality, township, special district, or public agency desires to make any coastal construction or reconstruction or change of existing structures, or any construction or physical activity undertaken specifically for shore protection purposes, or other structures and physical activity including groins, jetties, moles, breakwaters, seawalls, revetments, artificial nourishment, inlet sediment bypassing, excavation or maintenance dredging of inlet channels, or other deposition or removal of beach material, or construction of other structures of a solid or highly impermeable design upon state sovereignty lands below the mean high-water line of any tidal water of the state, a coastal construction permit must be obtained from the department before the commencement of such work. The department may exempt interior tidal waters of the state from the permit requirements of this section. (a) Except during construction, such development may not interfere with the public use of any area of a beach seaward of the mean high-water line unless the department determines that the interference is unavoidable for purposes of protecting the beach or an endangered upland structure. As a condition of granting permits under this section, the department may require the provision of alternative access if interference with public access along the beach is unavoidable. The width of such alternate access may not be required to exceed the width of the access that will be obstructed as a result of the permit being granted. (b) Except for the deepwater ports identified in s. 403.021(9)(b), the department shall not issue a permit for the construction of a coastal inlet jetty or the excavation or maintenance of such an inlet if the activity authorized by the permit will have a significant adverse impact on the sandy beaches of this state without a mitigation program approved by the department. In evaluating the mitigation program, the department shall consider the benefits of the long-term sand management plan of the permittee and the overall public benefits of the inlet activity. (2) The department may authorize an excavation or erection of a structure at any coastal location upon receipt of an application from a property or riparian owner and upon consideration of facts and circumstances, including: (a) Adequate engineering data concerning inlet and shoreline stability and storm tides related to shoreline topography; (b) Design features of the proposed structures or activities; and (c) Potential effects of the location of such structures or activities, including potential cumulative effects of any proposed structures or activities upon such beach-dune system or coastal inlet, which, in the opinion of the department, clearly justify such permit. (3) The department may require engineer certifications as necessary to assure the adequacy of the design and construction of permitted projects. Reasonable assurance is demonstrated if the permit applicant provides competent substantial evidence based on plans, studies, and credible expertise that accounts for naturally occurring variables that might reasonably be expected. (4) The department may, as a condition to granting a permit under this section, require mitigation, financial, or other assurances acceptable to the department as necessary to assure performance of the conditions of a permit or enter into contractual agreements to best assure compliance with any permit conditions. Biological and environmental monitoring conditions included in the permit must be based upon clearly defined scientific principles. The department may also require notice of the required permit conditions and the contractual agreements entered into pursuant to this subsection to be filed in the public records of the county in which the permitted activity is located. (5) Notwithstanding any other provision of law, the department may issue a permit pursuant to this part in advance of the issuance of an incidental take authorization as provided under the Endangered Species Act and its implementing regulations if the permit and authorization include a condition requiring that such authorized activities not begin until the incidental take authorization is issued. (6) The department shall adopt rules to address standard mixing zone criteria and antidegradation requirements for turbidity generation for beach management and inlet bypassing permits that involve the excavation and placement of sediment in order to reduce or eliminate the need for variances. In processing variance requests, the department must consider the legislative declaration that, pursuant to s. 161.088, beach nourishment projects are in the public interest. (7) Application for permits shall be made to the department upon such terms and conditions as set forth by rule. (a) If, as part of the permit process, the department requests additional information, it must cite applicable statutory and rule provisions that justify any item listed in a request for additional information. (b) The department may not issue guidelines that are enforceable as standards for beach management, inlet management, and other erosion control projects without adopting such guidelines by rule. (8) The Legislature intends to simplify and expedite the permitting process for the periodic maintenance of previously permitted and constructed beach nourishment and inlet management projects under the joint coastal permit process. A detailed review of a previously permitted project is not required if there have been no substantial changes in project scope and past performance of the project indicates that the project has performed according to design expectations. The department shall amend chapters 62B-41 and 62B-49, Florida Administrative Code, to streamline the permitting process for periodic beach maintenance projects and inlet sand bypassing activities. (9) Joint coastal permits issued for activities falling under this section and part IV of chapter 373 must allow for two maintenance or dredging disposal events or a permit life of 15 years, whichever is greater. History. — s. 1, ch. 65-408; ss. 25, 35, ch. 69-106; s. 2, ch. 78-257; s. 1, ch. 83-247; s. 12, ch. 87-97; s. 19, ch. 94-356; s. 3, ch. 2000-346; s. 2, ch. 2012-65; s. 2, ch. 2012-205. 161.0415 Citation of rule. In addition to any other provisions within this chapter or any rules promulgated hereunder, the permitting agency shall, when requesting information for a permit application pursuant to this chapter or such rules promulgated hereunder, cite a specific rule or provision of the Florida Building Code. If a request for information cannot be accompanied by a rule citation, failure to provide such information cannot be grounds to deny a permit. History. — s. 1, ch. 79-161; s. 4, ch. 2000-141; s. 34, ch. 2001-186; s. 3, ch. 2001-372. 