Beta
in:central:187308
in:central:187308 — The Northern India Canal and Drainage Act, 1873
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.
Analyze this law with AITHE NORTHERN INDIA CANAL AND DRAINAGE ACT, 1873
__________
ARRANGEMENT OF SECTIONS
__________
PREAMBLE
PART I
PRELIMINARY
SECTIONS
1. Short title.
Local extent.
2. [Repealed.]
3. Interpretation clause.
4. Power to appoint officers.
PART II
OF THE APPLICATION OF WATER FOR PUBLIC PURPOSES
5. Notification to issue when water-supply is to be applied for public purposes.
6. Powers of Canal-officer.
7. Notice as to claims for compensation.
8. Damage for which compensation shall not be awarded.
Matters in respect of which compensation may be awarded.
9. Limitation of claims.
10. Enquiry into claims and amount of compensation.
11. Abatement of rent on interruption of water-supply.
12. Enhancement of rent on restoration of water-supply.
13. Compensation when due.
Interest.
PART III
OF THE CONSTRUCTION AND MAINTENANCE OF WORKS
14. Power to enter and survey, etc.
Power to clear land.
Power to inspect and regulate water-supply.
Notice of intended entry into houses.
Compensation for damage caused by entry.
15. Power to enter for repairs and to prevent accidents.
Compensation for damage to land.
16. Application by persons desiring to use canal-water.
Contents of application.
Liability of applicants for cost of works.
Recovery of amount due.
17. Government to provide means of crossing canals.
*Subject to verification and confirmation by Ministry.
SECTIONS
18. Persons using water-course to construct works for passing water across roads, etc.
If they fail, Canal-officer may construct, and recover cost.
19. Adjustment of claims between persons jointly using water-course.
Recovery of amount found due.
20. Supply of water through intervening water-course.
21. Application for construction of new water-course.
22. Procedure of Canal-officer thereupon.
23. Application for transfer of existing water-course.
Procedure thereupon.
24. Objections to construction or transfer applied for.
25. When applicant may be placed in occupation.
26. Procedure when objection is held valid.
27. Procedure when Canal-officer disagrees with Collector.
28. Expenses to be paid by applicant before receiving occupation.
Procedure in fixing compensation.
Recovery of compensation and expenses.
29. Conditions binding on applicant placed in occupation.
30. Procedure applicable to occupation for extensions and alterations.
PART IV
OF THE SUPPLY OF WATER
31. In absence of written contract, water-supply to be subject to rules.
32. Conditions as to—
power to stop water-supply;
claims to compensation in case of failure or stoppage of supply;
claims on account of interruption from other causes;
duration of supply;
sale or sub-letting of right to use canal-water;
transfer, with land, of contracts for water;
no right acquired by user.
PART V
OF WATER-RATES
33. Liability when person using unauthorizedly cannot be identified.
34. Liability when water runs to waste.
35. Charges recoverable in addition to penalties.
Decision of questions under sections 33 and 34.
36. Charge on occupier for water, how determined.
“Occupier’s rate.”
37. “Owner’s rate.”
38. Amount of owner’s rate.
39. Owner’s rate, when not chargeable.
40. When occupier is to pay both owner’s rate and occupier’s rate.
SECTIONS
41. Power to make rules for apportioning owner’s rate.
42. When owner is to pay ‘owner’s rate.
43. Effect of introduction of canal-irrigation on landlord’s right to enhance.
44. Water-rate by whom payable, when charged on land held by several owners.
Recovery of charges
45. Certified dues recoverable as land-revenue.
46. Power to contract for collection of canal-dues.
47. Lambardars may be required to collect canal-dues.
48. Fines excluded from sections 45, 46 and 47.
PART VI
OF CANAL NAVIGATION
49. Detainer of vessels violating rules.
Liability of owners of vessels causing damage.
50. Recovery of fines for offences in navigating canals.
51. Power to seize and detain vessel on failure to pay charges.
52. Power to seize cargo or goods, if charges due thereon are not paid.
53. Procedure for recovery of such charges after seizure.
54. Procedure in respect of vessels abandoned and goods unclaimed.
Disposal of proceeds of sale.
PART VII
OF DRAINAGE
55. Power to prohibit obstructions or order their removal.
56. Power to remove obstructions after prohibition.
57. Preparation of schemes for works of improvement.
58. Powers of persons employed on such schemes.
59. Rate on lands benefited by works.
60. Recovery of rate.
61. Disposal of claims to compensation.
62. Limitation of such claims.
PART VIII
OF OBTAINING LABOUR FOR CANALS AND DRAINAGE-WORKS
63. Definition of “labourer”.
64. Power to prescribe number of labourers to be supplied by persons benefited by canal.
65. Procedure for obtaining labour for works urgently required.
66. Liability of labourers under requisition.
PART IX
OF JURISDICTION
SECTIONS
67. Jurisdiction under this Act of Civil Courts.
68. Settlement of differences as to mutual rights and liabilities of persons interested in water-course.
69. Power to summon and examine witnesses.
PART X
OF OFFENCES AND PENALTIES
70. Offences under Act.
Penalty.
71. Saving of prosecution under other laws.
72. Compensation to person injured.
73. Power to arrest without warrant.
74. Definition of “canal”.
PART XI
OF SUBSIDIARY RULES
75. Power to make, alter and cancel rules.
Publication of rules.
SCHEDULE.—[Repealed.]
THE NORTHERN INDIA CANAL AND DRAINAGE ACT, 1873
ACT NO. 8 OF 1873
[11th February, 1873.]
An Act to regulate irrigation, navigation and drainage in Northern India.
Preamble.—WHEREAS, throughout the territories to which this Act extends, the State
Government is entitled to use and control for public purposes the water of all rivers and streams
flowing in natural channels, and of all lakes and other natural collections of still water; and whereas
it is expedient to amend the law relating to irrigation, navigation and drainage in the said territo ries;
It is hereby enacted as follows:—
PART I
PRELIMINARY
1. Short title.—This Act may be called the Northern India Canal and Drainage Act, 1873.
Local extent.—It extends to 1[Uttar Pradesh and the 2[territories which, immediately before
the 1st November, 1956, were comprised in the States of Punjab and Delhi]] and applies to all
lands whether permanently settled, temporarily settled, or free from revenue.
3* * * * *
2. [Repeal of Acts.] Rep. by the Repealing Act, 1873 (12 of 1873), s. 1 and Schedule.
