Beta
za:gov:railway-construction-act-5-1965-03-mar-1965
za:gov:railway-construction-act-5-1965-03-mar-1965 — Railway Construction Act 5 of 1965
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.
Analyze this law with AI4 No. 1050 GOVERNMENT GAZETTE EXTRAORDINARY, 3 MARCH 1965
No. 5, 1965.]
Please note that most Acts are published in English and another South African official language. Currently we only have
capacity to publish the English versions. This means that this document will only contain even numbered pages as the other
language is printed on uneven numbered pages.
ACT
To provide for the construction and eqnipment of certain lines
of railway and for matters incidental thereto.
(Afrikaans text signed by the State President.)
(Assented to 19th February, 1965.)
BE IT ENACTED. by the State President, the Senate and the
House of Assembly of the Republic of South Africa, as
follows:- ·
Construction and 1. (1) The State President tnay,as soon after the commence-
equipment. ment of this Act as to him may seem expedient, cause to be con-
structed and equipped, upon a gauge of three feet six inches, the
lines of railway mentioned in column 1 of the First Schedule to
this Act, of the approximate length set out, as to each line, in
column 2 of that Schedule opposite the description of the line
in question, and at a gross cost not exceeding, in the case of
each line, the ·amount set out in column 3 of that Schedule
opposite the description of the line in question.
(2) The powers conferred by this section shall include the
power to construct and equip all sidings, stations, buildings and
other appurtenances necessary for or incide~tal to the proper
working of every such line of railway.
(3) The expression "construct and equip" shall include
"maintain" while the lines are in course of ·construction and
equipment.
Cost of construc-- 2. The cost of construction and equipment of the lines of
tion and railway authorized by section one shall be defrayed out of any
equipment;
loan raised by the State President under the authority of law
and appropriated for that purpose by Parliament, or out of any
other moneys so appropriated.
Powers inci- 3. In respect of the construction and equipment of the said
dental to con- lines of railway, the State President shall have the powers
struction and
equipment. conferred by the Railway Expropriation Act, 1955 (Act No. 37
of 1955), but subject to the obligations imposed by that Act:
Provided that the width of the land taken shall not exceed one
hundred Cape feet for the construction of each line, together
with such additional land as may be required for the slopes,
cuttings, drainage, stations, approach roads and other works and
matters which may be necessary for the purpose of the lines.
Ratification of 4~ The agreement concluded on the fourth day of January,
certain agreement 1965, between the Government of the Republic in its Railways
relating to line
of railway from and Harbours Administration (hereinafter called "the Adminis-
Kensington to a tration"), and Fisons (Proprietary) Limited, a copy of which
terminal at is set out in the Second Schedule to this Act, is hereby ratified
Montague and confirmed, and the Administration is hereby empowered to
Gardens. do all such things as may be necessary to give effect to the said
J\green1ent. ·
Short title. 5. This Act shall be called the Railway Construction Act,
1965.
6 No. 1050 GOVERNMENT GAZETTE EXTRAORDINARY, 3 MARCH 1965
First Schedule.
LINES OF RAILWAY AUTHORIZED BY SECTION ONE.
Column 1. Column 2. Column3.
Approxi~
Description of line. mate Estimated
length. cost.
Miles. R
1. From a junction at Chiselhurst with the line
between East London and Blaney to a ter-
minal point in the East London harbour area
(Province of the Cape of Good Hope) .. 3·6 1,053,306
2. From a junction at Kensington Cabin with
the avoiding line between Cape Town and
Woltemade to a terminal point at Montague
Gardens (Province of the Cape of Good
Hope) .. .. .... .. .. 4·86 800,073
\
Second Schedule.
MEMORANDUM OF AGREEMENT BETWEEN THE GOVERNMENT OF THE RE~
PUBLIC OF SoUTH AFRICA IN ITS RAILWAYS AND HARBOURS ADMINIS-
TRATION, OF TRE ONE PART, AND FISONS (PROPRIETARY) LIMITED,
OF THE OTHER PART.
