LEGALDIGMLEGALDIGM
    ← Code of Federal Regulations
    Beta
    10 CFR § 205.6

    10 CFR § 205.6 — § 205.6 Extension of time.

    Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.

    Analyze this law with AI
    § 205.6 Extension of time. When a document is required to be filed within a prescribed time, an extension of time to file may be granted by the office with which the document is required to be filed upon good cause shown.

    Related guides, FAQ and contract templates