3. Interpretation-clause.—In this Act, unless there be something repugnant in the subject or
context:—
(1) “Canal”.—“canal” includes—
(a) all canals, channels and reservoirs constructed, maintained or controlled by the State
Government for the supply or storage of water;
(b) all works, embankments, structures, supply and escape channels connected with such
canals, channels or reservoirs;
(c) all water-courses as defined in the second clause of this section;
(d) any part of a river, stream, lake or natural collection of water , or natural
drainage-channel, to which the State Government has applied the provisions of
Part II of this Act;
(2) “Water-course”.—“water-course” means any channel which is supplied with water
from a canal, but which is not maintained at the cost of the State Government, and all
subsidiary works belonging to any such channel;
(3) “Drainage-work”.—“drainage-work” includes escape-channels from a canal, dams,
weirs, embankments, sluices, groins and other works for the protection of lands from flood or
from erosion, formed or maintained by the State Government under the provisions of Part VII
of this Act, but does not include works for the removal of sewage from towns;
4(4) “Vessel”.—“vessel” includes boats, rafts, timber and other floating bodies;
1. Subs. by the A.O.1948, for the original words as amended by the A.O.1937. The Act originally extended to the
territories which are now the U.P., the Punjab, and the C.P. It has been rep. in the C.P. by the C.P. Irrigation Act,
1931 (C.P. Act 3 of 1931). It has been declared not to apply to any canal which is included for the time being under
Sch. I or Sch. II to the Punjab Minor Canals Act, 1905 (Pun. Act 3 of 1905), see s. 2 (3) of that Act. The Act has
been amended and in Punjab by Pun. Acts 19 of 1953, 22 of 1960 and 18 of 1974’ ’ in U.P. by U.P. Acts 30 of 1956
and 16 of 1974; and in Haryana by Haryana Acts 4 of 1971 and 29 of 1974.
2. Subs. by the Adaptation of Laws (No. 2) Order, 1956, for “States of Punjab and Delhi”.
3. The commencement paragraph rep. by Act 16 of 1874, s. 1 and Schedule.
4. Cf. definition in the General Clauses Act, 1897 (10 of 1897), s. 3.
(5) “Commissioner”.—“Commissioner” means a Commissioner of a division, and includes any
officer appointed under this Act to exercise all or any of the powers of a Commissioner;
1(6) “Collector”.—“Collector” means the head revenue-officer of a district, and includes a
Deputy Commissioner or other officer appointed under this Act to exercise all or any of the powers of
a Collector;
(7) “Canal-officer”.—“Canal-officer” means an officer appointed under this Act to exercise
control or jurisdiction over a canal or any part thereof;
“Superintending Canal-officer”.—“Superintending Canal-officer” means an officer exercising
general control over a canal or portion of a canal;
“Divisional Canal-officer”.—“Divisional Canal-officer” means an officer exercising control
over a division of a canal;
“Sub-divisional Canal-officer”.—“Sub-divisional Canal-officer” means an officer exercising
control over a sub-division of a canal;
(8) “District”.—“District” means a district as fixed for revenue purposes.
STATE AMENDMENT
Uttar Pradesh
Amendment of section 3 of Act No. VIII of 1873.— In clause (8) of section 3 of the Northern India
Canal and Drainage Act, 1873 (hereinafter called the principal Act) for the full stop a semi-colon shall be
substituted and thereafter the following shall be added as new clauses (9) and (10) ;
“(9) ‘irrigable command area’ means such area of culturable land or grove land which, for purposes
of irrigation, can be commanded through a single outlet in a canal or by a single tube-well and the limits
of which are fixed in this behalf by the Divisional Canal Officer ; and
(10) ‘Prescribed’ means prescribed by rules made under this Act.
[Vide Uttar Pradesh Act V of 1963, s. 2]
4. Power to appoint officers.—The State Government may from time to time declare, by notification
in the Official Gazette, the officers by whom, and the local limits within which, or any of the powers or
duties hereinafter conferred or imposed shall be exercised or performed.
All officers mentioned in section 3, clause (7), shall be respectively subject to the orders of such
officers as the State Government from time to time directs.
STATE AMENDMENT
Uttar Pradesh
Amendment of section 4 of Act No. XVII of 1878.—In the first proviso to section 4 of the Northern
India Ferries Act, 1878, as amend in its application to Uttar Pradesh, between the words “two States” and
the words “the powers”, the words “to which this Act applies” shall be inserted.
[Vide Uttar Pradesh Act IV of 1960, s. 2]
PART II
OF THE APPLICATION OF WATER FOR PUBLIC PURPOSES
5. Notification to issue when water-supply is to be applied for public purposes.—Whenever it
appears expedient to the State Government that the water of any river or stream flowing in a natural
channel, or of any lake or other natural collection of still water, should be applied or used by the State
Government for the purpose of any existing or projected canal or drainage-work, the State Government
1. Cf. definition in the General Clauses Act, 1897 (10 of 1897), s. 3 (11).
may, by notification in the Official Gazette, declare that the said water will be so applied or used after a
day to be named in the said notification, not being earlier than three months from the date thereof.
6. Powers of Canal-officer.—At any time after the day so named, any Canal-officer, acting under the
orders of the State Government in this behalf, may enter on any land and remove any obstructions, and
may close any channels, and do any other thing necessary for such application or use of the said water.
7. Notice as to claims for compensation.—As soon as is practicable after the issue of such
notification, the Collector shall cause public notice to be given at convenient places, stating that the State
Government intends to apply or use the said water as aforesaid, and that claims for compensation in
respect of the matters mentioned in section 8 may be made before him.
8. Damage for which compensation shall not be awarded.—No compensation shall be awarded for
any damage caused by—
(a) stoppage or diminution of percolation or floods;
(b) deterioration of climate or soil;
(c) stoppage of navigation, or of the means of drifting timber or watering cattle;
(d) displacement of labour.