MEMORANDUM OF AGREEMENT made and entered into
between the GoVERNMENT OF THE REPUBLIC OF SOUTH AFRICA in its
RAILWAYS AND HARBOURS ADMINISTRATION (hereinafter referred to as
"the Administration"), herein represented by the MINISTER oF TRANSPORT
of the Republic of South Africa, of the one part, and FISONS (PROPRIETARY)
LIMITED, being a company incorporated with limited liability under the
Companies Act, 1926 (hereinafter referred to as "the Company"), of the
other part.
WHEREAS the Company has petitioned the Administration to construct,
equip, maintain and work a line of railway of a gauge of three feet six
inches from Kensington to a terminal point in the Montague Gardens
area, in the Magisterial District of Cape Town, Province of the Cape of
Good Hope, a distance of approximately five miles (hereinafter termed
"the railway") for the purpose of conveying traffic to and from an area
in which the Company is carrying on, or is otherwise interested in,
certain manufacturing operations; .
AND WHEREAS the Administration bas agreed, if and when authorized by
Parliament to do so, to construct, equip, maintain and work the railway,
subject to the terms and conditions hereinafter set forth;
Now, THEREFORE, the parties do hereby agree as follows:
1. Pending the approval and sanction of Parliament, which the Ad~
ministration proposes to seek as soon as may be practicable after the
execution of this Agreement, the obligations of theAdministration under
this Agreement shall be taken to be provisional only. Should the construc-
tion of the railway not be authorized by Parliament within a period of
twelve months from the date hereof, this Agreement shall lapse, unless
renewed by mutual consent.
2. (l) After the commencement of an Act of Parliament authorizing the
construction and equipment of the railway and ratifying and confirming
this Agreement, and subject to an appropriation by Parliament of funds
for the purpose, the Administration shall proceed with all reasonable
expedition to construct and equip the railway: Provided that the Ad-
ministration shall not be liable for any delay in completing the construe-
. tion and equipment of the railway owing to any cause whatever over which
the Administration has no control.
(2) The Administration shall have the right, after consultation with the
Company, to construct or provide from time to time such additional
tracks or other facilities directly connected with the railway as it may deem
necessary in order to enable it efficiently to cope with any increase in
traffic over the railway. The cost of any additional tracks or other facilities
so constructed or provided shall be deemed to form part of the cost of
construction and equipment of the railway for the purposes of this
Agreement.
3. (l) Subject to the approval of Parliament, the Administration shall
provide the money necessary for the construction and equipment of the
railway, estimated to amount to approximately eight hundred thousand
and seventy-three rand (R800,073) excluding rolling stock.
(2) The route of the railway and the sites of stations and sidings shall
be approximately as shown on the plan annexed hereto and signed by
both parties: Provided that the Administration may, after consultation
with the Company, modify, for engineering exigencies only, the route of
the railway and the sites of stations and sidings, subject to any limitation
·imposed by the statutory authority under which the railway is constructed. ·
4. (1) The railway shall be constructed and equipped according to the·
standards adopted by the Administration for other Jines of similar type,
and ·shall be constructed with S.A.R. rails of a weight of not less than
ninety-six pounds per yard.
(2) For the purpose of this Agreement the cost of construction and
equipment of the railway shall comprise all items of expenditure, including
interest, chargeable to the railway in accordance with the Administration's
usual accounting practice, but excluding any amount/s repaid by the
8 No.l050 .GOVERNMENT GAZETIE EXTRAORDINARY, 3 MARCH 1965
Company to the Administration in terms of clause 9 hereof, and excluding
also the capital cost of locomotives, other rolling stock and any equipment
used in connection with rolling stock in the working of the railway after
completion.
5. (1) When the railway has been completed and has been certified by
the Administration's Chief Civil Engineer as being ready for the con-
veyance of public traffic, it shall forthwith be opened by .the Administra-
tion for the conveyance of public traffic.
(2) Subject to the provisions of clause 6, the fares, charges and rates for
the conveyance of passengers, parcels, livestock and goods of any des-
cription, and for the services incidental thereto, shall be those fixed by the
Administration from time to time and applicable generally over its
railway system..
