Beta
HK Cap. 245J
HK Cap. 245J — Closed Area (Hong Kong Section of the Shenzhen Bay Bridge and Deep Bay Link Portion) Order
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.
Analyze this law with AIClosed
Area (Hong Kong Section of the Shenzhen Bay Bridge and Deep Bay Link Portion)
Order ( Cap. 245, section
36(1) ) (Enacting provision omitted— E.R. 1 of
2019 ) [1 July 2007] L.N. 137 of 2007 (Format changes— E.R. 1 of 2019 ) 1. (Omitted as spent— E.R. 1 of 2019 ) 2. Declaration of closed area The area enclosed by the boundaries set out in Part 1 of the Schedule
( the
Area )
is declared to be a closed area. Schedule [ s. 2 ] Closed
Area Part
1 Boundaries of Closed
Area 1. Horizontal
boundaries
The horizontal boundaries of the Area are the outermost left and right edge lines of—
(a) the Hong Kong section of the Shenzhen Bay Bridge which is described as such and shown stippled black on the map set out in Part 2 ; and
(b) the Deep Bay Link Portion which is described as such and shown coloured grey on the map set
out in Part
2 . 2. Vertical
boundaries
(1)
The upper vertical boundary of the Area is—
(a) in relation to the Hong Kong section of the Shenzhen Bay Bridge
referred to in section 1(a) , set at an elevation of +165 mPD
(metres above Hong Kong Principal Datum); and
(b) in relation to the Deep Bay Link Portion referred to in
section 1(b) , set at an elevation of +60 mPD (metres
above Hong Kong Principal Datum).
(2)
The lower vertical boundary of the Area is—
(a) in relation to the Hong Kong section of the Shenzhen Bay Bridge
referred to in section 1(a) , the bottom parallel edge lines
of the bridge box girders; and
(b) in relation to the Deep Bay Link Portion referred to in
section 1(b) , set at 4 m below the road
surface. Part
2 Map of
Closed
Area
