10 CFR § 50.55a — § 50.55a Codes and standards.
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.
Analyze this law with AI§ 50.55a Codes and standards.
(a) Documents approved for incorporation by reference. The material listed in this paragraph (a) is incorporated by reference into this section with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. All approved material is available for inspection at the Nuclear Regulatory Commission (NRC) and at the National Archives and Records Administration (NARA). Contact the NRC at NRC Technical Library, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland 20852; telephone: 301-415-7000; email: Library.Resource@nrc.gov. For information on the availability of this material at NARA, visit www.archives.gov/federal-register/cfr/ibr-locations or email fr.inspection@nara.gov. The material may be obtained from the following sources in this paragraph (a).
(1) American Society of Mechanical Engineers (ASME), Three Park Avenue, New York, NY 10016; telephone: 1-800-843-2763; https://www.asme.org/Codes/.
(i) ASME Boiler and Pressure Vessel Code, Section III. The editions and addenda for Section III of the ASME Boiler and Pressure Vessel Code (excluding Nonmandatory Appendices) are listed in this paragraph (a)(1)(i), but limited by those provisions identified in paragraph (b)(1) of this section.
(A) “Rules for Construction of Nuclear Vessels:”
( 1 ) 1963 Edition,
( 2 ) Summer 1964 Addenda,
( 3 ) Winter 1964 Addenda,
( 4 ) 1965 Edition,
( 5 ) 1965 Summer Addenda,
( 6 ) 1965 Winter Addenda,
( 7 ) 1966 Summer Addenda,
( 8 ) 1966 Winter Addenda,
( 9 ) 1967 Summer Addenda,
( 10 ) 1967 Winter Addenda,
( 11 ) 1968 Edition,
( 12 ) 1968 Summer Addenda,
( 13 )1968 Winter Addenda,
( 14 ) 1969 Summer Addenda,
( 15 ) 1969 Winter Addenda,
( 16 ) 1970 Summer Addenda, and
( 17 ) 1970 Winter Addenda.
(B) “Rules for Construction of Nuclear Power Plant Components:”
( 1 ) 1971 Edition,
( 2 ) 1971 Summer Addenda,
( 3 ) 1971 Winter Addenda,
( 4 ) 1972 Summer Addenda,
( 5 ) 1972 Winter Addenda,
( 6 ) 1973 Summer Addenda, and
( 7 ) 1973 Winter Addenda.
(C) “Division 1 Rules for Construction of Nuclear Power Plant Components:”
( 1 ) 1974 Edition,
( 2 ) 1974 Summer Addenda,
( 3 ) 1974 Winter Addenda,
( 4 ) 1975 Summer Addenda,
( 5 ) 1975 Winter Addenda,
( 6 ) 1976 Summer Addenda, and
( 7 ) 1976 Winter Addenda;
(D) “Rules for Construction of Nuclear Power Plant Components—Division 1”;
( 1 ) 1977 Edition,
( 2 ) 1977 Summer Addenda,
( 3 ) 1977 Winter Addenda,
( 4 ) 1978 Summer Addenda,
( 5 ) 1978 Winter Addenda,
( 6 ) 1979 Summer Addenda,
( 7 ) 1979 Winter Addenda,
( 8 ) 1980 Edition,
( 9 ) 1980 Summer Addenda,
( 10 ) 1980 Winter Addenda,
( 11 ) 1981 Summer Addenda,
( 12 ) 1981 Winter Addenda,
( 13 ) 1982 Summer Addenda,
( 14 ) 1982 Winter Addenda,
( 15 ) 1983 Edition,
( 16 ) 1983 Summer Addenda,
( 17 ) 1983 Winter Addenda,
( 18 ) 1984 Summer Addenda,
( 19 ) 1984 Winter Addenda,
( 20 ) 1985 Summer Addenda,
( 21 ) 1985 Winter Addenda,
( 22 ) 1986 Edition,
( 23 ) 1986 Addenda,
( 24 ) 1987 Addenda,
( 25 ) 1988 Addenda,
( 26 ) 1989 Edition,
( 27 ) 1989 Addenda,
( 28 ) 1990 Addenda,
( 29 ) 1991 Addenda,
( 30 ) 1992 Edition,
( 31 ) 1992 Addenda,
( 32 ) 1993 Addenda,
( 33 ) 1994 Addenda,
( 34 ) 1995 Edition,
( 35 ) 1995 Addenda,
( 36 ) 1996 Addenda, and
( 37 ) 1997 Addenda.
(E) “Rules for Construction of Nuclear Facility Components—Division 1:”
( 1 ) 1998 Edition,
( 2 ) 1998 Addenda,
( 3 ) 1999 Addenda,
( 4 ) 2000 Addenda,
( 5 ) 2001 Edition,
( 6 ) 2001 Addenda,
( 7 ) 2002 Addenda,
( 8 ) 2003 Addenda,
( 9 ) 2004 Edition,
( 10 ) 2005 Addenda,
( 11 ) 2006 Addenda,
( 12 ) 2007 Edition,
( 13 ) 2008 Addenda,
( 14 ) 2009b Addenda (including Subsection NCA; and Division 1 subsections NB through NH and Appendices),
( 15 ) 2010 Edition (including Subsection NCA; and Division 1 subsections NB through NH and Appendices),
( 16 ) 2011a Addenda (including Subsection NCA; and Division 1 subsections NB through NH and Appendices),
( 17 ) 2013 Edition (including Subsection NCA; and Division 1 subsections NB through NH and Appendices),
( 18 ) 2015 Edition (including Subsection NCA; and Division 1 subsections NB through NH and Appendices);
( 19 ) 2017 Edition (including Subsection NCA; and Division 1 subsections NB through NG and Appendices);
( 20 ) 2019 Edition (including Subsection NCA; and Division 1 subsections NB through NG and Appendices); and
( 21 ) 2021 Edition (including Subsection NCA; and Division 1 subsections NB through NG and Appendices).