Matters in respect of which compensation may be awarded.—But compensation may be awarded
in respect of any of the following matters:—
(e) stoppage or diminution of supply of water through any natural channel to any defined
artificial channel, whether above or underground, in use at the date of the said notification;
(f) stoppage or diminution of supply of water to any work erected for purposes of profit on any
channel, whether natural or artificial, in use at the date of the said notification;
(g) stoppage or diminution of supply of water through any natural channel which has been
used for purposes of irrigation within the five years next before the date of the said notification;
(h) damage done in respect of any right to a water-course or the use of any water to which any
person is entitled under the 1Indian Limitation Act, 1877 (15 of 1877), Part IV;
(i) any other substantial damage, not falling under any of the above clauses (a), (b), (c) or
(d), and caused by the exercise of the powers conferred by this Act, which is capable of being
ascertained and estimated at the time of awarding such compensation.
In determining the amount of such compensation, regard shall be had to the diminut ion
in the market-value, at the time of awarding compensation of the property in respect of
which compensation is claimed; and, where such market -value is not ascertainable, the
amount shall be reckoned at twelve times the amount of the diminution of the a nnual nett
profits of such property caused by the exercise of the powers conferred by this Act.
No right to any such supply of water as is referred to in clauses (e), (f) or (g) of this
section, in respect of a work or channel not in use at the date of the notification, shall be
acquired as against the State Government, except by grant or under the 1Indian Limitation
Act, 1877 (15 of 1877), Part IV;
and no right to any of the advantages referred to in clauses (a), (b) and (c) of this section shall be
acquired, as against the State Government, under the same Part.
9. Limitation of claims.—No claim for compensation for any such stoppage, diminution
or damage shall be made after the expiration of one year from such stoppage, diminution or
damage, unless the Collector is satisfied that the claimant had sufficient cause for not making
the claim within such period.
1. See now the Indian Limitation Act, 1963 (36 of 1963).
10. Enquiry into claims and amount of compensation.—The Collector shall proceed to
enquire into any such claim, and to determine the amount of compensation, if any, which should
be given to the claimant; and sections 9 to 12 (inclusive), 14 and 15, 18 to 23 (inclusive), 26 to
40 (inclusive), 51, 57, 58 and 59 of the 1Land Acquisition Act, 1870 (10 of 1870), shall apply to
such enquiries:
Provided that, instead of the last clause of the said section 26, the following shall be
read:—“The provisions of this section and of section 8 of the Northern India Canal and
Drainage Act, 1873 (8 of 1873) , shall be read to every assessor in a language which he
understands, before he gives his opinion as to the amount of compensation to be
awarded.”
11. Abatement of rent on interruption of water-supply.—Every tenant holding under
an unexpired lease, or having a right of occupancy, who is in occupation of any land at the
time when any stoppage or diminution of water -supply, in respect of which compensation
is allowed under section 8, takes place, may claim an abatement of the rent prev iously
payable by him for the said land, on the ground that the interruption reduces the value of
the holding.
STATE AMENDMENT
Uttar Pradesh
Amendment of section 11 of Act XVII of 1878.— In section 11 of the Northern India Ferries Act,
1878, for the words “one month’s thin” the word “three months” shall be substituted.
[Vide Uttar Pradesh Act XXIX of 1948, s. 2]
12. Enhancement of rent on restoration of water-supply.—If a water-supply increasing the value
of such holding is afterwards restored to the said land, the rent of the tenant may be enhanced in respect
of the increased value of such land due to the restored water-supply, to an amount not exceeding that at
which it stood immediately before the abatement.
Such enhancement shall be on account only of the restored water -supply, and shall not
affect the liability of the tenant to enhancement of rent on any other grounds.
13. Compensation when due.—All sums of money payable for compensation under this
Part shall become due three months after the claim for such compensation is made in
respect of the stoppage, diminution or damage complained of,
Interest.—and simple interest at the rate of six per cent. per annum shall be allowed on any
such sum remaining unpaid after the said three months, except where the non -payment of such
sum is caused by the wilful neglect or refusal of the claimant to receive the same.
PART III
OF THE CONSTRUCTION AND MAINTENANCE OF WORKS
14. Power to enter and survey, etc.—Any Canal-officer, or other person acting under the general or
special order of a Canal-officer,
may enter upon any lands adjacent to any canal, or through which any canal is
proposed to be made, and undertake surveys or levels thereon;
and dig and bore into the sub-soil;
and make and set up -suitable land-marks, level-marks and water-gauges;
and do all other acts necessary for the proper prosecution of any enquiry relating to any
existing or projected canal under the charge of the said Canal -officer;
1. See now the Land Acquisition Act, 1894 (1 of 1894).
Power to clear land.—and, where otherwise such enquiry cannot be completed, such
officer or other person may cut down and clear away any part of any standing crop, fence
or jungle;
Power to inspect and regulate water-supply.—And may also enter upon any land,
building or water-course on account of which any water -rate is chargeable, for the purpose
of inspecting or regulating the use of the water supplied, or of measuring the lands
irrigated thereby or chargeable with a water -rate, and of doing all things necessary for the
proper regulation and management of such canal:
Notice of intended entry into houses.—Provided that, if such Canal -officer or
person proposes to enter into any building or enclosed court or garden attached to a
dwelling-house not supplied with water flowing from any canal, he shall previously give
the occupier of such building, court or garden at least seven days ’ notice in writing of
his intention to do so.
Compensation for damage caused by entry.—In every case of entry under this section, the Canal-
officer shall, at the time of such entry, tender compensation for any damage which may be occasioned by
any proceeding under this section; and, in case of dispute as to the sufficiency of the amount so tendered,
he shall forthwith refer the same for decision by the Collector, and such decision shall be final.
15. Power to enter for repairs and to prevent accidents.—In case of any accident happening or
being apprehended to a canal any Divisional Canal-officer or any person acting under his general or
special orders in this behalf may enter upon any lands adjacent to such canal, and may execute all works
which may be necessary for the purpose of repairing or preventing such accident.
Compensation for damage to land.—In every such case such Canal-officer or person
shall tender compensation to the proprietors or occupiers of the said lands for all damage
done to the same. If such tender is not accepted, the Canal -officer shall refer the matter to
the Collector, who shall proceed to award compensation for the damage as though the State
Government had directed the occupation of the lands under section 43 of the 1Land Acquisi-
tion Act, 1870 (10 of 1870).
16. Application by persons desiring to use canal-water.—Any persons desiring to use the water of
any canal may apply in writing to the Divisional or Sub-Divisional Canal-officer of the division or
sub-division of the canal from which the water-course is to be supplied, requesting such officer to
construct or improve a water-course at the cost of the applicants.
