LEGALDIGMLEGALDIGM
    ← Australia
    Beta
    IPA trademark 4.16-extension-of-time-to-file-notice-of-opposition-to-protection

    IPA trademark 4.16-extension-of-time-to-file-notice-of-opposition-to-protection — IP Australia Trade Marks Manual of Practice and Procedure – 60.4.16 Extension of Time to File Notice of Opposition to Protection

    Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.

    4.16.1 Relevant Legislation Madrid Protocol Regulations Rule 16 Possibility of Notification of a Provisional Refusal Based on an Opposition Under Article 5(2)(c) of the Protocol Trade Marks Regulations 1995 ​​​​​​​ Reg 17A.34C Extension of time for filing - application Reg 17A.34D Extension of time for filing - grant Trade Marks Office Manual of Practice and Procedur e Part 47 Procedures for Opposing Registration or Protection 4.16.2 General Description It is possible to extend the period allowed for filing a notice of intention to oppose or a statement of grounds and particulars. When dealing with an application for an extension of time to file Notice of Opposition it is important to remember that IP Australia must notify the IB of any opposition within: four months of the publication of acceptance, or seven months of the publication of acceptance where an extension of time for filing Notice of Opposition has been granted. If the application for the extension of time has been made within the statutory opposition period, it will be granted if the Registrar is satisfied the ground relied upon has been made out. The holder will not be given the opportunity to object to the application for extension of time. The holder will however be notified that an extension of time has been granted. Process The grounds for requesting an extension of time must be checked to ensure they are allowable grounds in terms of subreg 17A.34C(4) . If the extension application has been made in time and the ground(s) have been made out, the extension is granted and recorded in RIO following existing procedures. The extension of time applicant and the holder are notified that the extension has been granted.

    Related guides, FAQ and contract templates