Beta
10 CFR § 963.10
10 CFR § 963.10 — § 963.10 Scope.
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.
Analyze this law with AI§ 963.10 Scope.
(a) The scope of this subpart includes the following for both the preclosure and postclosure periods:
(1) The bases for the suitability determination for the Yucca Mountain site as a location for a geologic repository;
(2) The suitability evaluation methods for applying the site suitability criteria to a geologic repository at the Yucca Mountain site; and
(3) The site suitability criteria that DOE will apply in accordance with section 113(b)(1)(A)(iv) of the NWPA.
(b) DOE will seek NRC concurrence on any future revisions to this subpart.