(3) Nothing contained in this Agreement shall be deemed to diminish
or restrict in any way the Administration's statutory power to fix. and
alter rates and fares.
6. (1) Subject to the provisions hereinafter set forth, the Company
undertakes, for so long as a loss may be sustained in the working of the
railway on tbe basis of the fares, charges and rates generally applicable
over the Administration's railway system, to hold itself liable for, and to
pay to the Administration, in respect of all traffic consigned by it or on
its behalf by goods train over the railway or a portion thereof in the
·direction of Kensington, a special surcharge as hereinafter provided over
and above the normal tariff prescribed from time to time in the Official
Railway Tariff Book for the conveyance of any such commodity over the
Administration's railway system generally. The moneys accruing to the
Administration from such special surcharge shall be dealt with in the
manner hereinafter provided.
(2) For a period of six months from the date on which the railway is
opened for the conveyance of public traffic, the special surcharge men-
tioned in sub-clause (I) hereof shall be levied at the rate of nineteel) cents
(R0.19) per ton of 2,000 lbs. or at a proportionate rate per 100 lbs., as the
case may be. At the expiration of the said period of six months, and
every six months thereafter, for so long as may be necessary in accordance
with sub-clause (1) hereof, the Administration shall, in consultation with
the Company, review the rate of. the aforementioned special surcharge
in order to ensure that the amount accruing to the Administration by
way of the special surcharge during the financial year in question, shall
tally, as nearly as may be, with the amount by which the working costs
of the railway exceed the revenue derived therefrom, without taking into
account the amount accruing from the aforementioned special surcharge.
Depending on what may seem to be necessary in order to attain this
object, the rate of the aforementioned special surcharge shall, at the
time of such review, be either increased or decreased or left undisturbed
for the ensuing period of six months.
7. (l) From the date of opening of the railway for public traffic and for
each financial year thereafter for a period of thirty (30) years, the Ad·
ministration shall prepare and maintain accounts to indicate the results
of working the railway, and a copy of each annual statement shall be
supplied to the Company at its office in Johannesburg as soon as practi-
cable after the close of each financial year. The accounts shall be prepared
in accordance with the Administration's usual accounting practice and the
annual statement shall give particulars of expenditure and revenue
(with separate reference to the moneys accruing to the Administration
from the aforementioned special surcharge) and shall indicate the rates·
of depreciation and interest charges applied on the capital cost of con-
struction and equipment. It is specifically declared that, for the purpose
of calculating such working results, the amount derived from the afore-
mentioned special surcharge paid by the Company and the other senders
referred to in clause 12, shall be regarded as part of the revenue earned
by the railway.
(2) (a) At the end of each period of five years, calculated from the date
on which the railway is officially opened for public traffic, it
shall be determined from the annual .statements referred to
in sub-clause (I) hereof, due iegard being had to the provisions
of paragraphs {b) to (/) of this sub-clause, whether the results
of working the railway during the period offive years in question,
show a loss or a surplus, and settlement between the parties
shall then be effected as hereinafter set forth in this sub-clause.
(b) If the working results of the railway for any fuiancial year
included in such period of five years show a surplus, such
surplus shall be retained by the Administration but shall be set
off against any loss which has been or may be incurred in the
working of the railway during any other financial year included
in the same period of five years.
(c) If the working results of the railway show a surplus over any
period of five years as set forth in paragraph (a) of this sub-
clause, the Company and/or the senders referred to in clause
12, shall have no claim thereto but such surplus shall, depending
on the circumstances, either be retained by the Administration
or dealt with as prescribed in paragraph (d) of this sub-clause~
(d) If the special surcharge was levied during any portion of such
a period of five years it shall be determined whether a loss would
have been incurred in the working of the railway during such
"i period of five years had the special surcharge not been levied.
Should it be found that no loss would have been incurred, the
whole of the proceeds of the special surcharge during the said
period of five years shall be used to defray any loss and/or
interest on losses that may be incurred in the working of the
railway during a succeeding period of five years. Should it be
found that a loss would have been incurred, then so much of
the said proceeds as exceeds that loss, shall be applied to the
purpose aforementioned: Provided that any surplus that may
10 No. 1050 GOVERNMENT GAZETTE EXTRAORDINARY, 3 MARCH 1965
have accrued at the end of the sixth period of five years shall be
retained by the Administration.
