Beta
RCW ch. 19.28
RCW ch. 19.28 — Revised Code of Washington Chapter 19.28 RCW — Electricians And Electrical Installations
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.
RCW 19.28.006 Definitions.
The definitions in this section apply throughout this subchapter.
(1) "Administrator" means a person designated by an electrical contractor to supervise electrical work and electricians in accordance with the rules adopted under this chapter.
(2) "Basic electrical work" means the work classified in (a) and (b) of this subsection as class A and class B basic electrical work:
(a) "Class A basic electrical work" means the like-in-kind replacement of a: Contactor, relay, timer, starter, circuit board, or similar control component; household appliance; circuit breaker; fuse; residential luminaire; lamp; snap switch; dimmer; receptacle outlet; thermostat; heating element; luminaire ballast with an exact same ballast; ten horsepower or smaller motor; or wiring, appliances, devices, or equipment as specified by rule.
(b) "Class B basic electrical work" means work other than class A basic electrical work that requires minimal electrical circuit modifications and has limited exposure hazards. Class B basic electrical work includes the following:
(i) Extension of not more than one branch electrical circuit limited to one hundred twenty volts and twenty amps each where:
(A) No cover inspection is necessary; and
(B) The extension does not supply more than two outlets;
(ii) Like-in-kind replacement of a single luminaire not exceeding two hundred seventy-seven volts and twenty amps;
(iii) Like-in-kind replacement of a motor larger than ten horsepower;
(iv) The following low voltage systems:
(A) Repair and replacement of devices not exceeding one hundred volt-amperes in Class 2, Class 3, or power limited low voltage systems in one and two-family dwellings;
(B) Repair and replacement of the following devices not exceeding one hundred volt-amperes in Class 2, Class 3, or power limited low voltage systems in other buildings, provided the equipment is not for fire alarm or nurse call systems and is not located in an area classified as hazardous by the national electrical code; or
(v) Wiring, appliances, devices, or equipment as specified by rule.
(3) "Board" means the electrical board under RCW 19.28.311.
(4) "Chapter" or "subchapter" means the subchapter, if no chapter number is referenced.
(5) "Department" means the department of labor and industries.
(6) "Director" means the director of the department or the director's designee.
(7) "Electrical construction trade" includes, but is not limited to, installing or maintaining electrical wires and equipment that are used for light, heat, or power and installing and maintaining remote control, signaling, power limited, or communication circuits or systems.
(8) "Electrical contractor" means a person, firm, partnership, corporation, or other entity that offers to undertake, undertakes, submits a bid for, or does the work of installing or maintaining wires or equipment that convey electrical current.
(9) "Equipment" means any equipment or apparatus that directly uses, conducts, insulates, or is operated by electricity but does not mean: Plug-in appliances; or plug-in equipment as determined by the department by rule.
(10) "Industrial control panel" means a factory-wired or user-wired assembly of industrial control equipment such as motor controllers, switches, relays, power supplies, computers, cathode ray tubes, transducers, and auxiliary devices. The panel may include disconnect means and motor branch circuit protective devices.
(11) "Journey level electrician" means a person who has been issued a journey level electrician certificate of competency by the department.
(12) "Like-in-kind" means having similar characteristics such as voltage requirements, current draw, and function, and being in the same location.
(13) "Master electrician" means either a master journey level electrician or master specialty electrician.
(14) "Master journey level electrician" means a person who has been issued a master journey level electrician certificate of competency by the department and who may be designated by an electrical contractor to supervise electrical work and electricians in accordance with rules adopted under this chapter.
(15) "Master specialty electrician" means a person who has been issued a specialty electrician certificate of competency by the department and who may be designated by an electrical contractor to supervise electrical work and electricians in accordance with rules adopted under this chapter.
(16) "Specialty electrician" means a person who has been issued a specialty electrician certificate of competency by the department.
[ 2013 c 23 s 27; 2003 c 399 s 101; 2002 c 249 s 1; 2001 c 211 s 1; 2000 c 238 s 103; 1993 c 275 s 1; 1988 c 81 s 1; 1986 c 156 s 1; 1983 c 206 s 1. Formerly RCW 19.28.005.]
NOTES:
Part headings not law—
RCW 19.28.010 Electrical wiring requirements—General—Exceptions.
(1) All wires and equipment, and installations thereof, that convey electric current and installations of equipment to be operated by electric current, in, on, or about buildings or structures, except for telephone, telegraph, radio, and television wires and equipment, and television antenna installations, signal strength amplifiers, and coaxial installations pertaining thereto shall be in strict conformity with this chapter, the statutes of the state of Washington, and the rules issued by the department, and shall be in conformity with approved methods of construction for safety to life and property. The following are exempt from the requirements of this chapter: All wires and equipment that fall within section 90.2(b)(5) of the National Electrical Code, 1981 edition; all wires and equipment within the communication worker safety zone and supply space, as defined in the National Electrical Safety Code, on poles supporting electric utility transmission or distribution lines or wires; and electric utility-owned equipment between a meter base and meter. The regulations and articles in the National Electrical Code, the National Electrical Safety Code, and other installation and safety regulations approved by the national fire protection association, as modified or supplemented by rules issued by the department in furtherance of safety to life and property under authority hereby granted, shall be prima facie evidence of the approved methods of construction. All materials, devices, appliances, and equipment used in such installations shall be of a type that conforms to applicable standards or be indicated as acceptable by the established standards of any electrical product testing laboratory which is accredited by the department. Industrial control panels, utilization equipment, and their components do not need to be listed, labeled, or otherwise indicated as acceptable by an accredited electrical product testing laboratory unless specifically required by the National Electrical Code, 1993 edition.
(2) Residential buildings or structures moved into or within a county, city, or town are not required to comply with all of the requirements of this chapter, if the original occupancy classification of the building or structure is not changed as a result of the move. This subsection shall not apply to residential buildings or structures that are substantially remodeled or rehabilitated.
