Beta
25 CFR § 175.230
25 CFR § 175.230 — § 175.230 Why are changes to purchased power costs not included in the procedure for adjusting electric power rates?
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.
Analyze this law with AI§ 175.230 Why are changes to purchased power costs not included in the procedure for adjusting electric power rates?
Changes to purchased power costs are not included in the procedure for adjusting electric power rates because unforeseen increases in the cost of purchased power are:
(a) Not under our control;
(b) Determined by current market rates; and
(c) Subject to market fluctuations that can occur at an undetermined time and frequency.