(e) At the end of each month in each financial year, interest shall be
calculated at the rate of five per cent. (5 %) per annum on the
amount by which the aggregate amount of the accumulated loss
and the accrued interest up to the end of the preceding month,
exceeds the aggregate amount of the profits, if any, up to the
end of that month, and the amount of such interest shall be
reflected on a separate statement, a copy of which shall be
furnished to the Company as soon as practicable after the close
of each financial year.
(/) If the results of working the railway during any period of five
years show a Joss, the amount of such loss, together with the .
interest accrued during such period of five years, as reflected in
the statements mentioned in paragraph (e), shall be paid by the
Company to the Administration within thirty (30) days after the
date on which a statement, certified by the Administration's
Chief Accountant, indicating the amount for which the Company
is liable, shall have been furnished to the Company at its office
in Johannesburg. After settlement has been effected between the
parties at the end of the sixth period of five years, the Company
shall be under no obligation to reimburse the Administration
for losses that may thereafter be incurred in the working of the
railway.
8. The depreciation charges referred to in sub-clause (I} of clause 7
shall be assessed at the normal rates applicable to the Administration's
assets, and the interest charges referred to in sub-clause (2) of clause 4 and
sub-clause (1) of clause 7 shall be assessed at the average rate determined
by the Administration in accordance with its usual procedure and shall
not be· specifically loaded against the railway.
9. (1) The Company hereby agrees to repay to the Administration
on demand, or within such period as the Administration may in its dis-
cretion determine after consultation with the Company, but subject to
the final proviso to sub-clause (3) hereof, the total amount of-
(a) any compensation which the Administration may have paid
to any third party or parties whose rights to mine~· 1 of whatever
nature have been injuriously affected as a result of the construc-
tion of the railway, in that, by reason of the operation of the
Mining Laws, the mining of such minerals under or in the vicinity
of the railway is prohibited or restricted; and
(b) any legal costs incurred by the Administration in settling or
contesting any claim for compensation preferred against it by
any such third party:
Provided that nothing in this sub-clause contained shall be deemed to
impose on the Company any obligation with respect to any minerals, or
the injurious affection of any rights to minerals, underlying any land
traversed by the railway of which the Administration is the owner at the
date of this Agreement.
(2) In the absence of such an agreement as is contemplated in sub-clause
(3) hereof, the Administration shall forthwith take all reasonable and
proper steps to settle, on the most advantageous terms, any claims for
compensation preferred against it by third parties as aforesaid, and shall
consult the Company before arriving at a final settlement with any such
claimant. If any such claim cannot be settled out of court on terms which,
in the opinion of the Company are fair and reasonable, the Administration
shall, at the risk and expense of the Company, contest any .legal pro-
ceedings which the claimant may bring against it for the determination
of the amount of the compensation payable. The Administration under-
takes that, in regard to the manner in which and the extent to which any
such proceedings are to be contested it will, wherever practicable, act in
accordance with and give effect to such directions as may be given to it by
the Company from time to time during the course of the litigation,
including directions to pay any amount into court, or to settle the claim
at an agreed figure, or to appeal or not to appeal against any judgment or
order of the court of first instance.
(3) With the consent of the Company, the Administration may enter
into an agreement with any such claimant whereby the payment of
compensation to the claimant in respect of the injurious affection of his
rights to minerals is postponed to some future date so as to permit of the
amount of the compensation to which the claimant is entitled, being
determined more readily and accurately. When the said date arrives,
the Administration shall, with due regard to the terms of such agreement
and in consultation with the Company, proceed to negotiate for the
settlement of any such claim ·on the most advantageous terms, subject
however to the second and third sentences of sub-clause (2) of this
clause, which shall be deemed also to form part of this sub-clause, and
provided further that the Company shall not be liable to repay to the
Administration any amount which the Administration may pay to any
such claimant whose claim for compensation is presented to the Adminis-
tration for payment pursuant to any such agreement as aforesaid, after the
lapse of a period of fifty years from the date of the opening of the rail-
way for public traffic.
