Beta
24 CFR § 965.407
24 CFR § 965.407 — § 965.407 Reevaluations of mastermeter systems.
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.
Analyze this law with AI§ 965.407 Reevaluations of mastermeter systems.
Because of changes in the cost of utility services and the periodic changes in utility regulations, PHAs with mastermeter systems are required to reevaluate mastermeter systems without checkmeters by making benefit/cost analyses at least every 5 years. These analyses may be omitted under the conditions specified in § 965.406.