Contents of application.—The application shall state the works to be undertaken, their approximate
estimated cost, or the amount which the applicants are willing to pay for the same, or whether they
engage to pay the actual cost as settled by the Divisional Canal-officer, and how the payment is to be
made.
Liability of applicants for cost of works.—When the assent of the Superintending Canal-officer is
given to such application, all the applicants shall, after the application has been duly attested before the
Collector, be jointly and severally liable for the cost of such works to the extent mentioned therein.
Recovery of amount due.—Any amount becoming due under the terms of such application, and not
paid to the Divisional Canal-officer, or the person authorised by him to receive the same, on or before the
date on which it becomes due, shall, on the demand of such officer, be recoverable by the Collector as if it
were an arrear of land-revenue.
17. Government to provide means of crossing canals.—There shall be provided, at the cost of the
State Government, suitable means of crossing canals constructed or maintained at the cost of the State
Government, at such places as the State Government thinks necessary for the reasonable convenience of
the inhabitants of the adjacent lands.
1. See now the Land Acquisition Act, 1894 (1 of 1894).
On receiving a statement in writing, signed by not less than five of the owners of such lands, to the
effect that suitable crossings have not been provided on any canal, the Collector shall cause enquiry to be
made into the circumstances of the case, and if he thinks that the statement is established, he shall report
his opinion thereon for the consideration of the State Government, and the State Government shall cause
such measures in reference thereto to be taken as it thinks proper.
18. Persons using water-course to construct works for passing water across roads, etc.—The
Divisional Canal-officer may issue an order to the persons using any water-course to construct suitable
bridges, culverts or other works for the passage of the water of such water-course across any public road,
canal or drainage-channel in use before the said water-course was made, or to repair any such works.
Such order shall specify a reasonable period within which such construction or repairs shall be
completed;
If they fail, Canal-officer may construct.—and if, after the receipt of such order, the persons to
whom it is addressed do not, within the said period, construct or repair such works to the satisfaction of
the said Canal-officer, he may, with the previous approval of the Superintending Canal-officer, himself
construct or repair the same;
and recover cost.—and if the said persons do not, when so required, pay the cost of such
construction or repairs as declared by the Divisional Canal-officer, the amount shall, on the demand of the
Divisional Canal-officer, be recoverable from them by the Collector as if it were an arrear of
land-revenue.
19. Adjustment of claims between persons jointly using water-course.—If any person, jointly
responsible with others for the construction or maintenance of a water-course, or jointly making use of a
water-course with others, neglects or refuses to pay his share of the cost of such construction or
maintenance, or to execute his share of any work necessary for such construction or maintenance, the
Divisional or Sub-divisional Canal-officer, on receiving an application in writing from any person injured
by such neglect or refusal, shall serve notice on all the parties concerned that, on the expiration of a
fortnight from the service, he will investigate the case; and shall, on the expiration of that period,
investigate the case accordingly, and make such order thereon as to him seems fit.
Such order shall be appealable to the Commissioner, whose order thereon shall be final.
Recovery of amount found due.—Any sum directed by such order to be paid within a
specified period may, if not paid within such period, and if the order remains in force, be
recovered by the Collector, from the person directed to pay the same, as if it were an
arrear of land-revenue.
20. Supply of water through intervening water-course.—Whenever application is
made to a Divisional Canal-officer for a supply of water from a canal, and it appears to him
expedient that such supply should be given and that it should be conveyed through some
existing water-course, he shall give notice to the persons responsible for the maintenance
of such water-course to show cause, on a day not less than fourteen days from the date of
such notice, why the said supply should not be so conveyed; and, after making enquiry on
such day, the Divisional Canal-officer shall determine whether and on what conditions the
said supply shall be conveyed through such water-course.
When such officer determines that a supply of canal-water may be conveyed through
any water-course as aforesaid, his decision shall, when confirmed or modified by the
Superintending Canal-officer, be binding on the applicant and also on the persons
responsible for the maintenance of the said water -course.
Such applicant shall not be entitled to use such water -course until he has paid the
expense of any alteration of such water -course necessary in order to his being supplied
through it, and also such share of the first cost of such water -course as the Divisional or
Superintending Canal-officer may determine.
Such applicant shall also be liable for his share of the cost of maintenance of such
water-course so long as he uses it.
21. Application for construction of new water-course.—Any person desiring the construction of a
new water-course may apply in writing to the Divisional Canal-officer, stating—
(1) that he has endeavoured unsuccessfully to acquire, from the owners of the land
through which he desires such water -course to pass, a right to occupy so much of the
land as will be needed for such water-course;
(2) that he desires the said Canal-officer, in his behalf and at his cost, to do all things necessary
for acquiring such right;
(3) that he is able to defray all costs involved in acquiring such right and constructing such
water-course.
22. Procedure of Canal-officer thereupon.—If the Divisional Canal-officer considers—
(1) that the construction of such water-course is expedient, and
(2) that the statements in the application are true,
he shall call upon the applicant to make such deposit as the Divisional Canal-officer considers necessary
to defray the cost of the preliminary proceedings, and the amount of any compensation which he
considers likely to become due under section 28;
and, upon such deposit being made, he shall cause enquiry to be made into the most suitable
alignment for the said water-course, and shall mark out the land which, in his opinion, it will be necessary
to occupy for the construction thereof, and shall forthwith publish a notice in every village through which
the water-course is proposed to be taken, that so much of such land as belongs to such village has been so
marked out, and shall send a copy of such notice to the Collector of every district in which any part of
such land is situate.
23. Application for transfer of existing water-course.—Any person desiring that an existing
water-course should be transferred from its present owner to himself may apply in writing to the
Divisional Canal-officer, stating—
(1) that he has endeavoured unsuccessfully to procure such transfer from the owner of such
water-course;
(2) that he desires the said Canal-officer, in his behalf and at his cost, to do all things necessary
for procuring such transfer;
(3) that he is able to defray the cost of such transfer.
Procedure thereupon.—If the Divisional Canal-officer considers—
(a) that the said transfer is necessary for the better Management of the irrigation from such
water-course, and
(b) that the statements in the application are true,
he shall call upon the applicant to make such deposit as the Divisional Canal-officer considers necessary
to defray the cost of the preliminary proceedings, and the amount of any compensation that may become
due under the provisions of section 28 in respect of such transfer;
and upon such deposit being made, he shall publish a notice of the application in every village, and
shall send a copy of the notice to the Collector of every district, through which such water-course passes.