161.042 Coastal construction and excavation in barrier beach inlets. The department is authorized to direct any person, or any public body or agency, responsible for the excavation of sandy sediment as a result of any activity conducted to maintain navigable depths within or immediately adjacent to any coastal barrier beach inlet within sovereignty lands, after the department considers any limitations under chapters 253 and 403 on the deposition of spoil material from the excavation, and upon issuance of water quality certification by the department, to use such sediment for beach nourishment as prescribed by the department. For any construction or excavation within or immediately contiguous to any coastal barrier beach inlet which has been permitted pursuant to s. 161.041, the department may require the permittee to supply beach profiles and conduct hydrographic monitoring of the impacted area. History. — s. 3, ch. 78-257; s. 1, ch. 80-183; s. 20, ch. 94-356; s. 4, ch. 2000-346. 161.051 Coastal construction by persons, firms, corporations, or local authorities. Where any person, firm, corporation, county, municipality, township, special district, or any public agency shall construct and install projects when permits have been properly issued, such works and improvements shall be the property of said person, firm, corporation, county, municipality, township, special district, or any public agency where located, and shall thereafter be maintained by and at the expense of said person, firm, corporation, county, municipality, township, special district, or other public agency. No grant under this section shall affect title of the state to any lands below the mean high-water mark, and any additions or accretions to the upland caused by erection of such works or improvement shall remain the property of the state if not previously conveyed. The state shall in no way be liable for any damages as a result of erections of such works and improvements, or for any damages arising out of construction, reconstruction, maintenance, or repair thereof, or otherwise arising on account of such works or improvements. History. — s. 1, ch. 65-408. 161.052 Coastal construction and excavation; regulation. (1) No person, firm, corporation, municipality, county, or other public agency shall excavate or construct any dwelling house, hotel, motel, apartment building, seawall, revetment, or other structure incidental to or related to such structure, including but not limited to such attendant structures or facilities as a patio, swimming pool, or garage, within 50 feet of the line of mean high water at any riparian coastal location fronting the Gulf of America or Atlantic coast shoreline of the state, exclusive of bays, inlets, rivers, bayous, creeks, passes, and the like. In areas where an erosion control line has been established under the provisions of ss. 161.141-161.211, that line, or the presently existing mean high-water line, whichever is more landward, shall be considered to be the mean high-water line for the purposes of this section. (2) A waiver or variance of the setback requirements may be authorized by the department in the following circumstances: (a) The department may authorize an excavation or erection of a structure at any riparian coastal location as described in subsection (1) upon receipt of an application from a riparian owner and upon the consideration of facts and circumstances, including adequate engineering data concerning shoreline stability and storm tides related to shoreline topography, which, in the opinion of the department, clearly and unequivocally justify such a waiver or variance. (b) If in the immediate contiguous or adjacent area a number of existing structures have established a reasonably continuous and uniform construction line closer to the line of mean high water than the foregoing, and if said existing structures have not been unduly affected by erosion, a proposed structure may be permitted along such line on written authorization from the department if such proposed structure complies with the Florida Building Code and the rules of the department. However, the department shall not contravene setback requirements established by a county or municipality which are equal to, or more strict than, those setback requirements provided herein. (c) The department may authorize the construction of pipelines or piers extending outward from the shoreline, unless it determines that the construction of such projects would cause erosion of the beach in the area of such structures. (3) The provisions of this section shall not apply to structures intended for shore protection purposes which are regulated by s. 161.041 or to structures existing or under construction on June 27, 1970. (4) The department may by regulation exempt specifically described portions of the coastline from the provisions of this section whenever in its judgment such portions of coastline, because of their nature, are not subject to erosion of a substantially damaging effect to the public. (5) The setback requirements as defined herein shall not apply to any riparian coastal locations fronting the Atlantic Ocean or Gulf of America which have vegetation-type nonsandy shores. (6) The setback requirements defined in subsection (1) shall not apply to any modification, maintenance, or repair to any existing structure within limits of the existing foundation which does not require, involve, or include any additions to, or repair or modification of, the existing foundation of that structure. Specifically excluded from this exemption are seawalls and any additions or enclosures added, constructed, or installed below the first dwelling floor or lowest deck of the existing structure. (7) Any coastal structure erected, or excavation created, in violation of the provisions of this section is hereby declared to be a public nuisance, and such structure shall be forthwith removed or such excavation refilled after written notice by the department directing such removal or filling. In the event that the structure is not removed or the excavation refilled as directed within a reasonable time, the department may remove such structure or fill such excavation at its own expense. The cost thereof shall become a lien upon the property of the upland owner upon which such unauthorized structure or excavation is located. (8) Any person violating any provision of this section is guilty of a misdemeanor of the first degree, punishable as provided in s. 775.083. Such person shall be deemed guilty of a separate offense for each month during any portion of which any violation of this section is committed or continued. (9) The secretary of the department may make recommendations to the Board of Trustees of the Internal Improvement Trust Fund concerning the purchase of the fee or any lesser interest in any lands seaward of the setback requirement as environmentally endangered lands or as outdoor recreation lands. (10) A coastal county or municipality fronting on the Gulf of America or the Atlantic Ocean shall advise the department within 5 days after receipt of any permit application for construction or other activities proposed to be located within 50 feet of the line of mean high water. Within 5 days after receipt of such application, the county or municipality