(3) This chapter shall not limit the authority or power of any city or town to enact and enforce under authority given by law, any ordinance, rule, or regulation requiring an equal, higher, or better standard of construction and an equal, higher, or better standard of materials, devices, appliances, and equipment than that required by this chapter. A city or town shall require that its electrical inspectors meet the qualifications provided for state electrical inspectors in accordance with RCW 19.28.321. In a city or town having an equal, higher, or better standard the installations, materials, devices, appliances, and equipment shall be in accordance with the ordinance, rule, or regulation of the city or town.
(4) Incorporated cities and towns where electrical inspections are required by local ordinances may enforce the provisions of RCW 19.28.041(1), 19.28.161, 19.28.271(1), 19.28.420(1), and applicable licensing and certification rules within their respective jurisdictions. Nothing in this subsection diminishes the authority of the department to enforce the provisions of RCW 19.28.041(1), 19.28.161, 19.28.271(1), 19.28.420(1), and applicable licensing and certification rules within any city or town.
(5) Electrical equipment associated with spas, hot tubs, swimming pools, and hydromassage bathtubs shall not be offered for sale or exchange unless the electrical equipment is certified as being in compliance with the applicable product safety standard by bearing the certification mark of an approved electrical products testing laboratory.
(6) Nothing in this chapter may be construed as permitting the connection of any conductor of any electric circuit with a pipe that is connected with or designed to be connected with a waterworks piping system, without the consent of the person or persons legally responsible for the operation and maintenance of the waterworks piping system.
[ 2019 c 119 s 1; 2018 c 240 s 1; 2001 c 211 s 2; 1993 c 275 s 2; 1992 c 79 s 2. Prior: 1986 c 263 s 1; 1986 c 156 s 2; 1983 c 206 s 2; 1965 ex.s. c 117 s 1; 1963 c 207 s 1; 1935 c 169 s 1; RRS s 8307-1. Formerly RCW 19.28.020, 19.28.030, 19.28.040, 19.28.050.]
RCW 19.28.021 Disputes regarding local regulations—Arbitration—Appeal.
Disputes arising under RCW 19.28.010(3) regarding whether the city or town's electrical rules, regulations, or ordinances are equal to the rules adopted by the department shall be resolved by arbitration. The department shall appoint two members of the board to serve on the arbitration panel, and the city or town shall appoint two persons to serve on the arbitration panel. These four persons shall choose a fifth person to serve. If the four persons cannot agree on a fifth person, the presiding judge of the superior court of the county in which the city or town is located shall choose a fifth person. A decision of the arbitration panel may be appealed to the superior court of the county in which the city or town is located within thirty days after the date the panel issues its final decision.
[ 2000 c 171 s 46; 1988 c 81 s 2; 1983 c 206 s 3. Formerly RCW 19.28.015.]
RCW 19.28.031 Rules, regulations, and standards.
(1) Prior to January 1st of each year, the director shall obtain an authentic copy of the national electrical code, latest revision. The department, after consulting with the board and receiving the board's recommendations, shall adopt reasonable rules in furtherance of safety to life and property. All rules shall be kept on file by the department. Compliance with the rules shall be prima facie evidence of compliance with this chapter. The department upon request shall deliver to all persons, firms, partnerships, corporations, or other entities licensed under this chapter a copy of the rules.
(2) The department shall also obtain and keep on file an authentic copy of any applicable regulations and standards of any electrical product testing laboratory which is accredited by the department prescribing rules, regulations, and standards for electrical materials, devices, appliances, and equipment, including any modifications and changes that have been made during the previous year.
[ 1993 c 275 s 3; 1988 c 81 s 3; 1986 c 156 s 3; 1983 c 206 s 4; 1965 ex.s. c 117 s 2; 1935 c 169 s 10; RRS s 8307-10. Formerly RCW 19.28.060.]
RCW 19.28.041 License required—General or specialty licenses—Fees—Application—Bond or cash deposit.
(1) It is unlawful for any person, firm, partnership, corporation, or other entity to advertise, offer to do work, submit a bid, engage in, conduct, or carry on the business of installing or maintaining wires or equipment to convey electric current, or installing or maintaining equipment to be operated by electric current as it pertains to the electrical industry, without having an unrevoked, unsuspended, and unexpired electrical contractor license, issued by the department in accordance with this chapter. All electrical contractor licenses expire twenty-four calendar months following the day of their issue. The department may issue an electrical contractor license for a period of less than twenty-four months only for the purpose of equalizing the number of electrical contractor licenses that expire each month. Application for an electrical contractor license shall be made in writing to the department, accompanied by the required fee. The application shall state:
(a) The name and address of the applicant; in case of firms or partnerships, the names of the individuals composing the firm or partnership; in case of corporations, the names of the managing officials thereof;
(b) The location of the place of business of the applicant and the name under which the business is conducted;
(c) Employer social security number;
(d) Evidence of workers' compensation coverage for the applicant's employees working in Washington, as follows:
(i) The applicant's industrial insurance account number issued by the department;
(ii) The applicant's self-insurer number issued by the department; or
(iii) For applicants domiciled in a state or province of Canada subject to an agreement entered into under RCW 51.12.120(7), as permitted by the agreement, filing a certificate of coverage issued by the agency that administers the workers' compensation law in the applicant's state or province of domicile certifying that the applicant has secured the payment of compensation under the other state's or province's workers' compensation law;
(e) Employment security department number;
(f) State excise tax registration number;
(g) Unified business identifier (UBI) account number may be substituted for the information required by (d) of this subsection if the applicant will not employ employees in Washington, and by (e) and (f) of this subsection; and
(h) Whether a general or specialty electrical contractor license is sought and, if the latter, the type of specialty. Electrical contractor specialties include, but are not limited to: Residential, pump and irrigation, limited energy system, signs, nonresidential maintenance, restricted nonresidential maintenance, appliance repair, and a combination specialty. A general electrical contractor license shall grant to the holder the right to engage in, conduct, or carry on the business of installing or maintaining wires or equipment to carry electric current, and installing or maintaining equipment, or installing or maintaining material to fasten or insulate such wires or equipment to be operated by electric current, in the state of Washington. A specialty electrical contractor license shall grant to the holder a limited right to engage in, conduct, or carry on the business of installing or maintaining wires or equipment to carry electrical current, and installing or maintaining equipment; or installing or maintaining material to fasten or insulate such wires or equipment to be operated by electric current in the state of Washington as expressly allowed by the license.