24. Objections to construction or transfer applied for.—Within thirty days from the publication of
a notice under section 22 or section 23, as the case may be, any person interested in the land or
water-course to which the notice refers may apply to the Collector by petition, stating his objection to the
construction or transfer for which application has been made.
The Collector may either reject the petition or may proceed to inquire into the validity of the
objection, giving previous notice to the Divisional Canal-officer of the place and time at which such
inquiry will be held.
The Collector shall record in writing all orders passed by him under this section and the grounds
thereof.
25. When applicant may be placed in occupation.—If no such objection is made, or (where such
objection is made) if the Collector over-rules it, he shall give notice to the Divisional Canal-officer to that
effect, and shall proceed forthwith to place the said applicant in occupation of the land marked out or of
the water-course to be transferred, as the case may be.
26. Procedure when objection is held valid.—If the Collector considers any objection made as
aforesaid to be valid he shall inform the Divisional Canal-officer accordingly; and, if such officer sees fit,
he may, in the case of an application under section 21, alter the boundaries of the land so marked out, and
may give fresh notice under section 22; and the procedure hereinbefore provided shall be applicable to
such notice, and the Collector shall thereupon proceed as before provided.
27. Procedure when Canal-officer disagrees with Collector.—If the Canal-officer disagrees with
the Collector, the matter shall be referred for decision to the Commissioner.
Such decision shall be final, and the Collector, if he is so directed by such decision, shall, subject to
the provisions of section 28, cause the said applicant to be placed in occupation of the land so marked out
or of the water-course to be transferred, as the case may be.
28. Expenses to be paid by applicant before receiving occupation.—No such applicant shall be
placed in occupation of such land or water-course until he has paid to the person named by the Collector
such amount as the Collector determines to be due as compensation for the land or water-course so
occupied or transferred, and for any damage caused by the marking out or occupation of such land,
together with all expenses incidental to such occupation or transfer.
Procedure in fixing compensation.—In determining the compensation to be made under this section
the Collector shall proceed under the provisions of the Land Acquisition Act, 18701 (10 of 1870); but he
may, if the person to be compensated so desires, award such compensation in the form of a rent-charge
payable in respect of the land or water-course occupied or transferred.
Recovery of compensation and expenses.—If such compensation and expenses are not paid when
demanded by the person entitled to receive the same, the amount may be recovered by the Collector as if
it were an arrear of land-revenue, and shall, when recovered, be paid by him to the person entitled to
receive the same.
29. Conditions binding on applicant placed in occupation.—When any such applicant is placed in
occupation of land or of a water-course as aforesaid, the following rules and conditions shall be binding
on him and his representative in interest:—
First.—All works necessary for the passage across such water-course, of water-courses existing
previous to its construction and of the drainage intercepted by it, and for affording proper
communications across it for the convenience of the neighbouring lands, shall be constructed by the
applicant, and be maintained by him or his representative in interest to the satisfaction of the
Divisional Canal-officer.
Second.—Land occupied for a water-course under the provisions of section 22 shall be used only
for the purpose of such water-course.
Third.—The proposed water-course shall be completed to the satisfaction of the Divisional Canal-
officer within one year after the applicant is placed in occupation of the land.
In cases in which land is occupied or a water-course is transferred on the terms of a rent-charge.
1. See now the Land Acquisition Act, 1894 (1 of 1894).
Fourth.—The applicant or his representative in interest shall, so long as he occupies such land or
water-course, pay rent for the same at such rate and on such days as are determined by the Collector
when the applicant is placed in occupation.
Fifth.—If the right to occupy the land cease owing to a breach of any of these rules, the liability to
pay the said rent shall continue until the applicant or his representative in interest has restored the
land to its original condition, or until he has paid, by way of compensation for any injury done to the
said land, such amount and to such persons as the Collector determines.
Sixth.—The Collector may, on the application of the person entitled to receive such rent or
compensation, determine the amount of rent due or assess the amount of such compensation; and, if
any such rent or compensation be not paid by the applicant or his representative in interest, the
Collector may recover the amount, with interest thereon at the rate of six per cent. per annum from
the date on which it became due, as if it were an arrear of land-revenue, and shall pay the same, when
recovered, to the person to whom it is due.
If any of the rules and conditions prescribed by this section are not complied with,
or if any water-course constructed or transferred under this Act is disused for three years
continuously,
the right of the applicant, or of his representative in interest, to occupy such land or water-course
shall cease absolutely.
30. Procedure applicable to occupation for extensions and alterations.—The procedure
hereinbefore provided for the occupation of land for the construction of a water-course shall be
applicable to the occupation of land for any extension or alteration of a water -course, and for
the deposit of soil from water-course clearances.
STATE AMENDMENT
Uttar Pradesh
Addition of new section 30-A to 30-G in Act No. VIII of 1873.—After section 30 of the principal
Act, the following shall be added as new sections 30-A to 0-G :
“30-A. Preparation of the scheme for an irrigable command area.—The Divisional Canal
Officer may, with a view to providing for or improving irrigation facilities in an irrigable command
area, prepare a scheme for the construction of water-courses and the carrying out of any work
connected therewith in such area, anything to the contrary contained in any other law
notwithstanding. The scheme shall contain—
(i) a plan showing the site of the outlet, the existing water-courses, if any, the proposed
water-courses and works connected therewith, and the areas already served and to be served by
the existing or proposed watercourses;
(ii) a statement showing the estimated cost of constructing the proposed water-courses and
works connected therewith ;
(iii) a memorandum showing the manner in which the scheme may be implemented; and
(iv) such other particulars as may be prescribed.
30-B. Calling upon the Gaon Sabhas to implement the scheme.—(1) The Divisional Canal
Officer shall, as soon as may be, forward a copy of the scheme prepared under section 30-A to each
of the Gaon Sabhas and Block Development Officers within whose jurisdiction the land affected
thereby is situate, and call upon the Gaon Sabhas to submit to him within a period of thirty days from
the date of receipt of the copy, their approval or the scheme, or any objections, suggestions or
modifications thereto.
(2) The copy of the scheme shall, within three days of its receipt by the Gaon Sabha, be affixed
by it on its notice board, and shall, within twelve days thereafter, be considered in a meeting of the
Gaon Panchayat convened for the purpose and the decision of the Gaon Panchayat shall be deemed to
be for and on behalf of the Gaon Sabha concerned. The decision shall be communicated to the
Divisional Canal Officer within the time allowed under sub-section (1).