shall notify the applicant of the requirements for state permits. (11) The department is authorized to adopt rules for the implementation of the following provisions of this section: excavation and construction; setback requirements; waivers or variances; exemptions; the removal of unauthorized structures or refilling of unauthorized excavations; and violations and penalties. (12) In accordance with ss. 553.73 and 553.79, and upon the effective date of the Florida Building Code, the provisions of this section which pertain to and govern the design, construction, erection, alteration, modification, repair, and demolition of public and private buildings, structures, and facilities shall be incorporated into the Florida Building Code. The Florida Building Commission shall have the authority to adopt rules pursuant to ss. 120.536 and 120.54 in order to implement those provisions. This subsection does not limit or abrogate the right and authority of the department to require permits or to adopt and enforce environmental standards, including but not limited to, standards for ensuring the protection of the beach-dune system, proposed or existing structures, adjacent properties, marine turtles, native salt-resistant vegetation, endangered plant communities, and the preservation of public beach access. History. — s. 1, ch. 70-231; s. 82, ch. 71-136; s. 1, ch. 75-87; s. 4, ch. 78-257; s. 2, ch. 80-183; s. 66, ch. 81-259; s. 21, ch. 94-356; s. 1, ch. 98-131; s. 5, ch. 2000-141; s. 34, ch. 2001-186; s. 3, ch. 2001-372; s. 24, ch. 2025-8. 161.053 Coastal construction and excavation; regulation on county basis. (1)(a) The Legislature finds and declares that the beaches in this state and the coastal barrier dunes adjacent to such beaches, by their nature, are subject to frequent and severe fluctuations and represent one of the most valuable natural resources of Florida and that it is in the public interest to preserve and protect them from imprudent construction which can jeopardize the stability of the beach-dune system, accelerate erosion, provide inadequate protection to upland structures, endanger adjacent properties, or interfere with public beach access. In furtherance of these findings, it is the intent of the Legislature to provide that the department establish coastal construction control lines on a county basis along the sand beaches of the state fronting on the Atlantic Ocean, the Gulf of America, or the Straits of Florida. Such lines shall be established so as to define that portion of the beach-dune system which is subject to severe fluctuations based on a 100-year storm surge, storm waves, or other predictable weather conditions. However, the department may establish a segment or segments of a coastal construction control line further landward than the impact zone of a 100-year storm surge, provided such segment or segments do not extend beyond the landward toe of the coastal barrier dune structure that intercepts the 100-year storm surge. Such segment or segments shall not be established if adequate dune protection is provided by a state-approved dune management plan. Special siting and design considerations shall be necessary seaward of established coastal construction control lines to ensure the protection of the beach-dune system, proposed or existing structures, and adjacent properties and the preservation of public beach access. (b) As used in this subsection: 1. When establishing coastal construction control lines as provided in this section, the definition of “sand beach” shall be expanded to include coastal barrier island ends contiguous to the sand beaches of the state fronting on the Atlantic Ocean, the Gulf of America, or the Straits of Florida. 2. “Coastal barrier island ends” means those areas on the ends of barrier islands fronting the Atlantic Ocean, the Gulf of America, or the Straits of Florida, which are subject to severe fluctuations based on a 100-year storm surge, storm waves, or other predictable weather conditions. 3. “Coastal barrier islands” means geological features which are completely surrounded by marine waters that front upon the open waters of the Atlantic Ocean, the Gulf of America, or the Straits of Florida and are composed of quartz sands, clays, limestone, oolites, rock, coral, coquina, sediment, or other material, including spoil disposal, which features lie above the line of mean high water. Mainland areas which were separated from the mainland by artificial channelization for the purpose of assisting marine commerce shall not be considered coastal barrier islands. (c) Coastal construction control lines shall be set on coastal barrier island ends only in conjunction with the resetting of the coastal construction control line throughout the entire county within which the barrier island end is located, and shall not be established on reaches of coastal barrier island ends where the shore is vegetated with mangroves. (2)(a) Coastal construction control lines shall be established by the department only after it has been determined from a comprehensive engineering study and topographic survey that the establishment of such control lines is necessary for the protection of upland properties and the control of beach erosion. No such line shall be set until a public hearing has been held in each affected county. After the department has given consideration to the results of such public hearing, it shall, after considering ground elevations in relation to historical storm and hurricane tides, predicted maximum wave uprush, beach and offshore ground contours, the vegetation line, erosion trends, the dune or bluff line, if any exist, and existing upland development, set and establish a coastal construction control line and cause such line to be duly filed in the public records of any county affected and shall furnish the clerk of the circuit court in each county affected a survey of such line with references made to permanently installed monuments at such intervals and locations as may be considered necessary. However, no coastal construction control line shall be set until a public hearing has been held by the department and the affected persons have an opportunity to appear. The hearing shall constitute a public hearing and shall satisfy all requirements for a public hearing pursuant to s. 120.54(3). The hearing shall be noticed in the Florida Administrative Register in the same manner as a rule. Any coastal construction control line adopted pursuant to this section shall not be subject to a s. 120.56(2) rule challenge or a s. 120.54(3)(c)2. drawout proceeding, but, once adopted, shall be subject to a s. 120.56(3) invalidity challenge. The rule shall be adopted by the department and shall become effective upon filing with the Department of State, notwithstanding the provisions of s. 120.54(3)(e)6. Upon such filing with the Department of State, no person, firm, corporation, or governmental agency shall construct any structure whatsoever seaward thereof; make any excavation, remove any beach material, or otherwise alter existing