Beta
HK Cap. 311R
HK Cap. 311R — Air Pollution Control (Construction Dust) Regulation
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.
Analyze this law with AIAir
Pollution
Control
(Construction
Dust)
Regulation ( Cap.
311,
section
43 ) (Enacting provision omitted— E.R. 1 of
2023 ) [16
June 1997] L.N.
304 of 1997 (Format changes— E.R. 1 of 2023 ) 1. (Omitted as spent— E.R. 1 of 2023 ) 2. Interpretation
(1)
In this Regulation, unless the context otherwise requires—
construction
site
( 建造工地 ) means a place where construction
work is or is intended to be carried out and includes any area, whether located
in such a place or elsewhere, that is used for the storage of—
(a) dusty materials or plant used or intended to be used for the purpose of the construction work; or
(b) dusty materials produced as a result of the construction work being carried out;
construction
work
( 建造工程 ) means—
(a) the construction, demolition, reconstruction, shoring, alteration, maintenance or repair of the whole or any part of any arch, bridge, building, chimney, dock, hoarding, shelter, tunnel, wall, pier, wharf or other structure or any road, slope, embankment, street, railway, tramway, airport, channel, drain, service lane, water conduit, lighting or public utility;
(b) dredging;
(c) the extraction from the earth of any matter whatsoever;
(d) piling;
(e) quarrying;
(f) reclamation;
(g) site formation;
(h) any work involved in preparing for any operation of the type referred to in paragraph (a), (b), (c), (d), (e), (f) or (g); and
(i) the use of machinery, plant, tools, gear and material in connection with or for any operation referred to in paragraph (a), (b), (c), (d), (e), (f), (g) or (h);
contractor
( 承建商 ) means any person or firm engaged in
carrying out construction work by way of trade or business, either on his own
account or pursuant to a contract or arrangement entered into with another person or
firm, including the Government or any public body;
dusty
materials
( 易生塵埃物料 ) includes cement, earth, pulverized
fuel ash, aggregates, silt, stonefines, sand, debris, sawdust and wooden
chips;
emergency
work
( 緊急工程 ) means—
(a) work that is required under emergency situations where human life or building safety is immediately threatened or is being threatened; or
(b) repair work that is immediately required as a result of failure of utility services, road collapse or road blockade due to natural uncontrollable forces or accidents;
excluded
work
( 除外工程 ) means—
(a) renovation, maintenance and alteration work carried out entirely within the external walls and under the roof of a building;
(b) work carried out exclusively for asbestos investigation, abatement and removal;
(c) any specified process;
(d) work carried out entirely within a tunnel (except work carried out in any part of the tunnel that is within 100 m of any exit to the open air);
(e) work carried out entirely under water;
(f) repair work (including cleansing and inspection) to an underground sewer, drain, culvert or other pipeline that is carried out entirely within the confines of such sewer, drain, culvert or pipeline;
(g) paint brushing and patch repairs carried out on the outer surface of the external wall or the upper surface of the roof of a building;
(h) work carried out in a quarry including any associated rehabilitation of the excavated surface; or
(i) farming or archaeological activities;
notifiable
work
( 應呈報工程 ) means—
(a) site formation;
(b) reclamation;
(c) demolition of a building;
(d) work carried out in any part of a tunnel that is within 100 m of any exit to the open air;
(e) construction of the foundation of a building;
(f) construction of the superstructure of a building; or
(g) road construction work, but does not include any emergency work, excluded work or regulatory work;
plant
( 裝置 ) includes any plant, equipment, gear,
machinery, apparatus or appliance, or any part thereof;
reclamation
( 填海工程 ) has the same meaning as in
section 2 of the Foreshore and Sea-bed (Reclamations) Ordinance ( Cap. 127 );
regulatory
work
( 規管工程 ) means—
(a) renovation carried out on the outer surface of the external wall or the
upper surface of the roof of a building;
(b) road opening or resurfacing work;
(c) slope stabilization work; or
(d)
any work involving any of the following activities— (i) stockpiling of dusty materials; (ii) loading, unloading or transfer of dusty materials; (iii) transfer of dusty materials using a belt conveyor system; (iv) use of vehicles; (v) pneumatic or power-driven drilling, cutting and
polishing; (vi) debris handling; (vii) excavation or earth moving; (viii) concrete production; (ix) site clearance; or (x) blasting,
but does not include any emergency work, excluded work or notifiable
work;
road
construction
work
( 道路建造工程 ) means construction of any permanent
road, bridge or underpass for vehicular traffic but does not include any maintenance
or resurfacing work to an existing road, bridge or underpass;
road
opening or resurfacing
work
( 道路開掘或重鋪工程 ) includes excavation,
backfilling to trenches, and temporary or permanent reinstatement of existing
roads, streets, footway or bridges for the purpose of—
(a) maintenance or resurfacing;
(b) erection of poles or structures;
(c) trial hole opening; or
(d) laying or repairing of pipes, cables, ducts, valve boxes, chambers or any other utility services;