(2) The department may verify the workers' compensation coverage information provided by the applicant under subsection (1)(d) of this section, including but not limited to information regarding the coverage of an individual employee of the applicant. If coverage is provided under the laws of another state, the department may notify the other state that the applicant is employing employees in Washington.
(3) The application for an electrical contractor license shall be accompanied by a bond in the sum of four thousand dollars with the state of Washington named as obligee in the bond, with good and sufficient surety, to be approved by the department. The bond shall at all times be kept in full force and effect, and any cancellation or revocation thereof, or withdrawal of the surety therefrom, suspends the license issued to the principal until a new bond has been filed and approved as provided in this section. Upon approval of a bond, the department shall on the next business day deposit the fee accompanying the application in the electrical license fund and shall file the bond in the office. The department shall upon request furnish to any person, firm, partnership, corporation, or other entity a certified copy of the bond upon the payment of a fee that the department shall set by rule. The fee shall cover but not exceed the cost of furnishing the certified copy. The bond shall be conditioned that in any installation or maintenance of wires or equipment to convey electrical current, and equipment to be operated by electrical current, the principal will comply with the provisions of this chapter and with any electrical ordinance, building code, or regulation of a city or town adopted pursuant to RCW 19.28.010(3) that is in effect at the time of entering into a contract. The bond shall be conditioned further that the principal will pay for all labor, including employee benefits, and material furnished or used upon the work, taxes and contributions to the state of Washington, and all damages that may be sustained by any person, firm, partnership, corporation, or other entity due to a failure of the principal to make the installation or maintenance in accordance with this chapter or any applicable ordinance, building code, or regulation of a city or town adopted pursuant to RCW 19.28.010(3). In lieu of the surety bond required by this section, the license applicant may file with the department a cash deposit or other negotiable security acceptable to the department. If the license applicant has filed a cash deposit, the department shall deposit the funds in a special trust savings account in a commercial bank, mutual savings bank, or savings and loan association and shall pay annually to the depositor the interest derived from the account.
(4) The department shall issue general or specialty electrical contractor licenses to applicants meeting all of the requirements of this chapter. The provisions of this chapter relating to the licensing of any person, firm, partnership, corporation, or other entity including the requirement of a bond with the state of Washington named as obligee therein and the collection of a fee therefor, are exclusive, and no political subdivision of the state of Washington may require or issue any licenses or bonds or charge any fee for the same or a similar purpose. No person, firm, partnership, corporation, or other entity holding more than one specialty contractor license under this chapter may be required to pay an annual fee for more than one such license or to post more than one four thousand dollar bond, equivalent cash deposit, or other negotiable security.
(5) To obtain a general or specialty electrical contractor license, the applicant must designate an individual who currently possesses a valid master journey level electrician's certificate of competency, master specialty electrician's certificate of competency in the specialty for which application has been made, or administrator's certificate as a general electrical contractor administrator or as a specialty electrical contractor administrator in the specialty for which application has been made.
(6) Administrator certificate specialties include, but are not limited to: Residential, pump and irrigation or domestic pump, limited energy system, signs, nonresidential maintenance, restricted nonresidential maintenance, appliance repair, and combination specialty. To obtain an administrator's certificate, an individual must pass an examination as set forth in RCW 19.28.051 unless the applicant was a licensed electrical contractor at any time during 1974. Applicants who were electrical contractors licensed by the state of Washington at any time during 1974 are entitled to receive a general electrical contractor administrator's certificate without examination if the applicants apply prior to January 1, 1984. The board of electrical examiners shall certify to the department the names of all persons who are entitled to either a general or specialty electrical contractor administrator's certificate.
(7) For a contractor doing domestic water pumping system work as defined by RCW 18.106.010(14)(c), the department shall consider the requirements of subsections (1)(a) through (h), (2), and (3) of this section to have been met to be a pump and irrigation or domestic pump licensed electrical contractor if:
(a) The contractor has met the plumbing contractor licensing requirements of chapter 18.106 RCW. The department shall establish a single licensing document for those who qualify for both a plumbing contractor license as defined in chapter 18.106 RCW and a pump and irrigation or domestic pump electrical contractor license as defined by this chapter; or
(b) Until January 1, 2021, the contractor has met the contractor registration requirements of chapter 18.27 RCW. The department shall establish a single registration/licensing document for those who qualify for both a general contractor registration as defined in chapter 18.27 RCW and a pump and irrigation or domestic pump electrical contractor license as defined by this chapter.
[ 2020 c 153 s 24; 2013 c 23 s 28. Prior: 2006 c 224 s 1; 2006 c 185 s 5; 2002 c 249 s 2; 2001 c 211 s 3; 1998 c 279 s 4; 1992 c 217 s 2; 1986 c 156 s 5; 1983 c 206 s 5; 1975 1st ex.s. c 195 s 1; 1975 1st ex.s. c 92 s 1; 1974 ex.s. c 188 s 1; 1971 ex.s. c 129 s 1; 1969 ex.s. c 71 s 2; 1969 c 30 s 1; prior: 1967 ex.s. c 15 s 1; 1967 c 88 s 2; 1965 ex.s. c 117 s 3; 1963 c 207 s 2; 1959 c 325 s 1; 1935 c 169 s 4; RRS s 8307-4; prior: 1919 c 204 ss 1, 2. Formerly RCW 19.28.120, 19.28.130, 19.28.140, 19.28.150, 19.28.160, 19.28.170.]
NOTES:
Finding—
RCW 19.28.051 Examinations—Fees.