ground elevations; drive any vehicle on, over, or across any sand dune; or damage or cause to be damaged such sand dune or the vegetation growing thereon seaward thereof, except as hereinafter provided. Control lines established under the provisions of this section shall be subject to review at the discretion of the department after consideration of hydrographic and topographic data that indicate shoreline changes that render established coastal construction control lines to be ineffective for the purposes of this act or at the written request of officials of affected counties or municipalities. Any riparian upland owner who feels that such line as established is unduly restrictive or prevents a legitimate use of the owner’s property shall be granted a review of the line upon written request. After such review, the department shall decide if a change in the control line as established is justified and shall so notify the person or persons making the request. The decision of the department shall be subject to judicial review as provided in chapter 120. (b)1. The department shall exempt construction proposed for a location seaward of a coastal construction control line and landward of existing armoring from certain siting and design criteria of this chapter, provided the armoring is capable of protecting the proposed construction from the effects of erosion from a 100-year storm surge. The exemption shall apply to proposed structures involving the foundation, siting, and excavation criteria of this section, except such structures shall be: a. Sited a sufficient distance landward of the armoring to allow for maintenance of the armoring. b. Located up to or landward of the established line of construction. c. Designed to comply with the windload requirements of this section. d. Sited and designed to protect marine turtles. 2. The applicant shall provide scientific and engineering evidence that the armoring has been designed, constructed, and maintained to survive the effects of the design storm and provide protection to existing and proposed structures from the erosion associated with that event. Evidence shall include a report with data and supporting analysis, and shall be certified by a professional engineer registered in this state, that the armoring was designed and constructed and is in adequate condition to meet the following criteria: a. The top must be at or above the still water level, including setup, for the design storm plus the breaking wave calculated at its highest achievable level based on the maximum eroded beach profile and highest surge level combination, and must be high enough to preclude runup overtopping. b. The armoring must be stable under the design storm including maximum localized scour, with adequate penetration and toe protection to avoid settlement, toe failure, or loss of material from beneath or behind the armoring. c. The armoring must have sufficient continuity or return walls to prevent flanking under the design storm from impacting the proposed construction. d. The armoring must withstand the static and hydrodynamic forces of the design storm. (3) A coastal county or coastal municipality may establish coastal construction zoning and building codes in lieu of the provisions of this section if such zones and codes are approved by the department as being adequate to preserve and protect the beaches and coastal barrier dunes adjacent to such beaches, which are under the jurisdiction of the department, from imprudent construction that will jeopardize the stability of the beach-dune system, accelerate erosion, provide inadequate protection to upland structures, endanger adjacent properties, or interfere with public beach access. Exceptions to locally established coastal construction zoning and building codes may not be granted unless previously approved by the department. The intent of this subsection is to provide for the local administration of established coastal construction control lines through approved zoning and building codes if desired by local interests and where such local interests have, in the judgment of the department, sufficient funds and personnel to adequately administer the program. Should the department determine at any time that the program is inadequately administered, the department may revoke the authority granted to the county or municipality. (4) Except in those areas where local zoning and building codes have been established pursuant to subsection (3), a permit to alter, excavate, or construct on property seaward of established coastal construction control lines may be granted by the department as follows: (a) The department may authorize an excavation or erection of a structure at any coastal location as described in subsection (1) upon receipt of an application from a property or riparian owner and upon the consideration of facts and circumstances, including: 1. Adequate engineering data concerning shoreline stability and storm tides related to shoreline topography; 2. Design features of the proposed structures or activities; and 3. Potential effects of the location of the structures or activities, including potential cumulative effects of proposed structures or activities upon the beach-dune system, which, in the opinion of the department, clearly justify a permit. (b) If in the immediate contiguous or adjacent area a number of existing structures have established a reasonably continuous and uniform construction line closer to the line of mean high water than the foregoing, and if the existing structures have not been unduly affected by erosion, a proposed structure may be permitted along such line on written authorization from the department if the structure is also approved by the department. However, the department may not contravene setback requirements or zoning or building codes established by a county or municipality which are equal to, or more strict than, the requirements provided in this subsection. This paragraph does not prohibit the department from requiring structures to meet design and siting criteria established in paragraph (a) or in subsection (1) or subsection (2). (c) The department may condition the nature, timing, and sequence of construction of permitted activities to provide protection to nesting sea turtles and hatchlings and their habitat, pursuant to s. 379.2431, and to native salt-resistant vegetation and endangered plant communities. (d) The department may require engineer certifications as necessary to ensure the adequacy of the design and construction of permitted projects. (e) The department shall limit the construction of structures that interfere with public access along the beach. However, the department may require, as a condition of granting permits, the provision of alternative access if interference with public access along the beach is unavoidable. The width of the alternate access may not be required to exceed the width of the access that will be obstructed. (f) The department may, as a condition of granting a permit, require mitigation, financial, or other assurances acceptable to the department to ensure performance of conditions of a permit or enter into contractual agreements to best assure compliance with any permit conditions. The department may also require notice of the permit conditions required and the contractual agreements entered into to be filed in the public records of the county in which the permitted activity is located. (5)(a) As used in this subsection, the term: 1. “Frontal dune” means the first natural or manmade mound or bluff of sand which is located landward of the beach and which has sufficient vegetation, height, continuity, and configuration to offer protective value. 