LEGALDIGMLEGALDIGM
    ← Code of Federal Regulations
    Beta
    19 CFR § 113.43

    19 CFR § 113.43 — § 113.43 Extension of time period.

    Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.

    Analyze this law with AI
    § 113.43 Extension of time period. (a) Application received within time period. If a document referred to in § 113.42 is not produced within 120 days from the date of the transaction in connection with which the bond was given, the port director or an appropriate CBP officer, in his or her discretion, and upon written application of the importer, may extend the period for one further period not to exceed 60 days. (b) Late application. No application for the extension of the period of any bond given to assure the production of a missing document will be allowed by the port director if the application is received later than 60 days after the expiration of the period of the bond, and any extension will not be allowed by the port director for a period of more than 60 days from the date of expiration of the period. (c) Acceptance of a free-entry or reduced-duty document prior to liquidation. When a bond is given for the production of any free-entry or reduced-duty document and a satisfactory document is produced prior to liquidation of the entry or within the period during which a valid reliquidation may be completed, provided the failure to file was not due to willful negligence or fraudulent intent, it will be accepted as satisfying the requirement that it be filed in connection with the entry, and the bond charge for its production will be cancelled. [T.D. 84-213, 49 FR 41171, Oct. 19, 1984, as amended by T.D. 85-167, 50 FR 40363, Oct. 3, 1985; CBP Dec. 15-15, 80 FR 70167, Nov. 13, 2015]

    Related guides, FAQ and contract templates