(3) If no objections, modifications or suggestions are submitted by any of the Gaon Sabhas within
the time specified in sub-section (1), the Gaon Sabhas shall be deemed to have approved the scheme,
which shall thereupon become final.
(4) Upon receipt of the objections, modifications or suggestions, made by the Gaon Sabhas under
sub-section (2), the Divisional Canal Officer may either confirm the scheme or amend or modify it
and thereupon the scheme so confirmed, amended or modified, shall become final.
(5) When the scheme has become final, the Divisional Canal Officer shall, by notice in writing,
call upon the Gaon Sabhas concerned to take all such steps as may be necessary for the
implementation of the scheme, and in particular to construct or cause to be constructed, the water-
courses and carry out, or cause to be carried out, all works connected therewith, within the period
fixed therefor in the notice, which may be extended from time to time.
30-C. Securing or acquiring land for the scheme.—(1) Upon receipt of the notice mentioned in
sub-section (5) of section 30-B, the Gaon Sabha shall give to all persons on whose land any water-course
is proposed to be constructed, or on which any work connected therewith is proposed to be carried out,
option to transfer by way of gift or surrender, as the case may be, free from all encumbrances, within the
period provided therefor in the notice, so much of the said land in its favour as may be necessary for the
implementation of the scheme.
(2) Where any land required for the implementation of the scheme is not transferred to, or
surrendered in favour of the Gaon Sabha under subsection (1), it may —
(i) either purchase the land at such rates as may be prescribed ; or
(ii) move the State Government to acquire the same under the Land Acquisition Act, 1894 (Act
no. 1 of 1894) ; or
(iii) If the land for construction of water-courses is likely to be required for a limited period
only, apply to the Requisitioning Authority under section 6 of U. P. Rural Development
(Requisitioning of Land) Act, 1948 (U.P. Act no XXVII of 1948) to requisition the land ;
Provided that if it appears after the construction of water-courses on the land so requisitioned that the
alignment of the water-courses as constructed will be retained unchanged for long the Gaon Sabha shall,
as early as possible, move the State Government to acquire the land on a permanent basis.
(3) Where, on the application of the Gaon Sabha under sub-section (2), any land has been acquired in
accordance with the provisions of the Land Acquisition Act, 1894 (Act no. 1 of 1894), the State
Government shall, subject to such terms and conditions as may be imposed by it in this behalf, transfer to,
or vest in, the Gaon Sabha, the land so acquired for the implementation of the scheme.
(4) The land transferred to, or vested in, the Gaon Sabha under subsection (3), or of which the
management has been vested in the Gaon Sabha under section 11 of the U. P. Rural Development
(Requisitioning of Land) Act, 1948 (U.P. Act no. XXVII of 1948), shall be utilized by the Gaon Sabha for
the implementation of the scheme, and it shall construct or cause to be constructed, in the manner
hereinafter provided, the water-courses, and carry out or cause to be carried out, all works connected
therewith as may be necessary for the implementation of the scheme.
(5) In implementing the scheme the Gaon Sabha shall, in the first instance, give option, by notice in
writing, published the manner prescribed, to all persons having a holding in the irrigable command area,
to construct, within such time as may be fixed therefor in the notice, the water courses, and carry out all
such work connected therewith, as may be necessary for the implementation of the scheme.
(6) Where the persons concerned fail to construct the whole or any part of any water-course, or to
carry out any work connected therewith, in accordance with the scheme, the Gaon Sabha shall construct,
or carry out, or cause to be constructed, or carried out, the same in the manner provided under
section 17 of the Uttar Pradesh Panchayat Raj Act, 1947, for the execution of small Irrigation projects.
30-D. Inspection of work by the Divisional Canal Officer.—(1) On the expiry of the period or
extended period, as the case may be, specified in the notice under sub-section (5) of section 30-B, the
Divisional Canal Officer shall inspect, or cause to be inspected, the water courses and all works
connected therewith, constructed or carried out, by the Gaon Sabha, either directly or through the tenure-
holders of the irrigable command area, and if the same are in accordance with scheme and otherwise
properly constructed, or carried out, approve the same.
(2) Where the water-courses or all works connected therewith, have not been properly constructed or
carried out in accordance with the scheme, the Divisional Canal Officer, shall, by order in writing, require
the Gaon Sabha concerned to remove and remedy, or cause to be removed and remedied, all the defects
within the period specified in the order.
(3) On the expiry of the period allowed in the order under sub-section (2), the Divisional Canal
Officer shall again inspect, or cause to be inspected, the water-courses, and all works connected
therewith, and shall either approve or dis-approve the same.
30-E.Implementation of the scheme by the State Government. —Where the Gaon Sabha fails —
(i) to take all or any of the steps required to be taken by it in accordance with the provisions of
section 30-C ; or
(ii) to construct, or cause to be constructed, the whole of the watercourses, or to carry out all
works connected therewith, in accordance with the scheme, within the period or the extended period
provided therefor in the notice under sub-section (5) of section 30-B ; or
(iii) to remove the defects in the water-courses or in any work connected therewith as required to
be done under sub-section (2) of section 30-D, or to obtain final approval of the Divisional Canal
Officer in respect of them under sub-section (3) of the said section ;
the State Government shall take all such steps, including acquisition of the land, as may be necessary for
the implementation of the scheme, and cause to be constructed and carried out the water-courses and all
works connected therewith in accordance with the scheme.
30-F.Vesting of water-courses etc. in the Gaon Sabha.—With effect from the date a notification in
this behalf is published in the Gazette by the State Government, and subject to such terms and conditions
as may be prescribed, all the water-courses and all works carried out by the State Government in
connection with the implementation of the scheme, shall vest in the Gaon Sabha within whose jurisdiction
the same lie.
30-G. Maintenance of the watercourses, etc.—The Gaon Sabha shall at all times maintain and keep
in good repairs all the water-courses, and all the works connected therewith, constructed or carried out by
it, or vested in it under section 30-F.