site
formation
( 工地平整工程 ) includes—
(a) excavations on sloping land;
(b) filling;
(c) any earth moving work for preparation of a construction site; and
(d) groundwater drainage work as defined in section 2 of the Buildings Ordinance ( Cap. 123 );
specified
( 指明 ), in relation to a form or the
particulars to be given on a form, means specified by the Authority;
utility
services
( 公用服務設施 ) means public services involving
electricity, lighting, traffic control, gas, telecommunications, cable television,
water supply, drainage and sewerage, public transportation, and any associated
supporting services. ( 36 of 2000 s. 28 )
(2) For the purpose of this Regulation, a contractor is responsible for a construction site if he is carrying out construction work at the site or, where more than one contractor is carrying out construction work at the site, if he is the principal contractor carrying out such work. 3. Notification
(1) The contractor responsible for a construction site where any notifiable work is proposed to be carried out shall give notice to the Authority of the proposal to carry out the work.
(2) A notice under subsection (1) shall be given to the Authority before the proposed notifiable work commences to be carried out and shall be in the specified form and include the specified particulars.
(3) Where any change relating to any of the particulars given in a notice under subsection (1) is proposed, the contractor responsible for the construction site shall give notice to the Authority of the proposed change.
(4) A notice under subsection (3) shall be given to the Authority before the proposed change takes effect and shall be in the specified form and include the specified particulars.
(5) Any person who contravenes this section commits an offence and is liable to a fine at level 4 on conviction for a first offence and to a fine at level 5 on conviction for a second or subsequent offence. 4. Control of notifiable works
(1) The contractor responsible for a construction site where a notifiable work is being carried out shall ensure that the work is carried out in accordance with the Schedule .
(2) Any person who contravenes subsection (1) commits an offence and is liable to a fine at level 5 on conviction for a first offence and to a fine at level 6 and to imprisonment for 3 months on conviction for a second or subsequent offence, and in addition, if the offence is a continuing offence, to a fine of $10,000 for each day during the whole or any part of which the offence continues. 5. Control of regulatory works
(1) The contractor responsible for a construction site where a regulatory work is being carried out shall ensure that the work is carried out in accordance with the Schedule .
(2) Any person who contravenes subsection (1) commits an offence and is liable to a fine at level 4 on conviction for a first offence and to a fine at level 5 on conviction for a second or subsequent offence, and in addition, if the offence is a continuing offence, to a fine of $5,000 for each day during the whole or any part of which the offence continues. 6. Control of storage of dusty materials associated with excluded works
(1)
The contractor responsible for a construction site where an excluded work is being carried out shall ensure that any dusty materials which are—
(a) used or intended to be used for the purpose of the excluded work; or
(b) produced as a result of the excluded work being carried out, and which are stored outside the site are stored and handled in accordance with any relevant provisions of the Schedule .
(2) Any person who contravenes subsection (1) commits an offence and is liable to a fine at level 4 on conviction for a first offence and to a fine at level 5 on conviction for a second or subsequent offence, and in addition, if the offence is a continuing offence, to a fine of $5,000 for each day during the whole or any part of which the offence continues.
(3)
In this section and section 8(4) ,
construction
site
( 建造工地 ) means any place where construction
work is or is intended to be carried out. 7. Defence of due diligence, etc.
It is a defence to a charge against any person for an offence under section 4 , 5 or 6 for the person charged to prove that—
(a) interruptions or contingencies in the supply of necessary materials, water and equipment;
(b) weather conditions prevailing at the time of the offence;
(c) a threat or an imminent threat to human life or building
safety;
(d) the physical constraints of the construction site; or
(e) circumstances beyond his control other than those referred to in paragraphs (a), (b), (c) and (d), ( L.N. 238 of 1997 ) prevented him from complying with that section and that he exercised due diligence to avoid the commission of the offence. ( L.N. 238 of 1997 ) 8. Transitional
(1)
Except as provided in subsection (2), this Regulation does not apply
to—
(a) any notifiable work or regulatory work that has commenced to be carried out
before the day on which this Regulation comes into
operation * ; or
(b)
any notifiable work or regulatory work— (i) the tender for which was submitted or, where there was no tender, the
contract for which was entered into on or before the day on which this
Regulation comes into operation; and ( L.N. 238 of
1997 ) (ii) that commences to be carried out not later than 1 year after that
day.