(ii) ASME Boiler and Pressure Vessel Code, Section XI. The editions and addenda for Section XI of the ASME Boiler and Pressure Vessel Code are listed in this paragraph (a)(1)(ii), but limited by those provisions identified in paragraph (b)(2) of this section.
(A) [Reserved]
(B) “Rules for Inservice Inspection of Nuclear Power Plant Components:”
( 1 ) 1974 Edition;
( 2 ) 1974 Summer Addenda;
( 3 ) 1974 Winter Addenda; and
( 4 ) 1975 Summer Addenda.
(C) “Rules for Inservice Inspection of Nuclear Power Plant Components—Division 1:”
( 1 )-( 32 ) [Reserved]
( 33 ) 1995 Edition;
( 34 ) 1995 Addenda;
( 35 ) 1996 Addenda;
( 36 ) 1997 Addenda;
( 37 )-( 40 ) [Reserved]
( 41 ) 2001 Edition;
( 42 ) 2001 Addenda;
( 43 ) 2002 Addenda;
( 44 ) 2003 Addenda;
( 45 ) 2004 Edition;
( 46 ) 2005 Addenda;
( 47 ) 2006 Addenda;
( 48 ) 2007 Edition;
( 49 ) 2008 Addenda;
( 50 ) 2009b Addenda;
( 51 ) 2010 Edition;
( 52 ) 2011a Addenda;
( 53 ) 2013 Edition;
( 54 ) 2015 Edition;
( 55 ) 2017 Edition;
( 56 ) 2019 Edition; and
( 57 ) 2021 Edition.
(iii) ASME Code Cases: Nuclear Components —(A) ASME BPV Code Case N-513-3 Mandatory Appendix I. ASME BPV Code Case N-513-3, “Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1,” Mandatory Appendix I, “Relations for F m , F b , and F for Through-Wall Flaws” (Approval Date: January 26, 2009). ASME BPV Code Case N-513-3 Mandatory Appendix I is referenced in paragraph (b)(2)(xxxiv)(B) of this section.
(B) ASME BPV Code Case N-722-1. ASME BPV Code Case N-722-1, “Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated with Alloy 600/82/182 Materials, Section XI, Division 1” (Approval Date: January 26, 2009), with the conditions in paragraph (g)(6)(ii)(E) of this section.
(C) ASME BPV Code Case N-729-6. ASME BPV Code Case N-729-6, “Alternative Examination Requirements for PWR Reactor Vessel Upper Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds Section XI, Division 1” (Approval Date: March 3, 2016), with the conditions in paragraph (g)(6)(ii)(D) of this section.
(D) ASME BPV Code Case N-770-7. ASME BPV Code Case N-770-7, “Alternative Examination Requirements and Acceptance Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated with UNS N06082 or UNS W86182 Weld Filler Material With or Without Application of Listed Mitigation Activities Section XI, Division 1” (Approval Date: December 4, 2020), with the conditions in paragraph (g)(6)(ii)(F) of this section.
(E) [Reserved]
(F) ASME BPV Code Case N-852. ASME BPV Code Case N-852, “Application of the ASME NPT Stamp, Section III, Division 1; Section III, Division 2; Section III, Division 3; Section III, Division 5” (Approval Date: February 9, 2015). ASME BPV Code Case N-852 is referenced in paragraph (b)(1)(ix) of this section.
(G) [Reserved]
(H) ASME OM Code Case OMN-28. ASME OM Case OMN-28, “Alternative Valve Position Verification Approach to Satisfy ISTC-3700 for Valves Not Susceptible to Stem-Disk Separation.” Issued March 4, 2021. OMN-28 is referenced in paragraph (b)(3)(xi) of this section.
(iv) ASME Operation and Maintenance Code. The editions and addenda for the ASME Operation and Maintenance of Nuclear Power Plants are listed in this paragraph (a)(1)(iv), but limited by those provisions identified in paragraph (b)(3) of this section.
(A) “Code for Operation and Maintenance of Nuclear Power Plants:”
( 1 ) 1995 Edition;
( 2 ) 1996 Addenda;
( 3 ) 1997 Addenda;
( 4 ) 1998 Edition;
( 5 ) 1999 Addenda;
( 6 ) 2000 Addenda;
( 7 ) 2001 Edition;
( 8 ) 2002 Addenda;
( 9 ) 2003 Addenda;
( 10 ) 2004 Edition;
( 11 ) 2005 Addenda; and
( 12 ) 2006 Addenda.
(B) “Operation and Maintenance of Nuclear Power Plants, Division 1: Section IST Rules for Inservice Testing of Light-Water Reactor Power Plants:”
( 1 ) 2009 Edition.
( 2 ) [Reserved]
(C) Operation and Maintenance of Nuclear Power Plants, “Division 1: OM Code: Section IST”:
( 1 ) 2012 Edition;
( 2 ) 2017 Edition;
( 3 ) 2020 Edition; and
( 4 ) 2022 Edition.
(v) ASME Quality Assurance Requirements. (A) ASME NQA-1, “Quality Assurance Program Requirements for Nuclear Facilities:”
( 1 ) NQA-1—1983 Edition;
( 2 ) NQA-1a—1983 Addenda;
( 3 ) NQA-1b—1984 Addenda;
( 4 ) NQA-1c—1985 Addenda;
( 5 ) NQA-1—1986 Edition;
( 6 ) NQA-1a—1986 Addenda;
( 7 ) NQA-1b—1987 Addenda;
( 8 ) NQA-1c—1988 Addenda;
( 9 ) NQA-1—1989 Edition;
( 10 ) NQA-1a—1989 Addenda;
( 11 ) NQA-1b—1991 Addenda; and
( 12 ) NQA-1c—1992 Addenda.
(B) ASME NQA-1, “Quality Assurance Requirements for Nuclear Facility Applications:”
( 1 ) NQA-1—1994 Edition;
( 2 ) NQA-1—2008 Edition;
( 3 ) NQA-1a—2009;
( 4 ) NQA-1b—2011 Addenda;
( 5 ) NQA-1—2012; and
( 6 ) NQA-1—2015.
