LEGALDIGMLEGALDIGM
    ← Code of Federal Regulations
    Beta
    9 CFR § 590.149

    9 CFR § 590.149 — § 590.149 Conditions for receiving inspection.

    Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.

    Analyze this law with AI
    § 590.149 Conditions for receiving inspection. (a) Before receiving Federal inspection, a plant must have developed written sanitation Standard Operating Procedures, in accordance with part 416 and § 591.1(a) of this chapter. (b) Before receiving Federal inspection, a plant must conduct a hazard analysis, and develop and implement a HACCP plan, in accordance with part 417 and § 591.1(a) of this chapter. A conditional grant of inspection may be provided for a period not to exceed 90 days, during which period the facility must validate its HACCP plan. (c) Before producing new product for distribution in commerce, a plant must conduct a hazard analysis and develop a HACCP plan applicable to that product, in accordance with § 417.2 of this chapter. During a period not to exceed 90 days after the date the new product is produced for distribution in commerce, the plant must validate its HACCP plan, in accordance with § 417.4 of this chapter. [85 FR 68675, Oct. 29, 2020; 85 FR 81340, Dec. 16, 2020]

    Related guides, FAQ and contract templates