2. “Seasonal high-water line” means the line formed by the intersection of the rising shore and the elevation of 150 percent of the local mean tidal range above local mean high water. (b) After October 1, 1985, and notwithstanding any other provision of this part, the department, or a local government to which the department has delegated permitting authority pursuant to subsections (3) and (15), may not issue a permit for any structure, other than a coastal or shore protection structure, minor structure, or pier, meeting the requirements of this part, or other than intake and discharge structures for a facility sited pursuant to part II of chapter 403, which is proposed for a location that, based on the department’s projections of erosion in the area, will be seaward of the seasonal high-water line within 30 years after the date of application for the permit. The procedures for determining such erosion shall be established by rule. In determining the area that will be seaward of the seasonal high-water line in 30 years, the department may not include any areas landward of a coastal construction control line. (c) If the application of paragraph (b) would preclude the construction of a structure, the department may issue a permit for a single-family dwelling for the parcel if: 1. The parcel was platted or subdivided by metes and bounds before the effective date of this section; 2. The owner of the parcel does not own another parcel immediately adjacent to and landward of the parcel for which the dwelling is proposed; 3. The proposed single-family dwelling is located landward of the frontal dune structure; and 4. The proposed single-family dwelling will be as far landward on its parcel as is practicable without being located seaward of or on the frontal dune. (d) In determining the land areas that will be below the seasonal high-water line within 30 years after the permit application date, the department shall consider the effect on erosion rates of an existing beach nourishment or restoration project or of a beach nourishment or restoration project for which all funding arrangements have been made and all permits have been issued at the time the application is submitted. The department shall consider each year there is sand seaward of the erosion control line whether erosion took place that year. However, the seaward extent of the beach nourishment or restoration project beyond the erosion control line may not be considered in determining the applicable erosion rates. This subsection does not prohibit the department from requiring structures to meet the criteria established in subsection (1), subsection (2), or subsection (4) or to be further landward than required by this subsection based on the criteria established in subsection (1), subsection (2), or subsection (4). (e) The department shall annually report to the Legislature the status of this program, including any changes to the previously adopted procedures for determining erosion projections. (6) Any coastal structure erected, or excavation created, in violation of this section is declared to be a public nuisance and such structure shall be removed or such excavation shall be refilled after written notice by the department directing such removal or filling. If the structure is not removed or the excavation refilled within a reasonable time as directed, the department may remove such structure or fill such excavation at its own expense and the costs thereof shall become a lien on the property of the upland owner upon which the unauthorized structure or excavation is located. (7) Any person, firm, corporation, or agent thereof who violates this section commits a misdemeanor of the first degree, punishable as provided in s. 775.082 or s. 775.083, except that a person driving a vehicle on, over, or across a sand dune and damaging or causing to be damaged such sand dune or the vegetation growing thereon in violation of this section commits a misdemeanor of the second degree, punishable as provided in s. 775.082 or s. 775.083. A person, firm, corporation, or agent thereof commits a separate offense for each day during any portion of which a violation of this section is committed or continued. (8) This section does not apply to structures intended for shore protection purposes which are regulated by s. 161.041 or to structures existing or under construction before the establishment of the coastal construction control line if the structures are not materially altered except as provided in subsection (4). Except for structures that have been materially altered, structures under construction at the time of the establishment or reestablishment of the coastal construction control line are exempt from the provisions of this section. However, unless such an exemption has been judicially confirmed to exist before April 10, 1992, the exemption shall last only for a period of 3 years from the date of the determination of the exemption or April 10, 1992, whichever occurs later. The department may extend the exemption period for structures that require longer periods for completion if construction during the initial exemption period is continuous. For purposes of this subsection, the term “continuous” means following a reasonable sequence of construction without significant or unreasonable periods of work stoppage. (9) The department may exempt specifically described portions of the coastline from the provisions of this section if, in its judgment, such portions of coastline because of their nature are not subject to erosion of a substantially damaging effect to the public. (10) Pending the establishment of coastal construction control lines as provided herein, the provisions of s. 161.052 shall remain in force. However, upon the establishment of coastal construction control lines, or the establishment of coastal construction zoning and building codes as provided in subsection (3), s. 161.052 shall be superseded by the provisions of this section. (11)(a) The coastal construction control requirements defined in subsection (1) and the requirements of the erosion projections in subsection (5) do not apply to any modification, maintenance, or repair of any existing structure within the limits of the existing foundation which does not require, involve, or include any additions to, or repair or modification of, the existing foundation of that structure. Specifically excluded from this