It shall be the purpose and function of the board to establish, in addition to a general electrical contractors' license, such classifications of specialty electrical contractors' licenses as it deems appropriate with regard to individual sections pertaining to state adopted codes in this chapter. In addition, it shall be the purpose and function of the board to establish and administer written examinations for general electrical administrators' certificates and the various specialty electrical administrators' certificates. Examinations shall be designed to reasonably ensure that general and specialty electrical administrators' certificate holders are competent to engage in and supervise the work covered by this statute and their respective licenses. The examinations shall include questions from the following categories to ensure proper safety and protection for the general public: (1) Safety, (2) state electrical code, and (3) electrical theory. The department with the consent of the board shall be permitted to enter into a contract with a professional testing agency to develop, administer, and score these examinations, or accept certifications or other appropriate demonstrations established by independent entities that otherwise fulfill the examination requirements of this section. The fee for the examination may be set by the department in its contract with the professional testing agency. The department may direct that the applicant pay the fee to the professional testing agency. The fee shall cover but not exceed the costs of preparing and administering the examination. It shall be the further purpose and function of this board to advise the director as to the need of additional electrical inspectors and compliance officers to be utilized by the director on either a full-time or part-time employment basis and to carry out the duties enumerated in RCW 19.28.161 through 19.28.271 as well as generally advise the department on all matters relative to RCW 19.28.161 through 19.28.271.
[ 2020 c 153 s 27; 2006 c 185 s 8; 2001 c 211 s 4; 1996 c 147 s 6; 1988 c 81 s 5; 1986 c 156 s 6; 1984 c 287 s 57; 1977 ex.s. c 79 s 1; 1975-'76 2nd ex.s. c 34 s 62; 1975 1st ex.s. c 195 s 2; 1975 1st ex.s. c 92 s 2; 1974 ex.s. c 188 s 2. Formerly RCW 19.28.123.]
NOTES:
Legislative findings—
RCW 19.28.061 Electrical contractors—Designee of firm to take master electrician or administrator's examination—Administrator's certificate—Fee—Certificate duration, denial, renewal, nontransferable—Master electrician or administrator's duties.
(1) Each applicant for an electrical contractor's license, other than an individual, shall designate a supervisory employee or member of the firm to take the required master electrician's or administrator's examination. Effective July 1, 1987, a supervisory employee designated as the electrical contractor's master electrician or administrator shall be a full-time supervisory employee. This person shall be designated as master electrician or administrator under the license. No person may concurrently qualify as master electrician or administrator for more than one contractor. If the relationship of the master electrician or administrator with the electrical contractor is terminated, the contractor's license is void within ninety days unless another master electrician or administrator is qualified by the board. However, if the master electrician or administrator dies or is otherwise incapacitated, the contractor's license is void within one hundred eighty days unless another master electrician or administrator is qualified by the board. The contractor must notify the department in writing within ten days if the master electrician's or administrator's relationship with the contractor terminates due to the master electrician's or administrator's death or incapacitation.
(2) The department must issue an administrator's certificate to all applicants who have passed the examination as provided in RCW 19.28.051 and this section, and who have complied with the rules adopted under this chapter. The administrator's certificate must bear the date of issuance, expires on the holder's birthday, and is nontransferable. The certificate must be renewed every three years, upon application, on or before the holder's birthday.
(a) If the certificate holder demonstrates to the department that he or she has satisfactorily completed an annual eight-hour continuing education course, the certificate may be renewed by appropriate application without examination unless the certificate has been revoked, suspended, or not renewed within ninety days after the expiration date. For holders of pump and irrigation or domestic pump specialty administrator certificates, the continuing education may comprise both electrical and plumbing education.
(b) The contents and requirements for satisfactory completion of the continuing education course must be determined by the director and approved by the board.
(c) The department must accept proof of a certificate holder's satisfactory completion of a continuing education course offered in another state as meeting the requirements for maintaining a current Washington state certificate if the department is satisfied the course is comparable in nature to that required in Washington state for maintaining a current certificate.
(3) A fee must be assessed for each administrator's certificate and for each renewal. An individual holding more than one administrator's certificate under this chapter is not required to pay fees for more than one certificate. The department must set the fees by rule for issuance and renewal of a certificate. The fees must cover, but not exceed, the costs of issuing the certificates and of administering and enforcing the administrator certification requirements of this chapter.
(4) The department may deny an application for an administrator's certificate for up to two years if the applicant's previous administrator's certificate has been revoked for a serious violation and all appeals concerning the revocation have been exhausted. For the purposes of this section only, a serious violation is a violation that presents imminent danger to the public. The certificate may be renewed for a three-year period without examination by appropriate application unless the certificate has been revoked, suspended, or not renewed within ninety days after the expiration date. If the certificate is not renewed before the expiration date, the individual shall pay twice the usual fee. A person may take the administrator's examination as many times as necessary to pass without limit.
(5) The designated master electrician or administrator shall:
(a) Be a member of the firm or a supervisory employee and shall be available during working hours to carry out the duties of an administrator under this section;
(b) Ensure that all electrical work complies with the electrical installation laws and rules of the state;
(c) Ensure that the proper electrical safety procedures are used;
(d) Ensure that all electrical labels, permits, and licenses required to perform electrical work are used;
(e) See that corrective notices issued by an inspecting authority are complied with; and
(f) Notify the department in writing within ten days if the master electrician or administrator terminates the relationship with the electrical contractor.
(6) The department shall not by rule change the administrator's duties under subsection (5) of this section.
[ 2006 c 185 s 9; 2002 c 249 s 3; 1996 c 241 s 3; 1988 c 81 s 6; 1986 c 156 s 7; 1983 c 206 s 6; 1975 1st ex.s. c 195 s 3; 1975 1st ex.s. c 92 s 3; 1974 ex.s. c 188 s 4. Formerly RCW 19.28.125.]
NOTES:
Severability—
RCW 19.28.071 Licensee's bond—Action on—Priorities—Cash deposit, payment from.