(4) It is hereby agreed that if, as a result of the construction of the
railway, any rights to minerals of whatever nature vested in the Company
(whether such rights were acquired before or after the date of this Agree-
ment) are injuriously affected in that, by reason of the operation of the
Mining Laws, the mining of such minerals under or in the vicinity of the
railway is prohibited or restricted, the Company shall and hereby does
unconditionally release the Administration from any and all liability
to compensate it, its successors or assigns, in respect of the injurious
affection, as aforesaid, of such rights to minerals.
10. The Company agrees that, if at a future date after thirty years but
within fifty years of the date of opening the railway for public traffic, the
traffic falls off to such an extent that the total volume of traffic carried
12 No. 1050 GOVERNMENT GAZETTE EXTRAORDINARY, .3 MARCH 1965
over the railway is, in the opinion of the Adminisfration after consultation
with the Company, insufficient to justify the operation of the railway,
the Administration shall, unless the Company is prepared to enter into a
fresh agreement with the Administration guaranteeing to meet any
future losses incurred in working the railway, have the right to uplift the
whole or any portion of the railway and, if so uplifted, to recover from
the Company an amount equal to the total of the original cost of con-
struction ·plus any amount subsequently expended on the railway (in-
cluding expenditure financed from the Administration's Renewals Fund
or Betterment Fund) which, in terms of sub-clause (2) of clause 2 hereof,
is deemed to form part of the cost of construction and equipment of the
railway, less the total of
(a) the depreciation charges raised in respect of the cost of construc-
tion and equipment of the railway (including any amount
deemed in terms of clause 2 (2), to form part of such cost),
from the date of the opening of the railway to such aforemen-
tioned future date; and •
(b) the total residual value, determined in accordance with the
Administration's usual accounting practice, of such assets or
items of material or equipment (included or deemed to be
included in the cost of construction and equipment of the railway
for the purposes of this Agreement), as the Administration may
decide to retain.· Any of the aforementioned assets, material
and equipment not so retained by the Administration shall
become the property of the Company, subject to any conditions
of title under which the assets are held by the Administration.
11. If the whole or any portion of the railway is uplifted by the Adminis-
tration in terms of clause 10, the cost incurred shall be borne by the
Company.
12. The Administration undertakes that during such time as the
Company remains bound to pay the special surcharge provided for in
sub-clause (l) of clause 6, it will make provision in the Official Railway
Tariff Book for the payment of a like surcharge at the same rate per ton
or at a proportionate rate per 100 lbs., as the case may be, on all traffic
consigned by or on behalf of any other senders by goods train over the
railway·or any portion thereof in the direction of Kensington, and that all
moneys derived from such surcharge will be dealt with as provided in
clause 7 of this Agreement.
13. There shall be no restriction on the running powers of the Adminis-
tration in respect of any class of traffic whatever over the railway, and the
Administration may construct any line or lines of railway, and consent to
the construction of private sidings, in continuation of or as a branch from
the railway: Provided that before constructing any such line/s of railway
or consenting to the construction of any such private siding, the Ad-
ministration shall consult the Company and shall take into consideration
any representations that the Company may make with respect thereto.
SIGNED for and on behalf of the Government of the Republic of
South Africa in its Railways and Harbours Administration at Pretoria
on this the 4th day of January, 1965.
As WITNESSES
1. (Sgd.) L. M. Engelbrecht
2. (Sgd.) J. H. Viljoen
(Sgd.) B. J. Schoeman
Minister of Transport.
SIGNED for and on behalf ofFrsoNs (PROPRIETARY) LIMITED, at Johannes·
burg on this the 23rd day of December, 1964, under the authority of a
resolution of the Board of Directors of the Company dated the 4th day of
November, 1964.
As WITNESSES
1. (Sgd.) J. S. Pilkington
2. (Sgd.) L. A. O'Connor
(Sgd.) R. W. Mills
Director.