exemption are seawalls or other rigid coastal or shore protection structures and any additions or enclosures added, constructed, or installed below the first dwelling floor or lowest deck of the existing structure. The Florida Building Commission may not adopt any rule having the effect of limiting any exceptions or exemptions contained within this paragraph. (b) Activities seaward of the coastal construction control line which are determined by the department not to cause a measurable interference with the natural functioning of the coastal system are exempt from the requirements of subsection (4). (c) The department may establish exemptions from the requirements of this section for minor activities determined by the department not to have an adverse effect on the coastal system. Examples of such activities include, but are not limited to: 1. Boat moorings; 2. Maintenance of existing beach-dune vegetation; 3. The burial of seaweed, dead fish, whales, or other marine animals on the unvegetated beach; 4. The removal of piers or other derelict structures from the unvegetated beach or seaward of mean high water; 5. Temporary emergency vehicular access, if the affected area is immediately restored; 6. The removal of any existing structures or debris from the upland, if there is no excavation or disturbance to the existing topography or to beach-dune vegetation; 7. Construction of a new roof overhang extending no more than 4 feet beyond the confines of the existing foundation during modification, renovation, or reconstruction of a habitable structure within the confines of the existing foundation of that structure which does not include any additions to or modification of the existing foundation of that structure; 8. Minor and temporary excavation for the purpose of repairs to existing subgrade residential service utilities (e.g., water and sewer lines, septic tanks and drainfields, electrical and telephone cables, and gas lines), if there is minimal disturbance and the grade is restored with fill compatible in both coloration and grain size to the onsite material and any damaged or destroyed vegetation is restored using similar vegetation; and 9. Any other minor construction that has an effect similar to the above activities. (12)(a) Notwithstanding the coastal construction control requirements defined in subsection (1) or the erosion projection determined pursuant to subsection (5), the department may issue a permit for the repair or rebuilding within the confines of the original foundation of a major structure pursuant to subsection (4). Alternatively, the department may also issue a permit for a more landward relocation or rebuilding of a damaged or existing structure if such relocation or rebuilding would not cause further harm to the beach-dune system, and if, in the case of rebuilding, the rebuilding complies with subsection (4) and otherwise complies with this subsection. (b) The department may not permit repairs or rebuilding that expands the capacity of the original structure seaward of the 30-year erosion projection established pursuant to subsection (5). (c) In reviewing applications for relocation or rebuilding, the department shall specifically consider changes in shoreline conditions, the availability of other relocation or rebuilding options, and the design adequacy of the project sought to be rebuilt. (d) Permits issued under this subsection are not considered precedential as to the issuance of subsequent permits. (13) Concurrent with the establishment of a coastal construction control line and the ongoing administration of this chapter, the secretary of the department shall make recommendations to the Board of Trustees of the Internal Improvement Trust Fund concerning the purchase of the fee or any lesser interest in any lands seaward of the control line pursuant to the state’s Save Our Coast, Conservation and Recreation Lands, or Outdoor Recreation Land acquisition programs; and, with respect to those control lines established pursuant to this section before June 14, 1978, the secretary may make such recommendations. (14) A coastal county or municipality fronting on the Gulf of America, the Atlantic Ocean, or the Straits of Florida shall advise the department within 5 days after receipt of any permit application for construction or other activities proposed to be located seaward of the line established by the department pursuant to this section. Within 5 days after receipt of such application, the county or municipality shall notify the applicant of the requirements for state permits. (15) In keeping with the intent of subsection (3), authority for permitting certain types of activities that have been defined by the department may be delegated by the department to a coastal county or coastal municipality. Such partial delegation shall be narrowly construed to those particular activities specifically named in the delegation and agreed to by the affected county or municipality. The delegation may be revoked by the department at any time if it is determined that the delegation is improperly or inadequately administered. (16) The department may, at the request of a property owner, contract with the property owner for an agreement, or modify an existing contractual agreement regulating development activities landward of a coastal construction control line, if the contractual agreement is consistent with the design and siting provisions of this section. The contractual agreement may not bind either party for a period longer than 5 years following its date of execution. Before beginning a construction activity covered by the agreement, the property owner must obtain the necessary authorization required by the agreement. The agreement may not authorize construction for: (a) Major habitable structures that require construction beyond the expiration of the agreement, unless such construction is above the completed foundation; or (b) Nonhabitable major structures or minor structures, unless such construction is authorized at the same time as the habitable major structure. (17) The department may grant areawide permits to local governments, other governmental agencies, and utility companies for special classes of activities in areas under their general jurisdiction or responsibility or for the construction of minor structures, if these activities or structures, due to the type, size, or temporary nature of the activity or structure, will not cause measurable interference with the natural functioning of the beach-dune system or with marine turtles or their nesting sites. Such activities or structures must comply with this section and may include, but are not limited to: road repairs, not including new construction; utility repairs and replacements, or other minor activities necessary to provide utility services; beach cleaning; dune restoration; on-grade walkovers for enhancing accessibility or use in compliance with the Americans with Disabilities Act; and emergency response. The department shall adopt rules to establish criteria and guidelines for permit