BC:137_2013:en — Direction to the British Columbia Utilities Commission Respecting the Iskut Extension Project
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.
Analyze this law with AIDefinition
1
In this direction,
Act
means the
Utilities Commission
Act
.
Application
2
This direction is issued to the commission under section 3 of the Act.
Extensions
3
The commission must not exercise its powers under sections 45 (5) of the Act in respect of
the following extensions of the authority's plant or system:
a
a new 287 kV/25 kV substation near Tatogga Lake, consisting of a 287 kV switchyard
and a 25 kV feeder line and related equipment, including communication, voltage support
and protection and control equipment;
b
a new 287 kV transmission line, towers and related equipment, including
communication, voltage support and protection and control equipment, between the Bob Quinn
substation and the Tatogga substation;
c
upgrades to the Bob Quinn substation to extend the 287 kV system to the Tatogga
substation, including communication, voltage support and protection and control
equipment;
d
a new distribution line from the Tatogga substation to the community of
Iskut.
Rates
4
1
Repealed. [B.C. Reg. 24/2019, App. A, s. 1.]
2
In setting rates for the authority under the Act, the commission must ensure that the rates allow the authority to collect sufficient revenue to recover its costs incurred in relation to the extensions referred to in section 3, including, without limitation, costs incurred negotiating, entering into and carrying out agreements with first nations.
[am. B.C. Reg. 24/2019, App. A, s. 1.]