(2) Institute of Electrical and Electronics Engineers (IEEE) Service Center, 445 Hoes Lane, Piscataway, NJ 08855; telephone: 1-800-678-4333; http://ieeexplore.ieee.org.
(i) IEEE standard 279-1968. (IEEE Std 279-1968), “Proposed IEEE Criteria for Nuclear Power Plant Protection Systems” (Approval Date: August 30, 1968), referenced in paragraph (h)(2) of this section. (Copies of this document may be purchased from IHS Global, 15 Inverness Way East, Englewood, CO 80112; https://global.ihs.com. )
(ii) IEEE standard 279-1971. (IEEE Std 279-1971), “Criteria for Protection Systems for Nuclear Power Generating Stations” (Approval Date: June 3, 1971), referenced in paragraph (h)(2) of this section.
(iii) IEEE standard 603-1991. (IEEE Std 603-1991), “Standard Criteria for Safety Systems for Nuclear Power Generating Stations” (Approval Date: June 27, 1991), referenced in paragraphs (h)(2) and (h)(3) of this section. All other standards that are referenced in IEEE Std 603-1991 are not approved for incorporation by reference.
(iv) IEEE standard 603-1991, correction sheet. (IEEE Std 603-1991 correction sheet), “Standard Criteria for Safety Systems for Nuclear Power Generating Stations, Correction Sheet, Issued January 30, 1995,” referenced in paragraphs (h)(2) and (h)(3) of this section. (This correction sheet is available from IEEE at http://standards.ieee.org/findstds/errata/ ).
(3) U.S. Nuclear Regulatory Commission (NRC): Public Document Room, 11555 Rockville Pike, Rockville, Maryland 20852; telephone: 1-800-397-4209; email: pdr.resource@nrc.gov; https://www.nrc.gov/reading-rm/doc-collections/reg-guides/. The use of code cases listed in the NRC regulatory guides in paragraphs (a)(3)(i) through (iii) of this section is acceptable with the specified conditions in those guides when implementing the editions and addenda of the ASME BPV Code and ASME OM Code incorporated by reference in paragraph (a)(1) of this section. The NRC report in paragraph (a)(3)(iv) of this section is acceptable as specified in the conditions when implementing code cases listed in the NRC regulatory guides in paragraphs (a)(3)(i) through (iii) of this section.
(i) NRC Regulatory Guide 1.84, Revision 40. NRC Regulatory Guide 1.84, Revision 40, “Design, Fabrication, and Materials Code Case Acceptability, ASME Section III,” issued March 2024, with the requirements in paragraph (b)(4) of this section.
(ii) NRC Regulatory Guide 1.147, Revision 21. NRC Regulatory Guide 1.147, Revision 21, “Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1,” issued March 2024, which lists ASME Code Cases that the NRC has approved in accordance with the requirements in paragraph (b)(5) of this section.
(iii) NRC Regulatory Guide 1.192, Revision 5. NRC Regulatory Guide 1.192, Revision 5, “Operation and Maintenance Code Case Acceptability, ASME OM Code,” issued March 2024, which lists ASME Code Cases that the NRC has approved in accordance with the requirements in paragraph (b)(6) of this section.
(iv) NUREG-2228. NUREG-2228, “Weld Residual Stress Finite Element Analysis Validation: Part II—Proposed Validation Procedure,” published July 2020 (including Errata September 22, 2021), which is referenced in RG 1.147, Revision 21.
(4) Electric Power Research Institute, Materials Reliability Program, 3420 Hillview Avenue, Palo Alto, CA 94304-1338; telephone: 1-650-855-2000; http://www.epri.com.
(i) “Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A)”, EPRI approval date: November 2016.
(ii) [Reserved]
(b) Use and conditions on the use of standards. Systems and components of boiling and pressurized water-cooled nuclear power reactors must meet the requirements of the ASME BPV Code and the ASME OM Code as specified in this paragraph (b). Each combined license for a utilization facility is subject to the following conditions.
(1) Conditions on ASME BPV Code Section III. Each manufacturing license, standard design approval, and design certification under 10 CFR part 52 is subject to the following conditions. As used in this section, references to Section III refer to Section III of the ASME BPV Code and include the 1963 Edition through 1973 Winter Addenda and the 1974 Edition (Division 1) through the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section, subject to the following conditions:
(i) Section III condition: Section III materials. When applying the 1992 Edition of Section III, applicants or licensees must apply the 1992 Edition with the 1992 Addenda of Section II of the ASME Boiler and Pressure Vessel Code.
(ii) Section III condition: Weld leg dimensions. When applying the 1989 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1) of this section, applicants and licensees may not apply the Section III provisions identified in table 1 to this paragraph (b)(1)(ii) for welds with leg size less than 1.09 t n :
Table 1 to Paragraph (b)(1)(ii) —Prohibited Code Provisions
Editions and addenda
Code provision
1989 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section
Subparagraph NB-3683.4(c)(1); Subparagraph NB-3683.4(c)(2).
1989 Addenda through 2003 Addenda
Footnote 11 to Figure NC-3673.2(b)-1; Note 11 to Figure ND-3673.2(b)-1.
2004 Edition through 2010 Edition
Footnote 13 to Figure NC-3673.2(b)-1; Note 13 to Figure ND-3673.2(b)-1.
2011 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section
Footnote 11 to Table NC-3673.2(b)-1; Note 11 to Table ND-3673.2(b)-1.
