Beta
10 CFR § 451.7
10 CFR § 451.7 — § 451.7 Metering requirements.
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.
Analyze this law with AI§ 451.7 Metering requirements.
The net electric energy generated and sold (kilowatt-hours) by the owner or operator of a qualified renewable energy facility must be measured by a standard metering device that—
(a) Meets generally accepted industry standards;
(b) Is maintained in proper working order according to the instructions of its manufacturer; and
(c) Is calibrated according to generally accepted industry standards.
