Beta
23 CFR § 636.208
23 CFR § 636.208 — § 636.208 May I use my existing prequalification procedures with design-build contracts?
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.
Analyze this law with AI§ 636.208 May I use my existing prequalification procedures with design-build contracts?
Yes, you may use your existing prequalification procedures for either construction or engineering design firms as a supplement to the procedures in this part.