(iii) Section III condition: Seismic design of piping. Applicants or licensees may use Subarticles NB-3200, NB-3600, NC-3600, and ND-3600 for seismic design of piping, up to and including the 1993 Addenda, subject to the condition specified in paragraph (b)(1)(ii) of this section. Applicants or licensees may not use these subarticles for seismic design of piping in the 1994 Addenda through the 2005 Addenda incorporated by reference in paragraph (a)(1) of this section, except that Subarticle NB-3200 in the 2004 Edition through the 2017 Edition may be used by applicants and licensees, subject to the condition in paragraph (b)(1)(iii)(A) of this section. Applicants or licensees may use Subarticles NB-3600, NC-3600, and ND-3600 for the seismic design of piping in the 2006 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section, subject to the conditions of this paragraph (b)(1)(iii) corresponding to those subarticles.
(A) Seismic design of piping: First provision. When applying Note (1) of Figure NB-3222-1 for Level B service limits, the calculation of Pb stresses must include reversing dynamic loads (including inertia earthquake effects) if evaluation of these loads is required by NB-3223(b).
(B) Seismic design of piping: Second provision. For Class 1 piping, the material and Do/t requirements of NB-3656(b) must be met for all Service Limits when the Service Limits include reversing dynamic loads, and the alternative rules for reversing dynamic loads are used.
(iv) Section III condition: Quality Assurance. When applying editions and addenda later than the 1989 Edition of Section III, an applicant or licensee may use the requirements of NQA-1, “Quality Assurance Requirements for Nuclear Facility Applications,” that is both incorporated by reference in paragraph (a)(1)(v) of this section and specified in either NCA-4000 or NCA-7000 of that Edition and Addenda of Section III, with the exceptions in paragraph (b)(1)(iv)(A) of this section, provided that the administrative, quality, and technical provisions contained in that Edition and Addenda of Section III are used in conjunction with the applicant's or licensee's appendix B to this part quality assurance program; and that the applicant's or licensee's Section III activities comply with those commitments contained in the applicant's or licensee's quality assurance program description. Where NQA-1 and Section III do not address the commitments contained in the applicant's or licensee's appendix B quality assurance program description, those licensee commitments must be applied to Section III activities.
(A) Subpart 2.19 in NQA-1-2017, NQA-1-2019, and NQA-1-2022 is not approved for use.
(B) [Reserved]
(v) Section III condition: Independence of inspection. Applicants or licensees may not apply the exception in NCA-4134.10(a) of Section III, 1995 Edition through 2009b Addenda of the 2007 Edition, from paragraph 3.1 of Supplement 10S-1 of NQA-1-1994 Edition.
(vi) Section III condition: Subsection NH. The provisions in Subsection NH, “Class 1 Components in Elevated Temperature Service,” 1995 Addenda through all editions and addenda up to and including the 2013 Edition incorporated by reference in paragraph (a)(1) of this section, may only be used for the design and construction of Type 316 stainless steel pressurizer heater sheaths where service conditions do not cause the components to reach temperatures exceeding 900 °F. This condition is not applicable to the 2015 Edition and later editions.
(vii) Section III condition: Capacity certification and demonstration of function of incompressible-fluid pressure-relief valves. When applying the 2006 Addenda through all editions and addenda up to and including the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section, applicants and licensees may use paragraph NB-7742, except that paragraph NB-7742(a)(2) may not be used. For a valve design of a single size to be certified over a range of set pressures, the demonstration of function tests under paragraph NB-7742 must be conducted as prescribed in NB-7732.2 on two valves covering the minimum set pressure for the design and the maximum set pressure that can be accommodated at the demonstration facility selected for the test.
(viii) Section III condition: Use of ASME certification marks. When applying editions and addenda earlier than the 2011 Addenda to the 2010 Edition, licensees may use either the ASME BPV Code Symbol Stamps or the ASME Certification Marks with the appropriate certification designators and class designators as specified in the 2013 Edition through the latest edition and addenda incorporated by reference in paragraph (a)(1) of this section.
(ix) Section III Condition: NPT Code Symbol Stamps. Licensees may use the NPT Code Symbol Stamp with the letters arranged horizontally as specified in ASME BPV Code Case N-852 for the service life of a component that had the NPT Code Symbol Stamp applied during the time period from January 1, 2005, through December 31, 2015.
(x) Section III Condition: Visual examination of bolts, studs and nuts. Applicants or licensees applying the provisions of NB-2582, NC-2582, ND-2582, NE-2582, NF-2582, NG-2582 in the 2017 Edition of Section III through the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section, must apply paragraphs (b)(1)(x)(A) and (B) of this section.
(A) Visual examination of bolts, studs, and nuts: First provision. When applying the provisions of NB-2582, NC-2582, ND-2582, NE-2582, NF-2582, NG-2582 in the 2017 Edition of Section III through the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section, the visual examinations are required to be performed in accordance with procedures qualified to NB-5100, NC-5100, ND-5100, NE-5100, NF-5100, NG-5100 and performed by personnel qualified in accordance with NB-5500, NC-5500, ND-5500, NE-5500, NF-5500, and NG-5500.
(B) Visual examination of bolts, studs, and nuts: Second provision. When applying the provisions of NB-2582, NC-2582, ND-2582, NE-2582, NF-2582, and NG-2582 in the 2017 Edition of Section III through the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section, bolts, studs, and nuts must be visually examined for discontinuities including cracks, bursts, seams, folds, thread lap, voids, and tool marks.
(xi) Section III condition: Mandatory Appendix XXVI. When applying the 2015 and 2017 Editions of Section III, Mandatory Appendix XXVI, “Rules for Construction of Class 3 Buried Polyethylene Pressure Piping,” applicants or licensees must meet the first provision in paragraph (b)(1)(xi)(A) of this section. When applying the 2015 through 2021 Editions of Section III, Mandatory Appendix XXVI, “Rules for Construction of Class 3 Buried Polyethylene Pressure Piping,” applicants or licensees must meet the second provision in paragraph (b)(1)(xi)(B) of this section. When applying the 2017 Edition of Section III, Mandatory Appendix XXVI, “Rules for Construction of Class 3 Buried Polyethylene Pressure Piping,” applicants or licensees must meet the third provision in paragraph (b)(1)(xi)(C) of this section.