applicants. The department shall consult with the Fish and Wildlife Conservation Commission on each proposed areawide permit and must require notice provisions appropriate to the type and nature of the activities for which the areawide permits are sought. (18)(a) The department may grant general permits for projects, including dune restoration, dune walkovers, decks, fences, landscaping, sidewalks, driveways, pool resurfacing, minor pool repairs, and other nonhabitable structures, if the projects, due to type, size, or temporary nature, will not cause a measurable interference with the natural functioning of the beach-dune system or with marine turtles or their nesting sites. Multifamily habitable structures do not qualify for general permits. However, single-family habitable structures and swimming pools associated with such single-family habitable structures that do not advance the line of existing construction and satisfy all siting and design requirements of this section, and minor reconstruction for existing coastal armoring structures, may be eligible for a general permit. (b) The department shall adopt rules to establish criteria and guidelines for permit applicants. (c) Persons wishing to use the general permits must, at least 30 days before beginning any work, notify the department in writing on forms adopted by the department. The notice must include a description of the proposed project and supporting documents depicting the proposed project, its location, and other pertinent information as required by rule, to demonstrate that the proposed project qualifies for the requested general permit. Persons who undertake projects without proof of notice to the department, but whose projects would otherwise qualify for general permits, shall be considered to have undertaken a project without a permit and are subject to enforcement pursuant to s. 161.121. (d) Persons wishing to use a general permit must provide notice as required by the applicable local building code where the project will be located. If a building code does not require notice, a person wishing to use a general permit must, at a minimum, post a sign describing the project on the property at least 5 days before commencing construction. The sign must be at least 88 square inches, with letters no smaller than one-quarter inch. (19)(a) The department may suspend or revoke the use of a general or areawide permit for good cause, including: submission of false or inaccurate information in the notification for use of a general or areawide permit; violation of law, department orders, or rules relating to permit conditions; deviation from the specified activity or project indicated or the conditions for undertaking the activity or project; refusal of lawful inspection; or any other act by the permittee which results or may result in harm or injury to human health or welfare, or which causes harm or injury to animal, plant, or aquatic life or to property. (b) The department shall have access to the permitted activity or project at reasonable times to inspect and determine compliance with the permit and department rules. (20) The department may adopt rules related to the establishment of coastal construction control lines; activities seaward of the coastal construction control line; exemptions; property owner agreements; delegation of the program; permitting programs; and violations and penalties. (21) In accordance with ss. 553.73 and 553.79, and upon the effective date of the Florida Building Code, the provisions of this section which pertain to and govern the design, construction, erection, alteration, modification, repair, and demolition of public and private buildings, structures, and facilities shall be incorporated into the Florida Building Code. The Florida Building Commission may adopt rules pursuant to ss. 120.536 and 120.54 to administer those provisions. This subsection does not limit or abrogate the right and authority of the department to require permits or to adopt and enforce environmental standards, including, but not limited to, standards for ensuring the protection of the beach-dune system, proposed or existing structures, adjacent properties, marine turtles, native salt-resistant vegetation, endangered plant communities, and the preservation of public beach access. History. — s. 1, ch. 71-280; s. 2, ch. 75-87; s. 1, ch. 77-12; s. 5, ch. 78-257; s. 29, ch. 79-164; s. 3, ch. 80-183; s. 67, ch. 81-259; s. 2, ch. 83-247; s. 33, ch. 85-55; s. 1, ch. 86-191; s. 13, ch. 87-97; s. 1, ch. 88-106; s. 1, ch. 88-349; s. 11, ch. 89-175; s. 9, ch. 91-224; s. 1, ch. 92-191; s. 22, ch. 94-356; s. 1437, ch. 95-147; s. 1, ch. 96-371; s. 21, ch. 96-410; s. 2, ch. 98-131; s. 6, ch. 2000-141; s. 5, ch. 2000-346; s. 34, ch. 2001-186; s. 3, ch. 2001-372; s. 186, ch. 2008-247; s. 39, ch. 2010-102; s. 2, ch. 2011-222; s. 16, ch. 2013-14; s. 12, ch. 2014-151; s. 25, ch. 2025-8. 161.0531 Development agreements. (1) At the request of the property owner, the department is authorized to enter into a development agreement with such property owner, or modify or extend an existing development agreement, for activities seaward of a coastal construction control line. All such agreements must further the conservation, preservation, and protection of the beach-dune system and cause no measurable interference with marine turtles or their nesting sites. (2) For purposes of this section, “development agreement” means contractual agreements between property owners and the department concerning siting and design criteria and the permitting requirements and environmental enhancements required by this chapter for a proposed construction activity seaward of the coastal construction control line. (3) A development agreement shall include the following: (a) A legal description of the land subject to the agreement, and the names of the legal and equitable owners of the land. (b) The duration of the agreement. (c) A description of the siting and design features of the proposed development or activity. (d) Adequate engineering data concerning inlet and shoreline stability and storm tides related to shoreline topography. (e) A description of the permitting requirements and environmental enhancements of the development. (f) A description of any conditions, terms, restrictions, or other requirements determined to be necessary by the department for the protection of the environment. (g) A finding that the development permitted or proposed is consistent with the local government’s comprehensive plan and land development regulations. (h) A statement that all filing, processing, administration, and issuance fees have been paid. (4) A development agreement shall not authorize construction for a period longer than 5 years from the date of execution. (5) The department shall inspect land subject to a development agreement at least once every 12 months to determine that the project is in compliance with the terms of the development agreement, unless the department determines a lesser standard meets the intent of the terms of the development agreement. (6) Within 14 days after the date for a request for a chapter 120 hearing has passed, or after a hearing has been held and a decision has been rendered, the developer shall record the development agreement with the clerk of the circuit court in the county where the development is located. A development agreement shall not be effective until it is properly recorded in the public records of the county. (7) The department’s approval of a development agreement, or modification or extension of an existing development agreement, pursuant to this section constitutes final agency action subject to the provisions of chapter 120. However, the property owner may not challenge the department’s refusal to enter into a development agreement or modification or extension of an existing agreement. History. — s. 2, ch. 96-371. 