Any person, firm, or corporation sustaining any damage or injury by reason of the principal's breach of the conditions of the bond required under RCW 19.28.041 may bring an action against the surety named therein, joining in the action the principal named in the bond; the action shall be brought in the superior court of any county in which the principal on the bond resides or transacts business, or in the county in which the work was performed as a result of which the breach is alleged to have occurred; the action shall be maintained and prosecuted as other civil actions. Claims or actions against the surety on the bond shall be paid in full in the following order of priority: (1) Labor, including employee benefits, (2) materials and equipment used upon such work, (3) taxes and contributions due to the state, (4) damages sustained by any person, firm or corporation due to the failure of the principal to make the installation in accordance with the provisions of chapter 19.28 RCW, or any ordinance, building code, or regulation applicable thereto: PROVIDED, That the total liability of the surety on any bond shall not exceed the sum of four thousand dollars and the surety on the bond shall not be liable for monetary penalties; and any action shall be brought within one year from the completion of the work in the performance of which the breach is alleged to have occurred. The surety shall mail a conformed copy of the judgment against the bond to the department within seven days.
In the event that a cash or securities deposit has been made in lieu of the surety bond, and in the event of a judgment being entered against such depositor and deposit, the director shall upon receipt of a certified copy of a final judgment, pay said judgment from such deposit.
[ 2001 c 211 s 5; 1986 c 156 s 8; 1969 ex.s. c 71 s 3; 1965 ex.s. c 117 s 4; 1935 c 169 s 5; RRS s 8307-5. Prior: 1919 c 204 s 4. Formerly RCW 19.28.180.]
RCW 19.28.081 Actions—Local permits—Proof of licensure.
No person, firm or corporation engaging in, conducting or carrying on the business of installing wires or equipment to convey electric current, or installing apparatus to be operated by said current, shall be entitled to commence or maintain any suit or action in any court of this state pertaining to any such work or business, without alleging and proving that such person, firm or corporation held, at the time of commencing and performing such work, an unexpired, unrevoked and unsuspended license issued under the provisions of this chapter; and no city or town requiring by ordinance or regulation a permit for inspection or installation of such electrical work, shall issue such permit to any person, firm or corporation not holding such license.
[ 1986 c 156 s 9; 1935 c 169 s 6; RRS s 8307-6. Formerly RCW 19.28.190.]
RCW 19.28.091 Licensing—Exemptions.
(1) No license under the provision of this chapter shall be required from any utility or any person, firm, partnership, corporation, or other entity employed by a utility because of work in connection with the installation, repair, or maintenance of lines, wires, apparatus, or equipment owned by or under the control of a utility and used for transmission or distribution of electricity from the source of supply to the point of contact at the premises and/or property to be supplied and service connections and meters and other apparatus or appliances used in the measurement of the consumption of electricity by the customer.
(2) No license under the provisions of this chapter shall be required from any utility because of work in connection with the installation, repair, or maintenance of the following:
(a) Lines, wires, apparatus, or equipment used in the lighting of streets, alleys, ways, or public areas or squares;
(b) Lines, wires, apparatus, or equipment owned by a commercial, industrial, or public institution customer that are an integral part of a transmission or distribution system, either overhead or underground, providing service to such customer and located outside the building or structure: PROVIDED, That a utility does not initiate the sale of services to perform such work;
(c) Lines and wires, together with ancillary apparatus, and equipment, owned by a customer that is an independent power producer who has entered into an agreement for the sale of electricity to a utility and that are used in transmitting electricity from an electrical generating unit located on premises used by such customer to the point of interconnection with the utility's system.
(3) Any person, firm, partnership, corporation, or other entity licensed under RCW 19.28.041 may enter into a contract with a utility for the performance of work under subsection (2) of this section.
(4) No license under the provisions of this chapter shall be required from any person, firm, partnership, corporation, or other entity because of the work of installing and repairing ignition or lighting systems for motor vehicles.
(5) No license under the provisions of this chapter shall be required from any person, firm, partnership, corporation, or other entity because of work in connection with the installation, repair, or maintenance of wires and equipment, and installations thereof, exempted in RCW 19.28.010.
(6) The department may by rule exempt from licensing requirements under this chapter work performed on premanufactured electric power generation equipment assemblies and control gear involving the testing, repair, modification, maintenance, or installation of components internal to the power generation equipment, the control gear, or the transfer switch.
(7) This chapter does not require an electrical contractor license if: (a) An appropriately certified electrician or a properly supervised certified electrical trainee is performing the installation, repair, or maintenance of wires and equipment for a nonprofit corporation that holds a current tax exempt status as provided under 26 U.S.C. Sec. 501(c)(3) or a nonprofit religious organization; (b) the certified electrician or certified electrical trainee is not compensated for the electrical work; and (c) the value of the electrical work does not exceed thirty thousand dollars.
(8) An entity that currently holds a valid plumbing contractor's license under chapter 18.106 RCW, or, until January 1, 2021, an entity that currently holds a valid specialty or general plumbing contractor's registration under chapter 18.27 RCW may employ a certified plumber, a certified residential plumber, or a plumber trainee meeting the requirements of chapter 18.106 RCW to perform electrical work that is incidentally, directly, and immediately appropriate to the like-in-kind replacement of a household appliance or other small household utilization equipment that requires limited electric power and limited waste and/or water connections. A plumber trainee must be supervised by a certified plumber or a certified residential plumber while performing electrical work. The electrical work is subject to the permitting and inspection requirements of this chapter.
[ 2020 c 153 s 23. Prior: 2003 c 399 s 301; 2003 c 242 s 1; 2001 c 211 s 6; 1998 c 98 s 1; 1992 c 240 s 1; 1980 c 30 s 15; 1935 c 169 s 11; RRS s 8307-11. Formerly RCW 19.28.200.]
NOTES:
Part headings not law—
RCW 19.28.095 Equipment repair specialty—Scope of work.
(1) The scope of work for the equipment repair specialty involves servicing, maintaining, repairing, or replacing utilization equipment or wiring, appliances, devices, or equipment as specified by rule of the department.