(2) If a notifiable work or regulatory work referred to in subsection (1) is still
being carried out on the date that is 1 year after the day on which this Regulation
comes into operation, this Regulation (except section 3 ) shall apply to
that work commencing on that date.
(3)
Except as provided in subsection (4), section 6 does not apply to the
storage of dusty materials which are used or intended to be used for the purpose of
an excluded work, or produced as a result of an excluded work being carried out,
if—
(a) the excluded work has commenced to be carried out before the day on which
this Regulation comes into operation; or
(b) the tender for the excluded work was submitted or, where there was no
tender, the contract for the excluded work was entered into on or before the day
on which this Regulation comes into operation and the excluded work commences to
be carried out not later than 1 year after that day. ( L.N. 238 of
1997 )
(4) If an excluded work referred to in subsection (3) is still being carried out on
the date that is 1 year after the day on which this Regulation comes into operation,
section 6 shall, commencing on that date, apply in respect of any
dusty materials which are stored outside the construction site where the excluded
work is being carried out, whether or not the dusty materials are so stored before
or after that date.
Editorial Note:
* Operation date: 16 June
1997.
Schedule [ ss. 4 , 5 & 6 ] Dust
Control
Requirements Part
I Control Requirements
for
Notifiable
Works 1. Site
formation In the case of site formation, any relevant requirements set out in Parts
III and IV shall be
met. 2. Reclamation
In the case of reclamation—
(a) if a stockpile of dusty materials is more than 1.2 m high and lies
within 50 m from any site boundary that adjoins a road, street, service lane
or other area accessible to the public, the stockpile shall be properly
treated and sealed with latex, vinyl, bitumen or other suitable surface
stabilizer; and
(b) any relevant requirements set out in Parts III and IV shall be
met. 3. Demolition of a
building
In the case of the demolition of a building—
(a) the area at which demolition work takes place shall be sprayed with
water or a dust suppression chemical immediately prior to, during and
immediately after the demolition activities so as to maintain the entire
surface wet;
(b) for any wall of the building to be demolished that abuts or fronts upon
a street, service lane or other open area accessible to the public,
impervious dust screens or sheeting shall be used to enclose the whole wall
to a height of at least 1 m higher than the highest level of the structure
being demolished;
(c) any dusty materials remaining after a stockpile is removed shall be
wetted with water and cleared from the surface of roads or streets;
and
(d) any relevant requirements set out in Parts III and IV shall be
met. 4. Work carried out in any part of a tunnel that
is within
100 m of any exit to the open air In
the case of work carried out in any part of a tunnel that is within 100 m of any
exit to the open air, any relevant requirements set out in Parts III and IV
shall be
met. 5. Construction of the foundation of a
building In the case of the construction of the foundation of a building, any
relevant requirements set out in Parts III and IV shall be
met. 6. Construction of the superstructure of a
building
In the case of the construction of the superstructure of a
building—
(a) where a scaffolding is erected around the perimeter of a building under
construction, effective dust screens, sheeting or netting shall be provided
to enclose the scaffolding from the ground floor level of the building, or
if a canopy is provided at the first floor level, from the first floor
level, up to the highest level of the scaffolding;
(b) any skip hoist for material transport shall be totally enclosed by
impervious sheeting; and
(c) any relevant requirements set out in Parts III and IV shall be
met. 7. Road construction
work In the case of road construction work, any relevant requirements set out in
Parts III and IV, except section 13(c) , shall be
met. Part
II Control Requirements
for
Regulatory
Works 8. Renovation carried out on the outer surface of the
external
wall or upper surface of the roof of a building
In
the case of renovation carried out on the outer surface of the external wall or
upper surface of the roof of a building—
(a) where a scaffolding is erected around the perimeter of a building under
renovation, effective dust screens, sheeting or netting shall be provided to
enclose the scaffolding from the ground floor level of the building, or if a