161.0535 Permits; fees, costs. The department may establish by rule a fee schedule and may assess fees for the filing, processing, and issuance of permits issued under ss. 161.041 and 161.053. The fee schedule must contain categories of permits based on the varying costs of evaluating applications for different types of proposed construction. The fee schedule must be based on the actual costs of administering these permitting programs. Moneys from fees assessed under this section must be deposited into the Florida Permit Fee Trust Fund. The department may also assess the applicant for the costs of public notice by publication prior to the consideration of these permit applications; alternatively, the department may require an applicant to publish, at the applicant’s expense, in a newspaper of general circulation within the affected area, a notice of receipt of the application and a notice of the intended agency action. History. — s. 2, ch. 83-247; s. 34, ch. 85-55; s. 14, ch. 87-97; s. 486, ch. 94-356; s. 2, ch. 96-321. 161.054 Administrative fines; liability for damage; liens. (1) In addition to the penalties provided for in ss. 161.052, 161.053, and 161.121, any person, firm, corporation, or governmental agency, or agent thereof, refusing to comply with or willfully violating s. 161.041, s. 161.052, or s. 161.053, or any rule or order prescribed by the department thereunder, shall incur a fine for each offense in an amount up to $15,000 to be fixed, imposed, and collected by the department. Each day during any portion of which such violation occurs constitutes a separate offense. (2) Whenever any person, firm, corporation, or governmental agency, or agent thereof, knowingly or by gross negligence violates any of the provisions of s. 161.041, s. 161.052, or s. 161.053 so that damage is caused to sovereignty lands seaward of mean high water or to beaches, shores, or beach-dune systems, including animal, plant, or aquatic life thereon, such violator shall be liable for such damage. If two or more persons, firms, corporations, or governmental agencies, or their agents, cause damage, and if liability for such damage cannot be apportioned, each violator shall be jointly and severally liable for the damage. If, however, liability for such damage can be apportioned, each violator is liable only for that portion of the damage and subject to that portion of the fine attributable to his or her violation. (3) The imposition of a fine or an award of damages pursuant to this section shall create a lien upon the real and personal property of the violator, enforceable by the department as are statutory liens under chapter 85. The proceeds of such fines and awards of damages shall be deposited in the Florida Coastal Protection Trust Fund. (4) Fines imposed by the department or damages awarded shall be of such amount so as to ensure immediate and continued compliance with the provisions of ss. 161.041, 161.052, and 161.053. (5) Any applicant for a permit pursuant to s. 161.041, s. 161.052, or s. 161.053 shall be denied a permit if a lien imposed upon the property pursuant to the provisions of this section is outstanding against the applicant; however, the department may authorize a permit after the fact in accordance with s. 161.041, s. 161.052, or s. 161.053, conditioned upon a resolution of the violation. History. — s. 4, ch. 80-183; s. 3, ch. 83-247; s. 35, ch. 85-55; s. 2, ch. 86-138; s. 15, ch. 87-97; s. 30, ch. 91-45; s. 894, ch. 95-147; s. 3, ch. 96-321; s. 6, ch. 2015-229; s. 4, ch. 2020-158. 161.055 Concurrent processing of permits. (1) When an activity for which a permit is required under this chapter also requires a permit, authorization, or approval described in paragraph (2)(b), including a port conceptual permit pursuant to s. 373.4133, the department may, by rule, provide that the activity may be undertaken only upon receipt of a single permit from the department called a “joint coastal permit,” as provided in this section. (2) The department may adopt rules requiring concurrent application submittal and establishing a concurrent review and permitting procedure for any activity regulated under this chapter that also requires one or more of the permits, authorizations, or approvals described in paragraph (a) or paragraph (b). The rules must establish concurrent procedures for processing applications under this part with one or more of the permits, authorizations, or approvals described in paragraph (a) or paragraph (b). An applicant that proposes such an activity must submit, as part of the permit application under this chapter, all information necessary to satisfy the requirements for issuance of any required: (a) Proprietary authorization under chapters 253 and 258 to use submerged lands owned by the Board of Trustees of the Internal Improvement Trust Fund; and (b) Environmental resource permit or dredge and fill permit under part IV of chapter 373. The timeframes for license approval or denial set forth in s. 120.60(1) do not commence until all required information is received. The rules authorized under this section may also require submittal of such information as is necessary to determine whether the proposed activity will occur on submerged lands owned by the Board of Trustees of the Internal Improvement Trust Fund, and shall contain provisions for permit processing and issuance of orders which are consistent with s. 373.427 and provisions for providing notice of applications which are consistent with s. 373.413. Authorization under this subsection may not be issued unless the requirements for issuance of any additional required authorizations, permits, waivers, variances, and approvals described in paragraph (a) or paragraph (b) are also satisfied. (3) The review of agency action on an application for issuance of a joint coastal permit must be as provided in s. 373.4275. History. — s. 485, ch. 94-356; s. 22, ch. 96-410; s. 6, ch. 2010-201. 161.061 Coastal construction serving no public purpose, endangering human life, health, or welfare, or becoming unnecessary or undesirable. (1) Any coastal construction, or any structure including groin

    The text continues in the official source.

    Related guides, FAQ and contract templates