(2) "Utilization equipment" means equipment that is: (a) Self-contained on a single skid or frame; (b) factory built to standardized sizes or types; (c) listed or field evaluated by a laboratory or approved by the department under WAC 296-46B-030; and (d) connected as a single unit to a single source of electrical power limited to a maximum of six hundred volts. The equipment may also be connected to a separate single source of electrical control power limited to a maximum of two hundred fifty volts. Utilization equipment does not include devices used for occupant space heating by industrial, commercial, hospital, educational, public, and private commercial buildings, and other end users.
(3) "Servicing, maintaining, repairing, or replacing utilization equipment" includes:
(a) The like-in-kind replacement of the equipment if the same unmodified electrical circuit is used to supply the equipment being replaced;
(b) The like-in-kind replacement or repair of remote control components that are integral to the operation of the equipment;
(c) The like-in-kind replacement or repair of electrical components within the equipment; and
(d) The disconnection, replacement, and reconnection of low-voltage control and line voltage supply whips not over six feet in length provided there are no modifications to the characteristics of the branch circuit.
(4) "Servicing, maintaining, repairing, or replacing utilization equipment" does not include:
(a) The installation, repair, or modification of wiring that interconnects equipment and/or remote components, branch circuit conductors, services, feeders, panelboards, disconnect switches, motor control centers, remote magnetic starters/contactors, or raceway/conductor systems interconnecting multiple equipment or other electrical components;
(b) Any work providing electrical feeds into the power distribution unit or installation of conduits and raceways; or
(c) Any electrical work governed under article(s) 500, 501, 502, 503, 504, 505, 510, 511, 513, 514, 515, or 516 NEC (i.e., classified locations), except for electrical work in sewage pumping stations.
[ 2016 c 198 s 1; 2003 c 399 s 602.]
NOTES:
Part headings not law—
RCW 19.28.101 Inspections—Notice to repair and change—Disconnection—Entry—Concealment—Accessibility—Connection to utility—Permits, fees—Limitation—Waiver of provisions during state of emergency.
(1) The director shall cause an inspector to inspect all wiring, appliances, devices, and equipment to which this chapter applies except for basic electrical work as defined in this chapter. The department may not require an electrical work permit for class A basic electrical work unless deficiencies in the installation or repair require inspection. The department may inspect class B basic electrical work on a random basis as specified by the department in rule. Nothing contained in this chapter may be construed as providing any authority for any subdivision of government to adopt by ordinance any provisions contained or provided for in this chapter except those pertaining to cities and towns pursuant to RCW 19.28.010(3).
(2) Upon request, electrical inspections will be made by the department within forty-eight hours, excluding holidays, Saturdays, and Sundays. If, upon written request, the electrical inspector fails to make an electrical inspection within twenty-four hours, the serving utility may immediately connect electrical power to the installation if the necessary electrical work permit is displayed: PROVIDED, That if the request is for an electrical inspection that relates to a mobile home installation, the applicant shall provide proof of a current building permit issued by the local government agency authorized to issue such permits as a prerequisite for inspection approval or connection of electrical power to the mobile home.
(3) Whenever the installation of any wiring, device, appliance, or equipment is not in accordance with this chapter, or is in such a condition as to be dangerous to life or property, the person, firm, partnership, corporation, or other entity owning, using, or operating it shall be notified by the department and shall within fifteen days, or such further reasonable time as may upon request be granted, make such repairs and changes as are required to remove the danger to life or property and to make it conform to this chapter. The director, through the inspector, is hereby empowered to disconnect or order the discontinuance of electrical service to conductors or equipment that are found to be in a dangerous or unsafe condition and not in accordance with this chapter. Upon making a disconnection the inspector shall attach a notice stating that the conductors have been found dangerous to life or property and are not in accordance with this chapter. It is unlawful for any person to reconnect such defective conductors or equipment without the approval of the department, and until the conductors and equipment have been placed in a safe and secure condition, and in a condition that complies with this chapter.
(4) The director, through the electrical inspector, has the right during reasonable hours to enter into and upon any building or premises in the discharge of his or her official duties for the purpose of making any inspection or test of the installation of new construction or altered electrical wiring, electrical devices, equipment, or material contained in or on the buildings or premises. No electrical wiring or equipment subject to this chapter may be concealed until it has been approved by the inspector making the inspection. At the time of the inspection, electrical wiring or equipment subject to this chapter must be sufficiently accessible to permit the inspector to employ any testing methods that will verify conformance with the national electrical code and any other requirements of this chapter.
(5) Persons, firms, partnerships, corporations, or other entities making electrical installations shall obtain inspection and approval from an authorized representative of the department as required by this chapter before requesting the electric utility to connect to the installations. Electric utilities may connect to the installations if approval is clearly indicated by certification of the electrical work permit required to be affixed to each installation or by equivalent means, except that increased or relocated services may be reconnected immediately at the discretion of the utility before approval if an electrical work permit is displayed. The permits shall be furnished upon payment of the fee to the department.
(6) The director, subject to the recommendations and approval of the board, shall set by rule a schedule of license and electrical work permit fees that will cover the costs of administration and enforcement of this chapter. The rules shall be adopted in accordance with the administrative procedure act, chapter 34.05 RCW. No fee may be charged for plug-in mobile homes, recreational vehicles, or portable appliances.
(7) Nothing in this chapter shall authorize the inspection of any wiring, appliance, device, or equipment, or installations thereof, by any utility or by any person, firm, partnership, corporation, or other entity employed by a utility in connection with the installation, repair, or maintenance of lines, wires, apparatus, or equipment owned by or under the control of the utility. All work covered by the national electric code not exempted by the 1981 edition of the national electric code 90-2(B)(5) shall be inspected by the department.
(8) During a state of emergency declared under RCW 43.06.010(12), the governor may waive or suspend the collection of fees under this section or any portion of this section or under any administrative rule, and issue any orders to facilitate the operation of state or local government or to promote and secure the safety and protection of the civilian population.