canopy is provided at the first floor level, from the first floor level, up
to the highest level of the scaffolding;
(b) any skip hoist used for material transport shall be totally enclosed by
impervious sheeting;
(c) any dusty materials remaining after a stockpile is removed shall be
wetted with water and cleared from the surface of roads or streets;
and
(d) any relevant requirements set out in Parts III and IV shall be
met. 9. Road opening or resurfacing
work
In the case of road opening or resurfacing work—
(a)
any excavated dusty materials or stockpile of dusty materials shall
be— (i) covered entirely by impervious sheeting; or (ii) sprayed with water so as to maintain the entire surface wet, and
removed or backfilled or reinstated within 24 hours of the excavation or
unloading;
(b) a stockpile of dusty materials shall not extend beyond the pedestrian
barriers, fencing or traffic cones;
(c) any dusty materials remaining after a stockpile is removed shall be
wetted with water and cleared from the surface of roads or streets;
and
(d) any relevant requirements set out in Parts III and IV shall be
met. 10. Slope stabilization
work
In the case of slope stabilization work, any relevant requirements set out
in Parts III and IV shall be met except—
(a) section 13(a) ;
(b) section 13(b) ; and
(c) section 13(c) , if the site boundary adjoins any road for
vehicular traffic with or without a
footway. 11. Other regulatory
work In the case of any regulatory work not covered by section 8 ,
9 or 10 , any relevant requirements set out in Parts
III and IV shall be
met. Part
III General
Control
Requirements 12. General requirements
(1) Any air pollution control system, equipment or measure required by any
provision of this Schedule shall be operated or implemented (as
the case may be) properly and effectively whenever the plant or process
concerned is in operation or the activity concerned is engaged in.
(2) In the event of a malfunctioning or breakdown of any air pollution
control system or equipment, the plant, process or activity concerned shall
be stopped as soon as practicable until such time as the air pollution
control system or equipment is restored to proper functioning.
(3) Except for cleaning formwork or other surfaces receiving concrete prior
to concreting or cleaning of slopes prior to shotcreting, a compressed air
jet shall not be used for cleaning or clearing dust from any vehicle,
equipment, other materials or person.
(4)-(5) (Repealed L.N. 238 of
1997 ) 13. Site boundary and entrance
Except for road opening or resurfacing work, or for construction work
carried out in a construction site that is completely paved or completely
covered with hardcore—
(a) vehicle washing facilities including a high pressure water jet shall be
provided at every discernible or designated vehicle exit point;
(b) the area where vehicle washing takes place and the section of the road
between the washing facilities and the exit point shall be paved with
concrete, bituminous materials or hardcores;
(c) where a site boundary adjoins a road, street, service lane or other
area accessible to the public, hoarding of not less than 2.4 m high from
ground level shall be provided along the entire length of that portion of
the site boundary except for a site entrance or
exit. 14. Access
road
(1)
Except for road opening or resurfacing work—
(a)
every main haul road shall be— (i) paved with concrete, bituminous materials, hardcores or metal
plates, and kept clear of dusty materials; or (ii) sprayed with water or a dust suppression chemical so as to
maintain the entire road surface wet;
(b) the portion of any road leading only to a construction site that is
within 30 m of a discernible or designated vehicle entrance or exit
shall be kept clear of dusty materials.
(2)
In this section,
main
haul
road
( 主要運輸通路 ) means any course inside a
construction site having a vehicle passing rate of higher than 4 in any 30
minutes. 15. Cement and dry pulverized fuel ash
(PFA)
(1) Every stock of more than 20 bags of cement or dry pulverized fuel ash
shall be covered entirely by impervious sheeting or placed in an area
sheltered on the top and the 3 sides.
(2) Cement or dry pulverized fuel ash delivered in bulk shall be stored in
a closed silo fitted with an audible high level alarm which is interlocked
with the material filling line such that, in the event of the silo
approaching an overfilling condition, an audible alarm is triggered and the
material filling stops within one minute.
(3) Silos used for the storage of cement or dry pulverized fuel ash shall
not be overfilled.