[Vide Uttar Pradesh Act V of 1963, s. 3]
Uttar Pradesh
Insertion of new section 30-EE is Act no. 8 of 1873.—After section 30-E of the Northern India
Canal and rainage Act, 1873, amended in its application to Uttar Pradesh, the following section shall be
inserted, namely :—
“30-EE. Special provisions in respect of major irrigation projects.—(1) In any area covered
by the Command of the Gandak, the Sharda Sahayak or the Ram Ganga Irrigation Project or any
other major project specified in this behalf by the State Government by notification in the Gazette, the
Divisional Canal Officer of the Irrigation Division may prepare a scheme containing the particulars
referred to in section 30-A, and hereupon he may take all such steps as may be necessary for the
implementation of the scheme, and cause to be constructed and carried out water-courses and all
works connected therewith in accordance with the scheme, and nothing in sections 30-B, 30-C, 30-D
and 30-E, shall apply in relation to such scheme.
(2) Without prejudice to the generality of the provisions of sub-section (1), the Divisional Canal
Officer may —
(a) apply to the requisitioning authority under the U. P. Rural Development (Requisitioning
of Land) Act, 1948, to requisition any land required for implementation of the scheme ; or
(b) move the State Government to acquire under the Land Acquisition Act, 1894, any land
required for implementation of the scheme ; or
(c) take action both under clauses (a) and (b), namely, to have land requisitioned in the first
instance, and thereafter acquired.
(3) The Divisional Canal Officer may delegate his functions under sub-section (2) to a
Sub-divisional Canal Officer.
(4) The provisions of sections 30-F, 30-G and 36-A, shall apply in relation to a scheme prepared
under this section and to water-courses and other works constructed under such scheme as they apply
to any scheme referred to in sections 30-A, 30-B, 30-C, 30-D and 30-E and to water-courses and
other works constructed in accordance therewith.”
[Vide Uttar Pradesh Act 16 of 1974, s. 2]
PART IV
OF THE SUPPLY OF WATER
31. In absence of written contract, water-supply to be subject to rules.—In the absence
of a written contract, or so far as any such contract does not extend, every supply of
canal-water shall be deemed to be given at the rates and subject to the conditions prescribed
by the rules to be made by the State Government in respect thereof.
32. Conditions as to.—Such contracts and rules must be consistent with the following
conditions:—
(a) power to stop water-supply.—The Divisional Canal-officer may not stop the supply of water
to any water-course, or to any person, except in the following cases:—
(1) whenever and so long as it is necessary to stop such supply for the purpose of
executing any work ordered by competent authority and with the previous sanction of
the State Government;
(2) whenever and so long as any water-course is not maintained in such proper customary
repair as to prevent the wasteful escape of water therefrom;
(3) within periods fixed from time to time by the Divisional Canal-officer;
(b) claims to compensation in case of failure or stoppage of supply.—No claim shall be made
against the State Government for compensation in respect of loss caused by the failure or
stoppage of the water in a canal, by reason of any cause beyond the control of the State
Government or of any repairs, alterations or additions to the canal, or of any measures
taken for regulating the proper flow of water therein, or for maintaining the established
course of irrigation which the Divisional Canal-officer considers necessary; but the person
suffering such loss may claim such remission of the ordinary charges payable for the use
of the water as is authorised by the State Government:
(c) claims on account of interruption from other causes.—If the supply of water to
any land irrigated from a canal be interrupted otherwise than in the manner described in the
last preceding clause, the occupier or owner of such land may present a petition for
compensation to the Collector for any loss arising from such interruption, and the Collector
may award to the petitioner reasonable compensation for such loss:
(d) duration of supply.—When the water of a canal is supplied for the irrigation of
a single crop, the permission to use such water shall be held to continue only until that
crop comes to maturity, and to apply only to that crop; but , if it be supplied for irrigating
two or more crops to be raised on the same land within the year, such permission shall be
held to continue for one year from the commencement of the irrigation, and to apply to
such crops only as are matured within that year:
(e) sale or subletting of right to use canal-water.—Unless with the permission of the
Superintending Canal-officer, no person entitled to use the water of any canal, or any
work, building or land appertaining to any canal, shall sell or sublet or otherwise transfer
his right to such use:
Provided that the former part of this clause shall not apply to the use by a cultivating
tenant of water supplied by the owner of a water-course for the irrigation of the land held
by such tenant:
transfer, with land, of contracts for water.—But all contracts made between the State
Government and the owner or occupier of any immovable property, as to the supply of
canal-water to such property, shall be transferable therewith, and shall be presumed to have
been so transferred whenever a transfer of such property takes place:
(f) No right acquired by user.—No right to the use of the water of a canal shall be, or
be deemed to have been, acquired under the 1Indian Limitation Act, 1877 (15 of 1877),
Part IV, nor shall the State Government be bound to supply any person with water except in
accordance with the terms of a contract in writing.
PART V
OF WATER-RATES
33. Liability when person using unauthorisedly cannot be identified.—If water supplied through a
water-course be used in an unauthorised manner, and if the person by whose act or neglect such use has
occurred cannot be identified,
the person on whose land such water has flowed if such land has derived benefit therefrom,
or if such person cannot be identified or if such land has not derived benefit therefrom, all
the persons chargeable in respect of the water supplied through such water -course, shall be
liable, or jointly liable, as the case may be, to the charges made for such use.
34. Liability when water runs to waste.—If water supplied through a water-course be
suffered to run to waste, and if, after enquiry by the Divisional Canal-officer, the person
through whose act or neglect such water was suffered to run to waste cannot be discovered, all
the persons chargeable in respect of the water supplied through such water-course shall be
jointly liable for the charges made in respect of the water so wasted.
35. Charges recoverable in addition to penalties.—All charges for the unauthorised use or
for waste of water may be recovered in addition to any penalties incurred on account of such
use or waste.
Decision of questions under sections 33 and 34.—All questions under section 33 or section
34 shall be decided by the Divisional Canal-officer, subject to an appeal to the head Revenue-
officer of the district, or such other appeal as may be provided under section 75.
STATE AMENDMENT
Uttar Pradesh
Amendment of section 36 of Act no. VIII of 1873.—In section 35 of the Northern India Canal and
Drainage Act, 1873, hereinafter referred to as the principal Act, for the words “shall be determined by the
rules to be made by the State Government”, the words “and any other incidental charges shall be
determined by the rules to be made by the State Government”, shall be substituted.