(A) Mandatory Appendix XXVI: First provision. When performing fusing procedure qualification testing in accordance with XXVI-2300 and XXVI-4330 the following essential variables must be used for the performance qualification tests of butt fusion joints:
( 1 ) Joint Type: A change in the type of joint from that qualified, except that a square butt joint qualifies as a mitered joint.
( 2 ) Pipe Surface Alignment: A change in the pipe outside diameter (O.D.) surface misalignment of more than 10 percent of the wall thickness of the thinner member to be fused.
( 3 ) PE Material: Each lot of polyethylene source material to be used in production (XXVI-2310(c)).
( 4 ) Wall Thickness: Each thickness to be fused in production (XXVI-2310(c)).
( 5 ) Diameter: Each diameter to be fused in production (XXVI-2310(c)).
( 6 ) Cross-sectional Area: Each combination of thickness and diameter (XXVI-2310(c)).
( 7 ) Position: Maximum machine carriage slope when greater than 20 degrees from horizontal (XXVI-4321(c)).
( 8 ) Heater Surface Temperature: A change in the heater surface temperature to a value beyond the range tested (XXVI-2321).
( 9 ) Ambient Temperature: A change in ambient temperature to less than 50 °F (10 °C) or greater than 125 °F (52 °C) (XXVI-4412(b)).
( 10 ) Interfacial Pressure: A change in interfacial pressure to a value beyond the range tested (XXVI-2321).
( 11 ) Decrease in Melt Bead Width: A decrease in melt bead size from that qualified.
( 12 ) Increase in Heater Removal Time: An increase in heater plate removal time from that qualified.
( 13 ) Decrease in Cool-down Time: A decrease in the cooling time at pressure from that qualified.
( 14 ) Fusing Machine Carriage Model: A change in the fusing machine carriage model from that tested (XXVI-2310(d)).
(B) Mandatory Appendix XXVI: Second provision. When performing procedure qualification for high speed tensile impact testing of butt fusion joints in accordance with XXVI-2300 or XXVI-4330 of the 2015 through 2021 Editions of BPV Code Section III, breaks in the specimen that are away from the fusion zone require the test plot yield strength to be evaluated to confirm sound base material. If the base material failed (broke) at less than minimum required base material yield strength, a retest is required.
(C) Mandatory Appendix XXVI: Third provision. When performing fusing procedure qualification tests in accordance with 2017 Edition of BPV Code Section III XXVI-2300 and XXVI-4330, the following essential variables must be used for the testing of electrofusion joints:
( 1 ) Joint Design: A change in the design of an electrofusion joint.
( 2 ) Fit-up Gap: An increase in the maximum radial fit-up gap qualified.
( 3 ) Pipe PE Material: A change in the PE designation or cell classification of the pipe from that tested (XXVI-2322(a)).
( 4 ) Fitting PE Material: A change in the manufacturing facility or production lot from that tested (XXVI-2322(b)).
( 5 ) Pipe Wall Thickness: Each thickness to be fused in production (XXVI-2310(c)).
( 6 ) Fitting Manufacturer: A change in fitting manufacturer.
( 7 ) Pipe Diameter: Each diameter to be fused in production (XXVI-2310(c)).
( 8 ) Cool-down Time: A decrease in the cool time at pressure from that qualified.
( 9 ) Fusion Voltage: A change in fusion voltage.
( 10 ) Nominal Fusion Time: A change in the nominal fusion time.
( 11 ) Material Temperature Range: A change in material fusing temperature beyond the range qualified.
( 12 ) Power Supply: A change in the make or model of electrofusion control box (XXVI-2310(f)).
( 13 ) Power Cord: A change in power cord material, length, or diameter that reduces current at the coil to below the minimum qualified.
( 14 ) Processor: A change in the manufacturer or model number of the processor. (XXVI-2310(f)).
( 15 ) Saddle Clamp: A change in the type of saddle clamp.
( 16 ) Scraping Device: A change from a clean peeling scraping tool to any other type of tool.
(xii) Section III condition: Certifying Engineer. When applying the 2017 and later editions of ASME BPV Code Section III, the NRC does not permit applicants and licensees to use a Certifying Engineer who is not a Registered Professional Engineer qualified in accordance with paragraph XXIII-1222 for Code-related activities that are applicable to U.S. nuclear facilities regulated by the NRC. The use of paragraph XXIII-1223 is prohibited.
(xiii) Section III condition: Preservice Inspection of Steam Generator Tubes. Applicants or licensees applying the provisions of NB-5283 and NB-5360 in the 2019 Edition of Section III through the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section, must apply paragraphs (b)(1)(xiii)(A) and (B) of this section.
(A) Preservice Inspection of Steam Generator Tubes: First provision. When applying the provisions of NB-5283 in the 2019 Edition of Section III through the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section, a full-length preservice examination of 100 percent of the steam generator tubing in each newly installed steam generator must be performed prior to plant startup.
(B) Preservice Inspection of Steam Generator Tubes: Second provision. When applying the provisions of NB-5360 in the 2019 Edition of Section III through the latest edition and addenda incorporated by reference in paragraph (a)(1)(i) of this section, flaws revealed during preservice examination of steam generator tubing performed in accordance with paragraph (b)(1)(xiii)(A) of this section must be evaluated using the criteria in the design specifications.
(xiv) Section III condition: Repairs to Stamped Components. Applicants or licensees applying the provisions of NCA-8151, NCA-8500 and Nonmandatory Appendix NN in the 2021 Edition of Section III, are required to meet all of the requirements in Nonmandatory Appendix NN.
