LEGALDIGMLEGALDIGM
    ← Code of Federal Regulations
    Beta
    10 CFR § 904.6

    10 CFR § 904.6 — § 904.6 Charge for capacity and firm energy.

    Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.

    Analyze this law with AI
    § 904.6 Charge for capacity and firm energy. The charge for Capacity and Firm Energy from the Project shall be composed of two separate charges; a charge to provide for the basic revenue requirements, as identified in paragraphs (b), (c), and (d) of § 904.5 of these General Regulations (Base Charge), and a charge to provide the surplus revenue for the Lower Colorado River Basin Development Fund contribution, as identified in paragraph (e) of § 904.5 of these General Regulations (Lower Basin Development Fund Contribution Charge).

    Related guides, FAQ and contract templates