(4)
Except in the case described in section 25(2) , the loading,
unloading, transfer, handling or storage of—
(a) bulk cement or dry pulverized fuel ash; or
(b) any cement or dry pulverized fuel ash during or after the
de-bagging process, shall be carried out in a totally enclosed system or facility, and
any vent or exhaust shall be fitted with an effective fabric filter or
equivalent air pollution control system or
equipment. 16. Exposed
earth Exposed earth shall be properly treated by compaction, turfing,
hydroseeding, vegetation planting or sealing with latex, vinyl, bitumen,
shotcrete or other suitable surface stabilizer within 6 months after the last
construction activity on the construction site or part of the construction site
where the exposed earth lies. ( L.N. 238 of
1997 ) 17. Dusty materials Cement, pulverized fuel ash or any other dusty materials collected by
fabric filters or other air pollution control system or equipment shall be
disposed of in totally enclosed
containers. Part
IV Control Requirements
for
Individual
Activities 18. Stockpiling of dusty
materials
Any stockpile of dusty materials shall be either—
(a) covered entirely by impervious sheeting;
(b) placed in an area sheltered on the top and the 3 sides; or
(c) sprayed with water or a dust suppression chemical so as to maintain the
entire surface
wet. 19. Loading, unloading or transfer of dusty
materials Except for cement and pulverized fuel ash and for cases where the moisture
content of the dusty materials is a matter of concern, all dusty materials shall
be sprayed with water or a dust suppression chemical immediately prior to any
loading, unloading or transfer operation so as to maintain the dusty materials
wet. 20. Transfer of dusty materials using a belt conveyor
system
(1) Every belt conveyor used for the transfer of dusty materials shall be
enclosed on the top and the 2 sides.
(2) Every transfer point between any 2 belt conveyors shall be totally
enclosed.
(3) An effective belt scraper or equivalent device shall be installed at
the head pulley of every belt conveyor to dislodge fine particles that may
adhere to the belt surface and to reduce carry-back of fine particles on the
return belt, and the belt scraper or equivalent device shall be equipped
with bottom plates or other similar means to prevent falling of materials
from the return belt.
(4) Every stockpiling belt conveyor shall be provided with a mechanism to
adjust its level such that the vertical distance between the belt conveyor
outlet and the material landing point is maintained at not more than 1
m.
(5) The area for the unloading of dusty materials from a belt conveyor
outlet to any stockpile, storage bin, truck and barge shall be enclosed on
the top and the 3
sides. 21. Use of
vehicles
(1) Immediately before leaving a construction site, every vehicle shall be
washed to remove any dusty materials from its body and wheels.
(2) Where a vehicle leaving a construction site is carrying a load of dusty
materials, the load shall be covered entirely by clean impervious sheeting
to ensure that the dusty materials do not leak from the
vehicle. 22. Pneumatic or power-driven
drilling,
cutting and polishing Water
or a dust suppression chemical shall be continuously sprayed on the surface
where any pneumatic or power-driven drilling, cutting, polishing or other
mechanical breaking operation that causes dust emission is carried out, unless
the process is accompanied by the operation of an effective dust extraction and
filtering
device. 23. Debris
handling
(1) Any debris shall be covered entirely by impervious sheeting or stored
in a debris collection area sheltered on the top and the 3 sides.
(2) Every debris chute shall be enclosed by impervious sheeting or similar
materials.
(3) Before debris is dumped into a debris chute, it shall be sprayed with
water or a dust suppression chemical so that it remains wet when it is
dumped. 24. Excavation or earth
moving The working area of any excavation or earth moving operation shall be
sprayed with water or a dust suppression chemical immediately before, during and
immediately after the operation so as to maintain the entire surface
wet. 25. Concrete
production
(1) For concrete production using bulk cement or dry pulverized fuel ash as
raw material, the requirements set out in section 15(2) , (3) and
(4) shall be met.
(2) For production of concrete or any other substances using bagged cement
or dry pulverized fuel ash in a standard bag (not exceeding 50 kg), the
de-bagging, batching and mixing processes shall be carried out in an area
sheltered on the top and the 3
sides. 26. Site
clearance
(1) The working area for the uprooting of trees, shrubs, or vegetation or
for the removal of boulders, poles, pillars or temporary or permanent
structures shall be sprayed with water or a dust suppression chemical
immediately before, during and immediately after the operation so as to
maintain the entire surface wet.
(2) All demolished items (including trees, shrubs, vegetation, boulders,
poles, pillars, structures, debris, rubbish and other items arising from
site clearance) that may dislodge dust particles shall be covered entirely
by impervious sheeting or placed in an area sheltered on the top and the 3
sides within a day of
demolition. 27. Blasting
(1) The areas within 30 m from the blasting area shall be wetted with water
prior to blasting.
(2) Blasting shall not be carried out when the strong wind signal or
tropical cyclone warning signal No. 3 or higher is hoisted unless prior
permission of the Commissioner of Mines is obtained.