(2) Conditions on ASME BPV Code, Section XI. As used in this section, references to Section XI refer to Section XI, Division 1, in the editions and addenda of the ASME BPV Code incorporated by reference in paragraph (a)(1)(ii) of this section, subject to the following conditions:
(i) [Reserved]
(ii) Section XI condition: Pressure-retaining welds in ASME Code Class 1 piping (applies to Table IWB-2500 and IWB-2500-1 and Category B-J). If the facility's application for a construction permit was docketed prior to July 1, 1978, the extent of examination for Code Class 1 pipe welds may be determined by the requirements of Table IWB-2500 and Table IWB-2600 Category B-J of Section XI of the ASME BPV Code in the 1974 Edition and Addenda through the Summer 1975 Addenda or other requirements the NRC may adopt.
(iii)-(vii) [Reserved]
(viii) Section XI condition: Concrete containment examinations. Applicants or licensees applying Subsection IWL, 2001 Edition through the 2004 Edition, up to and including the 2006 Addenda, must apply paragraphs (b)(2)(viii)(E) through (G) of this section. Applicants or licensees applying Subsection IWL, 2007 Edition up to and including the 2008 Addenda must apply paragraph (b)(2)(viii)(E) of this section. Applicants or licensees applying Subsection IWL, 2007 Edition with the 2009 Addenda through the 2019 Edition, must apply paragraphs (b)(2)(viii)(H) and (I) of this section.
(A)-(D) [Reserved]
(E) Concrete containment examinations: Fifth provision. For Class CC applications, the applicant or licensee must evaluate the acceptability of inaccessible areas when conditions exist in accessible areas that could indicate the presence of or the result in degradation to such inaccessible areas. For each inaccessible area identified, the applicant or licensee must provide the following in the ISI Summary Report required by IWA-6000:
( 1 ) A description of the type and estimated extent of degradation, and the conditions that led to the degradation;
( 2 ) An evaluation of each area, and the result of the evaluation; and
( 3 ) A description of necessary corrective actions.
(F) Concrete containment examinations: Sixth provision. Personnel that examine containment concrete surfaces and tendon hardware, wires, or strands must meet the qualification provisions in IWA-2300. The “owner-defined” personnel qualification provisions in IWL-2310(d) are not approved for use.
(G) Concrete containment examinations: Seventh provision. Corrosion protection material must be restored following concrete containment post-tensioning system repair and replacement activities in accordance with the quality assurance program requirements specified in IWA-1400.
(H) Concrete containment examinations: Eighth provision. For each inaccessible area of concrete identified for evaluation under IWL-2512(a), or identified as susceptible to deterioration under IWL-2512(b), the licensee must provide the applicable information specified in paragraphs (b)(2)(viii)(E)( 1 ), ( 2 ), and ( 3 ) of this section in the ISI Summary Report required by IWA-6000.
(I) Concrete containment examinations: Ninth provision. During the period of extended operation of a renewed license under part 54 of this chapter, the licensee must perform the technical evaluation under IWL-2512(b) of inaccessible below-grade concrete surfaces exposed to foundation soil, backfill, or groundwater at periodic intervals not to exceed 5 years. In addition, the licensee must examine representative samples of the exposed portions of the below-grade concrete, when such below-grade concrete is excavated for any reason.
(ix) Section XI condition: Metal containment examinations. Applicants or licensees applying Subsection IWE, 2001 Edition up to and including the 2003 Addenda, must satisfy the requirements of paragraphs (b)(2)(ix)(A) and (B), (F) through (I), and (K) of this section. Applicants or licensees applying Subsection IWE, 2004 Edition, up to and including the 2005 Addenda, must satisfy the requirements of paragraphs (b)(2)(ix)(A) and (B), (F) through (H), and (K) of this section. Applicants or licensees applying Subsection IWE, 2004 Edition with the 2006 Addenda, must satisfy the requirements of paragraphs (b)(2)(ix)(A)( 2 ) and (b)(2)(ix)(B) and (K) of this section. Applicants or licensees applying Subsection IWE, 2007 Edition through the 2015 Edition, must satisfy the requirements of paragraphs (b)(2)(ix)(A)( 2 ) and (b)(2)(ix)(B), (J), and (K) of this section. Applicants or licensees applying Subsection IWE, 2017 Edition, through the 2019 Edition, must satisfy the requirements of paragraphs (b)(2)(ix)(A) (2) and (b)(2)(ix)(B) and (J) of this section. Applicants or licensees applying Subsection IWE, 2021 Edition, through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section must satisfy the requirements of paragraphs (b)(2)(ix)(B) and (J) of this section.
(A) Metal containment examinations: First provision. For Class MC applications, the following apply to inaccessible areas.
( 1 ) The applicant or licensee must evaluate the acceptability of inaccessible areas when conditions exist in accessible areas that could indicate the presence of or could result in degradation to such inaccessible areas.
( 2 ) For each inaccessible area identified for evaluation, the applicant or licensee must provide the following in the ISI Summary Report as required by IWA-6000:
( i ) A description of the type and estimated extent of degradation, and the conditions that led to the degradation;
( ii ) An evaluation of each area, and the result of the evaluation; and
( iii ) A description of necessary corrective actions.
(B) Metal containment examinations: Second provision. When performing remotely the visual examinations required by Subsection IWE, the maximum direct examination distance specified in Table IWA-2210-1 (2001 Edition through 2004 Edition) or Table IWA-2211-1 (2005 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1) of this section) may be extended and the minimum illumination requirements specified may be decreased provided that the conditions or indications for which the visual examination is performed can be detected at the chosen distance and illumination.
(C)-(E) [Reserved]
(F) Metal containment examinations: Sixth provision. VT-1 and VT-3 examinations must be conducted in accordance with IWA-2200. Personnel conducting examinations in accordance with the VT-1 or VT-3 examination method must be qualified in accordance with IWA-2300. The “owner-defined” personnel qualification provisions in IWE-2330(a) for personnel that conduct VT-1 and VT-3 examinations are not approved for use.
(G) Metal containment examinations: Seventh provision. The VT-3 examination method must be used to conduct the examinations in Items E1.12 and E1.20 of Table IWE-2500-1, and the VT-1 examination method must be used to conduct the examination in Item E4.11 of Table IWE-2500-1. An examination of the pressure-retaining bolted connections in Item E1.11 of Table IWE-2500-1 using the VT-3 examination method must be conducted once each interval. The “owner-defined” visual examination provisions in IWE-2310(a) are not approved for use for VT-1 and VT-3 examinations.