[Vide Uttar Pradesh Act 22 of 1979, s. 2]
36. Charge on occupier for water, how determined.—The rates to be charged for canal-
water supplied for purposes of irrigation to the occupiers of land shall be determined by the rules
1. See now the Indian Limitation Act, 1963 (36 of 1963).
to be made by the State Government, and such occupiers as accept the water shall pay for
accordingly.
“Occupier’s rate”.—A rate so charged shall be called the “occupier’s rate”.
1[The rules hereinbefore referred to may prescribe and determine what persons or classes of
persons are to be deemed to be occupiers for the purposes of this section, and may also determine
the several liabilities, in respect of the payment of the occupier ’s rate, of tenants and of persons to
whom tenants may have sublet their lands or of proprietors and of persons to whom proprietors
may have let the lands held by them in cultivating occupancy.]
STATE AMENDMENT
Uttar Pradesh
Addition of new section 36-A in Act no. VIII of 1873.— After section 36 of the principal Act, the
following shall be added as a new section 36-A:—
“36-A. (1) There shall be levied on and collected from in the manner prescribed, the persons
mentioned in sub-section (2) a development charge for recovering the cost of the land acquired or
requisitioned and the cost of construction of the water-courses, and all works carried out, in connection
with the implementation of the scheme, calculated —
(i) for the cost of acquisition and requisition of the land at the rate of 40 Naya Paise per acre per
annum ; and
(ii) for the cost of constructing the water-courses and for carrying out the works connected
therewith, at the rate of 60 Naya Paise per acre per annum.
(2) Every person having a holding in the irrigable command area except those who have surrendered
or transferred by way of gift, as the case may be, to the Gaon Sabha such portion of their land on which
any watercourse has been constructed, or on which any work connected therewith has been carried out,
shall be liable and pay till such time as the cost together with interest at 4 per cent per annum on the same,
has been realized in full to the State Government, if the cost of acquisition has been met out of the
Consolidated Fund of the State, or to the Gaon Sabha, if the compensation for acquisition or requisition
has been paid by the Gaon Sabha, a development charge levied under clause (i) of sub-section (1), and
every person in that area, who has failed to implement the scheme in accordance with the provisions of
sub-section (5) of section 30-C, or sub-section (2) of section 30-D, so far as it relates to his land, shall, in
lieu of the benefits derived from the implementation of the scheme, pay till such time as the expenditure
incurred in this connection, together with interest at 4 per cent per annum on the same, has been realized
in full, to the State Government or the Gaon Sabha, whose ever may have constructed the water-courses
or carried out the works connected therewith, in the implementation of the scheme, a development charge
levied at the rate provided in clause (ii) of sub-section (1) ;
Provided however that the development charges shall in the first instance be payable to the State
Government till such time as the expenditure incurred by it in this connection, together with interest at 4
per cent per annum on the same, has been realized in full.”
[Vide Uttar Pradesh Act V of 1963, s. 4]
37. ‘Owner’s rate’.—In addition to the occupier’s rate, a rate to be called the “owner’s rate”
may be imposed according to rules to be made by the State Government, on the owners of canal-
irrigated lands, in respect of the benefit which they derive from such irrigation.
38. Amount of owner’s rate.—The owner’s rate shall not exceed the sum which, under
the rules for the time being in force for the assessment of land -revenue, might be assessed on
such land on account of the increase in the annual value of produce thereof caused by the
canal-irrigation. And, for the purpose of this section only, land which is permanently settled
1. Ins. by Act 16 of 1899, s. 2.
or held free of revenue shall be considered as though it were temporarily settled and liable to
payment of revenue.
39. Owner’s rate, when not chargeable.—No owner’s rate shall be chargeable either on
the owner or occupier of land temporarily assessed to pay land-revenue at irrigation-rates,
during the currency of such assessment.
140. When occupier is to pay both owner’s rate and occupier’s rate.—If such land is occupied by
the owner,
or if it is occupied by a tenant whose rent is not liable to enhancement on the ground that
the value of the produce of the land or the productive po wers of the land has or have been
increased by irrigation,
such owner or tenant shall pay the owner ’s rate as well as the occupier’s rate.
141. Power to make rules for apportioning owner’s rate.—In the case of a tenant with a
right of occupancy, the State Government shall have power to make rules for dividing the
owner’s rate between such tenant and his landlord, proportionately to the extent of t he
beneficial interest of each in the land.
142. When owner is to pay owner’s rate.— If the owner of the land is not the occupier, but has
power to enhance the rent of the occupier on the ground that the value of the produce or the productive
powers of the land has or have been increased by irrigation,
or if, when the amount of a rent was fixed, the land was irrigated from the canal,
the owner shall pay the owner’s rate.
143. Effect of introduction of canal-irrigation on landlord’s right to enhance.—If a
revision of settlement is a ground for entertaining a suit for the enhancement of rent, the
introduction of canal-irrigation into any land shall have the same effect on the landlord ’s right
to re-enhance the rent of a tenant with a right of occupancy of such land, as if a revision of
settlement had taken place, under which the revenue payable in respect of such land had been
increased.
44. Water-rate by whom payable, when charged on land held by several
owners.—Where a water-rate is charged on land held by several joint owners, it shall be
payable by the manager or other person who receives the rents or profits of such land, and
may be deducted by him from such rents or profits before division, or may be recovered by
him from the persons liable to such rate in the manner customary in the recovery of other
charges on such rents or profits.
Recovery of charges
45. Certified dues recoverable as land-revenue.—Any sum lawfully due under this Part,
and certified by the Divisional Canal-officer to be so due, which remains unpaid after the day
on which it becomes due, shall be recoverable by the Collector from the person liable for the
same as if it were an arrear of land-revenue.
46. Power to contract for collection of canal-dues.—The Divisional Canal-officer or the
Collector may enter into an agreement with any person for the collection and payment to the
State Government by such person of any sum payable under this Act by a third party.
When such agreement has been made, such person may recover such sum by suit as though it
were a debt due to him, or an arrear of rent due to him on account of the land, work or building
in respect of which such sum is payable, or for or in which the canal -water shall have been
supplied or used.
1. ss. 40 to 43 rep. in the Punjab by the Punjab Tenancy Act, 1887 (16 of 1887), s. 3 and the Schedule.
If such person makes default in the payment of any sum collected by him under this section, such sum
may be recovered from him by the Collector under section 45; and, if such sum or any part of it be still
due by the said third party, the sum or part so due may be recovered in like
The text continues in the official source.