[ 2008 c 181 s 201; 2003 c 399 s 201; 1996 c 241 s 4; 1992 c 240 s 2; 1989 c 344 s 1; 1988 c 81 s 7; 1983 c 206 s 7; 1971 ex.s. c 129 s 2; 1969 ex.s. c 71 s 4; 1967 c 88 s 3; 1965 ex.s. c 117 s 5; 1963 c 207 s 3; 1959 c 325 s 2; 1935 c 169 s 8; RRS s 8307-8. Formerly RCW 19.28.210, 19.28.220, 19.28.230, 19.28.240.]
NOTES:
Part headings not law—
RCW 19.28.111 Nonconforming installations—Disputes—Reference to board.
It is unlawful for any person, firm, partnership, corporation, or other entity to install or maintain any electrical wiring, appliances, devices, or equipment not in accordance with this chapter. In cases where the interpretation and application of the installation or maintenance standards prescribed in this chapter is in dispute or in doubt, the board shall, upon application of any interested person, firm, partnership, corporation, or other entity, determine the methods of installation or maintenance or the materials, devices, appliances, or equipment to be used in the particular case submitted for its decision.
[ 1988 c 81 s 8; 1983 c 206 s 9; 1935 c 169 s 2; RRS s 8307-2. Formerly RCW 19.28.260.]
RCW 19.28.121 Board—Request for ruling—Fee—Costs.
Any person, firm, partnership, corporation, or other entity desiring a decision of the board pursuant to RCW 19.28.111 shall, in writing, notify the director of such desire and shall accompany the notice with a certified check payable to the department in the sum of two hundred dollars. The notice shall specify the ruling or interpretation desired and the contention of the person, firm, partnership, corporation, or other entity as to the proper interpretation or application on the question on which a decision is desired. If the board determines that the contention of the applicant for a decision was proper, the two hundred dollars shall be returned to the applicant; otherwise it shall be used in paying the expenses and per diem of the members of the board in connection with the matter. Any portion of the two hundred dollars not used in paying the per diem and expenses of the board in the case shall be paid into the electrical license fund.
[ 2001 c 211 s 7; 1988 c 81 s 9; 1983 c 206 s 10; 1935 c 169 s 13; RRS s 8307-13. Formerly RCW 19.28.300.]
RCW 19.28.131 Specialty electrical contractor license—Written warning, penalty—Violations of RCW 19.28.010 through 19.28.141 and 19.28.311 through 19.28.361—Schedule of penalties—Appeal.
Until July 1, 2007, the department shall issue a written warning to any specialty contractor, performing the scope of work defined by rule for the pump and irrigation or domestic pump specialties, not having a valid electrical contractor license. The warning will state that the contractor must be qualified for and apply for a specialty electrical contractor license under the requirements in RCW 19.28.041 within 30 calendar days of the warning. Only one warning will be issued to any contractor. If the contractor fails to comply with this section, the department shall issue a penalty or penalties as authorized in this section to the contractor. Any person, firm, partnership, corporation, or other entity violating any of the provisions of RCW 19.28.010 through 19.28.141 and 19.28.311 through 19.28.361 shall be assessed a penalty of not less than $50 or more than $10,000. The department shall set by rule a schedule of penalties for violating RCW 19.28.010 through 19.28.141 and 19.28.311 through 19.28.361. The department shall notify the person, firm, partnership, corporation, or other entity violating any of the provisions of RCW 19.28.010 through 19.28.141 and 19.28.311 through 19.28.361 of the amount of the penalty and of the specific violation using an electronic or nonelectronic method by which the notice can be tracked or the delivery can be confirmed sent to the last known address of the assessed party. Before using an electronic method for the first time under this section, the department must provide the person, firm, partnership, corporation, or other entity the option to receive communication through a nonelectronic method. Any penalty is subject to review by an appeal to the board. The filing of an appeal stays the effect of the penalty until the board makes its decision. The appeal shall be filed within 20 days after notice of the penalty is given to the assessed party using an electronic or nonelectronic method by which the notice can be tracked or the delivery can be confirmed, sent to the last known address of the assessed party and shall be made by filing a written notice of appeal with the department. The notice shall be accompanied by a certified check for $200 or 10 percent of the penalty amount, whichever is less, but in no event less than $100, which shall be returned to the assessed party if the decision of the department is not sustained by the board. If the board sustains the decision of the department, the amount of the check shall be applied by the department to the payment of the per diem and expenses of the members of the board incurred in the matter, and any balance remaining after payment of per diem and expenses shall be paid into the electrical license fund. The hearing and review procedures shall be conducted in accordance with chapter 34.05 RCW. The board shall assign its hearings to an administrative law judge to conduct the hearing and issue a proposed decision and order. The board shall be allowed a minimum of 20 days to review a proposed decision and shall issue its decision no later than the next regularly scheduled board meeting.
[ 2026 c 77 s 6; 2014 c 190 s 2; 2011 c 301 s 6; 2006 c 185 s 13; 2001 c 211 s 8; 1996 c 147 s 7; 1988 c 81 s 12; 1986 c 156 s 11; 1983 c 206 s 12; 1980 c 30 s 16; 1935 c 169 s 14; RRS s 8307-14. Formerly RCW 19.28.350.]
NOTES:
Effective date—
RCW 19.28.141 RCW 19.28.101 inapplicable in certain cities and towns, electricity supply agency service areas, and rights-of-way of state highways.
(1) Except as provided in subsection (2) of this section, the provisions of RCW 19.28.101 shall not apply:
(a) Within the corporate limits of any incorporated city or town which has heretofore adopted and enforced or subsequently adopts and enforces an ordinance requiring an equal, higher or better standard of construction and of materials, devices, appliances and equipment than is required by this chapter.
(b) Within the service area of an electricity supply agency owned and operated by a city or town which is supplying electricity and enforcing a standard of construction and materials outside its corporate limits [on] July 1, 1963. The city, town, or agency shall enforce by inspection within its service area outside its corporate limits the same standards of construction and of materials, devices, appliances and equipment as are enforced by the department of labor and industries under this chapter. Fees charged in connection with such enforcement shall not exceed those established in RCW 19.28.101.
