LEGALDIGMLEGALDIGM
    ← Code of Federal Regulations
    Beta
    23 CFR § 661.37

    23 CFR § 661.37 — § 661.37 What are the funding limitations on an individual TTF bridge project?

    Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.

    Analyze this law with AI
    § 661.37 What are the funding limitations on an individual TTF bridge project? The following funding provisions apply in administration of the TTFBP: (a) There are no funding limitations on an individual TTF bridge application, but the PE estimated cost will be based on the following fee scale: Estimated Construction Cost: Up to $1,000,000—Use up to 20% for PE $1,000,000 to $5,000,000—Use up to 15%-20% for PE $5,000,000 to $10,000,000—Use up to 10%-15% for PE Over $10,000,000—Use up to 10% for PE (b) Requests for additional funds for PE or construction may be submitted along with proper justification to FHWA for consideration. The request will be considered on a case-by-case basis. There is no guarantee for the approval of the request for additional funds.

    Related guides, FAQ and contract templates