Beta
23 CFR § 750.307
23 CFR § 750.307 — § 750.307 FHWA project approval.
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.
Analyze this law with AI§ 750.307 FHWA project approval.
Authorization to proceed with acquisitions on a sign removal project shall not be issued until such time as the State has submitted to FHWA the following:
(a) A general description of the project.
(b) The total number of signs to be acquired.
(c) The total estimated cost of the sign removal project, including a breakdown of incidental, acquisition and removal costs.