(c) Within the rights-of-way of state highways, provided the state department of transportation maintains and enforces an equal, higher or better standard of construction and of materials, devices, appliances and equipment than is required by RCW 19.28.010 through 19.28.141 and 19.28.311 through 19.28.361.
(2) A city, town, or electrical supply agency is permitted, but not required, to enforce the same permitting and inspection standards applicable to basic electrical work as are enforced by the department of labor and industries.
[ 2003 c 399 s 202; 2001 c 211 s 9; 1986 c 156 s 12; 1967 ex.s. c 97 s 1; 1963 c 207 s 4; 1959 c 325 s 3. Formerly RCW 19.28.360.]
NOTES:
Part headings not law—
RCW 19.28.151 RCW 19.28.010 through 19.28.141 and 19.28.311 through 19.28.361 inapplicable to telegraph or telephone companies exercising certain functions.
The provisions of RCW 19.28.010 through 19.28.141 and 19.28.311 through 19.28.361 shall not apply to the work of installing, maintaining or repairing any and all electrical wires, apparatus, installations or equipment used or to be used by a telegraph company or a telephone company in the exercise of its functions and located outdoors or in a building or buildings used exclusively for that purpose.
[ 2001 c 211 s 10; 2000 c 171 s 47; 1980 c 30 s 17; 1959 c 325 s 4. Formerly RCW 19.28.370.]
RCW 19.28.161 Certification—Apprentices and trainees—Supervision—Ratio of noncertified and certified workers—Trainee hours verification.
(1) No person may engage in the electrical construction trade without having a valid master journey level electrician certificate of competency, journey level electrician certificate of competency, master specialty electrician certificate of competency, or specialty electrician certificate of competency issued by the department in accordance with this chapter. Electrician certificate of competency specialties include, but are not limited to: Residential, pump and irrigation, limited energy system, signs, nonresidential maintenance, restricted nonresidential maintenance, and appliance repair.
(2)(a) A person who is: (i) Registered in an apprenticeship program approved under chapter 49.04 RCW or equivalent apprenticeship program approved by the department for the electrical construction trade; (ii) learning the electrical construction trade while working in a specialty; or (iii) learning the electrical construction trade in a program described in RCW 19.28.191(1) (e) or (f) for a journey level certificate of competency may work in the electrical construction trade if supervised by a certified master journey level electrician, journey level electrician, master specialty electrician in that electrician's specialty, or specialty electrician in that electrician's specialty.
(b) All apprentices and individuals learning the electrical construction trade shall obtain an electrical training certificate from the department. The certificate shall authorize the holder to learn the electrical construction trade while under the direct supervision of a master journey level electrician, journey level electrician, master specialty electrician working in that electrician's specialty, or specialty electrician working in that electrician's specialty. The certificate may include a photograph of the holder. The holder of the electrical training certificate shall renew the certificate biennially. At the time of renewal, the holder shall provide the department with an accurate list of the holder's employers in the electrical construction industry for the previous biennial period and the number of hours worked for each employer. The holder shall also provide proof of forty-eight hours of: Approved classroom training covering this chapter, the national electrical code, or electrical theory; or equivalent classroom training taken as part of an approved apprenticeship program under chapter 49.04 RCW or an approved electrical training program under RCW 19.28.191(1)(e). A biennial fee shall be charged for the issuance or renewal of the certificate. The department shall set the fee by rule. The fee shall cover but not exceed the cost of administering and enforcing the trainee certification and supervision requirements of this chapter.
(c)(i) Apprentices and individuals learning the electrical construction trade shall have their electrical training certificates in their possession at all times that they are performing electrical work. They shall show their certificates to an authorized representative of the department at the representative's request.
(ii) Unless working in a specialty, apprentices and individuals learning the electrical construction trade must also have in their possession proof of apprenticeship or training program registration. They shall show their apprenticeship or training program registration documents to an authorized representative of the department at the representative's request.
(3) Any person who has been issued an electrical training certificate under this chapter may work: (a) If that person is under supervision, and is (b) unless working in a specialty, (i) registered in an approved journey level apprenticeship program, as appropriate; or (ii) learning the electrical construction trade in a program described in RCW 19.28.191(1)(e) for a journey level certificate of competency. Supervision shall consist of a person being on the same jobsite and under the control of either a certified master journey level electrician, journey level electrician, master specialty electrician working in that electrician's specialty, or specialty electrician working in that electrician's specialty. Either a certified master journey level electrician, journey level electrician, master specialty electrician working in that electrician's specialty, or specialty electrician working in that electrician's specialty shall be on the same jobsite as the noncertified individual for a minimum of seventy-five percent of each working day unless otherwise provided in this chapter.
(4) The ratio of noncertified individuals to certified master journey level electricians, journey level electricians, master specialty electricians, or specialty electricians on any one jobsite is as follows:
(a) When working as a specialty electrician, not more than two noncertified individuals for every certified master specialty electrician working in that electrician's specialty, specialty electrician working in that electrician's specialty, master journey level electrician, or journey level electrician, except that the ratio requirements are one certified master specialty electrician working in that electrician's specialty, specialty electrician working in that electrician's specialty, master journey level electrician, or journey level electrician working as a specialty electrician to no more than four students enrolled in and working as part of an electrical construction program at public community or technical colleges, or not-for-profit nationally accredited trade or technical schools licensed by the workforce training and education coordinating board under chapter 28C.10 RCW. In meeting the ratio requirements for students enrolled in an electrical construction program at a trade school, a trade school may receive input and advice from the electrical board; and
(b) When working as a journey level electrician, not more than one noncertified individual for every certified master journey level electrician or journey level electrician, except that the ratio requirements shall be one certified master journey level electrician or journey level electrician to no more than four students enrolled in and working as part of an electrical construction program at public community or technical colleges, or not-for-profit nationally accredited trade or technical schools licensed by the workforce t
The text continues in the official source.