(H) Metal containment examinations: Eighth provision. Containment bolted connections that are disassembled during the scheduled performance of the examinations in Item E1.11 of Table IWE-2500-1 must be examined using the VT-3 examination method. Flaws or degradation identified during the performance of a VT-3 examination must be examined in accordance with the VT-1 examination method. The criteria in the material specification or IWB-3517.1 must be used to evaluate containment bolting flaws or degradation. As an alternative to performing VT-3 examinations of containment bolted connections that are disassembled during the scheduled performance of Item E1.11, VT-3 examinations of containment bolted connections may be conducted whenever containment bolted connections are disassembled for any reason.
(I) Metal containment examinations: Ninth provision. The ultrasonic examination acceptance standard specified in IWE-3511.3 for Class MC pressure-retaining components must also be applied to metallic liners of Class CC pressure-retaining components.
(J) Metal containment examinations: Tenth provision. In general, a repair/replacement activity such as replacing a large containment penetration, cutting a large construction opening in the containment pressure boundary to replace steam generators, reactor vessel heads, pressurizers, or other major equipment; or other similar modification is considered a major containment modification. When applying IWE-5000 to Class MC pressure-retaining components, any major containment modification or repair/replacement must be followed by a Type A test to provide assurance of both containment structural integrity and leak-tight integrity prior to returning to service, in accordance with appendix J to this part, Option A or Option B, on which the applicant's or licensee's Containment Leak-Rate Testing Program is based. When applying IWE-5000, if a Type A, B, or C Test is performed, the test pressure and acceptance standard for the test must be in accordance with appendix J to this part.
(K) Metal Containment Examinations: Eleventh provision. A general visual examination of containment leak chase channel moisture barriers must be performed once each interval, in accordance with the completion percentages in Table IWE 2411-1 of the 2017 Edition. Examination shall include the moisture barrier materials (caulking, gaskets, coatings, etc.) that prevent water from accessing the embedded containment liner within the leak chase channel system. Caps of stub tubes extending to or above the concrete floor interface may be inspected, provided the configuration of the cap functions as a moisture barrier as described previously. Leak chase channel system closures need not be disassembled for performance of examinations if the moisture barrier material is clearly visible without disassembly, or coatings are intact. The closures are acceptable if no damage or degradation exists that would allow intrusion of moisture against inaccessible surfaces of the metal containment shell or liner within the leak chase channel system. Examinations that identify flaws or relevant conditions shall be extended in accordance with paragraph IWE 2430 of the 2017 Edition.
(x) Section XI condition: Quality assurance. When applying the editions and addenda later than the 1989 Edition of ASME BPV Code, Section XI, licensees may use any edition or addenda of NQA-1, “Quality Assurance Requirements for Nuclear Facility Applications,” that is both incorporated by reference in paragraph (a)(1)(v) of this section and specified in Table IWA 1600-1 of that edition and addenda of Section XI, provided that the licensee uses its appendix B to this part quality assurance program in conjunction with Section XI requirements and the commitments contained in the licensee's quality assurance program description. Where NQA-1 and Section XI do not address the commitments contained in the licensee's appendix B quality assurance program description, those licensee commitments must be applied to Section XI activities.
(xi) [Reserved]
(xii) Section XI condition: Underwater welding. The provisions in IWA-4660, “Underwater Welding,” of Section XI, 2001 Edition through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section, are approved for use on irradiated material with the following conditions:
(A) Underwater welding: First provision. Licensees must obtain NRC approval in accordance with paragraph (z) of this section regarding the welding technique to be used prior to performing welding on ferritic material exposed to fast neutron fluence greater than 1 × 10
17 n/cm
2 (E > 1 MeV).
(B) Underwater welding: Second provision. Licensees must obtain NRC approval in accordance with paragraph (z) of this section regarding the welding technique to be used prior to performing welding on austenitic material other than P-No. 8 material exposed to thermal neutron fluence greater than 1 × 10
17 n/cm
2 (E < 0.5 eV). Licensees must obtain NRC approval in accordance with paragraph (z) regarding the welding technique to be used prior to performing welding on P-No. 8 austenitic material exposed to thermal neutron fluence greater than 1 × 10
17 n/cm
2 (E < 0.5 eV) and measured or calculated helium concentration of the material greater than 0.1 atomic parts per million.
(xiii) [Reserved]
(xiv) Section XI condition: Appendix VIII personnel qualification. All personnel qualified for performing ultrasonic examinations in accordance with Appendix VIII must receive 8 hours of annual hands-on training on specimens that contain cracks. Licensees applying the 2001 Edition through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section may use the annual practice requirements in VII-4240 of Appendix VII of Section XI in place of the 8 hours of annual hands-on training provided that the supplemental practice is performed on material or welds that contain cracks, or by analyzing prerecorded data from material or welds that contain cracks. In either case, training must be completed no earlier than 6 months prior to performing ultrasonic examinations at a licensee's facility.
(xv) [Reserved]
(xvi) Section XI condition: Appendix VIII single side ferritic vessel and piping and stainless steel piping examinations. When applying editions and addenda prior to the 2007 Edition of Section XI, the following conditions apply.
(A) Ferritic and stainless steel piping examinations: First provision. Examinations performed from one side of a ferritic vessel weld must be conducted with equipment, procedures, and personnel that have demonstrated proficiency with single side examinations. To demonstrate equivalency to two sided examinations, the demonstration must be performed to the requirements of Appendix VIII, as conditioned by this paragraph and paragraphs (b)(2)(xv)(B) through (G) of this section, on specimens containing flaws with non-optimum sound energy reflecting characteristics or flaws similar to those in the vessel being examined.
