Beta
21 CFR § 26.13
21 CFR § 26.13 — § 26.13 Transmission of postapproval inspection reports.
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.
Analyze this law with AI§ 26.13 Transmission of postapproval inspection reports.
Postapproval good manufacturing practice (GMP) inspection reports concerning products covered by this subpart will be transmitted to the authority of the importing country within 60-calendar days of the request. Should a new inspection be needed, the inspection report will be transmitted within 90-calendar days of the request.
