    § 51.105 Exceptions. (a) Flexibility for non-acoustic benefits. Where it is determined that program objectives cannot be achieved on sites meeting the acceptability standard of 65 decibels, the Acceptable Zone may be shifted to L dn 70 on a case-by-case basis if all the following conditions are satisfied: (1) The project does not require an Environmental Impact Statement under provisions of § 51.104(b)(1) and noise is the only environmental issue. (2) The project has received a Special Environmental Clearance and has received the concurrence of the Environmental Clearance Officer. (3) The project meets other program goals to provide housing in proximity to employment, public facilities and transportation. (4) The project is in conformance with local goals and maintains the character of the neighborhood. (5) The project sponsor has set forth reasons, acceptable to HUD, as to why the noise attenuation measures that would normally be required for new construction in the L dn 65 to L dn 70 zone cannot be met. (6) Other sites which are not exposed to noise above L dn 65 and which meet program objectives are generally not available. The above factors shall be documented and made part of the project file. [44 FR 40861, July 12, 1979, as amended at 61 FR 13334, Mar. 26, 1996]

    Related guides, FAQ and contract templates