(B) Ferritic and stainless steel piping examinations: Second provision. Examinations performed from one side of a ferritic or stainless steel pipe weld must be conducted with equipment, procedures, and personnel that have demonstrated proficiency with single side examinations. To demonstrate equivalency to two sided examinations, the demonstration must be performed to the requirements of Appendix VIII, as conditioned by this paragraph and paragraph (b)(2)(xv)(A) of this section.
(xvii) [Reserved]
(xviii) Section XI condition: NDE personnel certification —(A) NDE personnel certification: First provision. Level I and II nondestructive examination personnel must be recertified on a 3-year interval in lieu of the 5-year interval specified in IWA-2314(a) and IWA-2314(b) of the 2001 Edition through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section.
(B) NDE personnel certification: Second provision. When applying editions and addenda prior to the 2007 Edition of Section XI, paragraph IWA-2316 may only be used to qualify personnel that observe leakage during system leakage and hydrostatic tests conducted in accordance with IWA 5211(a) and (b).
(C) NDE personnel certification: Third provision. When applying editions and addenda prior to the 2005 Addenda of Section XI, licensee's qualifying visual examination personnel for VT-3 visual examination under paragraph IWA-2317 of Section XI must demonstrate the proficiency of the training by administering an initial qualification examination and administering subsequent examinations on a 3-year interval.
(D) NDE personnel certification: Fourth provision. The use of Appendix VII, Table VII-4110-1 and Appendix VIII, Subarticle VIII-2200 of the 2011 Addenda through the latest edition incorporated by reference in paragraph (a)(1)(ii) of this section is prohibited. When using ASME BPV Code, Section XI editions and addenda later than the 2010 Edition, licensees and applicants must use the prerequisites for ultrasonic examination personnel certifications in Appendix VII, Table VII-4110-1 and Appendix VIII, Subarticle VIII-2200 in the 2010 Edition.
( 1 ) As an alternative to Note (c) in Table VII-4110-1 of ASME BPV Code, Section XI, 2010 Edition, the 250 hours of Level I experience time may be reduced to 175 hours, if the experience time includes a minimum of 125 hours of field experience and 50 hours of laboratory practice beyond the requirements of for training in accordance with Appendix VII Subarticle 4220, provided those practice hours are dedicated to the Level I or Level II skill areas as described in ANSI/ASNT CP-189.
( 2 ) As an alternative to Note (d) in Table VII-4110-1 of ASME BPV Code, Section XI, 2010 Edition, the 800 hours of Level II experience time may be reduced to 720 hours, if the experience time includes a minimum of 400 hours of field experience and a minimum of 320 hours of laboratory practice. The practice must be dedicated to scanning specimens containing flaws in materials representative of those in actual power plant components. Additionally, for Level II Certification, the candidate must pass a Mandatory Appendix VIII, Supplement 2 performance demonstration for detection and length sizing.
(xix) Section XI condition: Substitution of alternative methods. The provisions for substituting alternative examination methods, a combination of methods, or newly developed techniques in the 1997 Addenda of IWA-2240 must be applied when using the 2001 Edition through the 2004 Edition of Section XI of the ASME BPV Code. The provisions in IWA-4520(c), 2001 Edition through the 2004 Edition, allowing the substitution of alternative methods, a combination of methods, or newly developed techniques for the methods specified in the Construction Code, are not approved for use. The provisions in IWA-4520(b)(2) and IWA-4521 of the 2008 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section, allowing the substitution of ultrasonic examination for radiographic examination specified in the Construction Code, are not approved for use.
(xx) Section XI condition: System leakage tests —(A) System leakage tests: First provision. When performing system leakage tests in accordance with IWA-5213(a), 2001 Edition through 2002 Addenda, the licensee must maintain a 10-minute hold time after test pressure has been reached for Class 2 and Class 3 components that are not in use during normal operating conditions. No hold time is required for the remaining Class 2 and Class 3 components provided that the system has been in operation for at least 4 hours for insulated components or 10 minutes for uninsulated components.
(B) System leakage tests: Second provision. The nondestructive examination method and acceptance criteria of the 1992 Edition or later of Section III shall be met when performing system leakage tests (in lieu of a hydrostatic test) in accordance with IWA-4520 after repair and replacement activities performed by welding or brazing on a pressure retaining boundary using the 2003 Addenda through the latest edition and addenda of Section XI incorporated by reference in paragraph (a)(1)(ii) of this section. The nondestructive examination and pressure testing may be performed using procedures and personnel meeting the requirements of the licensee's/applicant's current ISI code of record.
(C) System leakage tests: Third provision. The use of the provisions for an alternative BWR pressure test at reduced pressure to satisfy IWA-4540 requirements as described in IWB-5210(c) of Section XI, 2017 Edition and IWA-5213(b)(2) and IWB-5221(d) of Section XI, 2017 Edition through the latest edition incorporated by reference in paragraph (a)(1)(ii) of this section may be used subject to the following conditions:
( 1 ) The use of nuclear heat to conduct the BWR Class 1 system leakage test is prohibited ( i.e., the reactor must be in a non-critical state), except during refueling outages in which the ASME Section XI Category B-P pressure test has already been performed, or at the end of mid-cycle maintenance outages fourteen (14) days or less in duration.
( 2 ) In lieu of the test condition holding time of IWA-5213(b)(2), after pressurization to test conditions, and before the visual examinations commence, the holding time shall be 1 hour for non-insulated components.
(xxi) Section XI condition: Table IWB-2500-1 examination requirements. (A) [Reserved]
(B) Table IWB-2500-1 examination. Use of the provisions of IWB-2500(f) and (g) and Table IWB-2500-1 Notes 6 and 7 of Section XI, 2017 Edition through the latest edition incorporated by reference in paragraph (a)(1)(ii) of this section, for examination of Examination Category B-D Item Numbers B3.90 and B3.100 shall be subject to the following conditions:
( 1 ) A plant-specific evaluation demonstrating the criteria of IWB-2500(f) are met must be ma…